Home / Browse projects / Dakshina Kannada, Karnataka / U T K GALAXY

Registration approved No litigation declared Mixed Development project

U T K GALAXY

By B ABDUL RAHIMAN

RG-KA-28385 · RERA PRM/KA/RERA/1257/336/PR/050123/005600 · Last updated on RERA Karnataka portal: 28 Dec 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Nov 2022Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 79 documents Report an error

U T K GALAXY is a Mixed Development project by B ABDUL RAHIMAN in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/336/PR/050123/005600 on 5 Jan 2023. Possession is promised by 8 Nov 2022.

At a glance

Project

  • NameU T K GALAXY
  • TypeMixed Development
  • Location
    • Bantwala
    • Dakshina Kannada
    • 574231
  • Pincode574231
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/336/PR/050123/005600
  • ReraGenie IDRG-KA-28385

Builder

  • NameB ABDUL RAHIMAN
  • Entity typeProprietorship Firm
  • GSTIN29AMFPS5059Q1Z1
  • Authorized SignatoryB ABDUL RAHIMAN

Key dates

Registered
5 Jan 2023
Promised
8 Nov 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Jan 2023
  • Promised completion8 Nov 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
U T K GALAXY-----51

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 28 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 28 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,053 sq m
Named landowners2
LandownerVillageDistrict
B ABDUL RAHIMAN--
B ABDUL RAHIMAN--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.42 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.40 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 1.50 lakh-
Payment of taxesRs 15,000-
On-site expenditure-Consultants FeesRs 3,000-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMOHAMMED THOUSEEF
EngineerMOHAMMED THOUSEEF
Chartered AccountantDERIL LOBO

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed79

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/336/PR/050123/005600 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Upload profit and loss account and balance sheet, 2021-22 with CA UDIN along with schedule.File: PL BS 21-22.pdf28 Dec 2022
advocate search reportFile: utk legal opinion.pdf28 Dec 2022
advocate search reportFile: legal opnion.pdf28 Dec 2022
guidence value rateFile: valuation.jpg28 Dec 2022
KSPCB CFE.File: kspcb.jpg28 Dec 2022
layout plan Order.File: layout order.pdf28 Dec 2022
village map showing the proposed site.File: village map.jpg28 Dec 2022
Form-6 Engineer certificate for completed project.File: form 6 completion.pdf28 Dec 2022
Certificate from Registered Engineer indicating the structural safety of the building.File: structural certificate.pdf28 Dec 2022
project specificationFile: specification.pdf28 Dec 2022
Agreement for sale(AFS)File: AOS NEW.pdf28 Dec 2022
proforma of Allotment letter in the prescribed format.File: ALLOTMENT LETTER.pdf28 Dec 2022
STP/Septic Tank, Soak pit and sewer line demarcation drawing.File: stp revised.pdf28 Dec 2022
project name and project address and upload the section 3(1) notarized affidavitFile: notorized affidavit.pdf28 Dec 2022
clarificationFile: CLARIFICATION UTK.pdf28 Dec 2022
RTC, survey 66/2A6-
Mutation, survey 66/2A6-
Encumbrance Certificate, survey 66/2A6-
Conversion/Alienation Order, survey 66/2A6-
Sale/Title/Gift Deed, survey 66/2A6-
Khatha, survey 66/2A6-
RTC, survey 65/2A3-
Mutation, survey 65/2A3-
Encumbrance Certificate, survey 65/2A3-
Conversion/Alienation Order, survey 65/2A3-
Sale/Title/Gift Deed, survey 65/2A3-
Khatha, survey 65/2A3-
Registration CertificateFile: GST CERTIFICATE.pdf-
Certificate issued by CA Form 1File: form 1 compressed.pdf-
Certificate issued by Architect Form 2File: form 2.pdf-
Certificate issued by Engineer Form 3File: form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: non litigation.pdf-
Certificate from Chartered AccountFile: form 1 compressed.pdf-
Balance Sheet 2021 - 2022File: BS 2021.pdf-
Balance Sheet 2020 - 2021File: BS 2020.pdf-
Balance Sheet 2019 - 2020File: BS 2019.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL 2021.pdf-
Audited Profit and Loss Statement 2020 - 2021File: PL 2020.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PL 2019.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2021.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2020.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 19.pdf-
LICENCE PLAN-
mescom noc with fees paid receipt-
WATER CONNECTION-
PLAN-
PLAN-
PLAN-
SPECIFICATION-
CONVERSION ORDER_compressed-
CONVERSION ORDER_compressed-
AOS UPDATED-
allotment letter-
formb-
notorized affidavit-
mescom noc with fees paid receipt-
WATER CONNECTION-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
SINGLE SITE PLAN & LAY OUT PLAN-
COMPLETION CERTIFICATE-
guidance value-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep U T K GALAXY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: B ABDUL RAHIMAN

B ABDUL RAHIMAN has 1 registration on RERA Karnataka, including U T K GALAXY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if U T K GALAXY is delayed beyond 8 Nov 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of U T K GALAXY?

The registered promoter entity is B ABDUL RAHIMAN, a proprietorship firm as per the filing. Its GSTIN 29AMFPS5059Q1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in U T K GALAXY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at U T K GALAXY?

The professionals named in the filing: Architect: MOHAMMED THOUSEEF; Engineer: MOHAMMED THOUSEEF; Chartered Accountant: DERIL LOBO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in U T K GALAXY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About U T K GALAXY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save U T K GALAXY to a free account