Home / Browse projects / Raigarh, Maharashtra / TROPICANA VILLAS PHASE 1
TROPICANA VILLAS PHASE 1
By Tropicana Leisure Hospitality Pvt.Ltd
RG-MH-81050 · RERA P52000010185 · Last updated on MahaRERA portal: 30 Sep 2021
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TROPICANA VILLAS PHASE 1 is a Others project by Tropicana Leisure Hospitality Pvt.Ltd in Raigarh, Maharashtra, registered with MahaRERA as P52000010185 on 24 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2019.
At a glance
Project
- NameTROPICANA VILLAS PHASE 1
- TypeOthers
- Location
- Mushet
- Alibag
- Raigarh
- 402208
- Pincode402208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000010185
- ReraGenie IDRG-MH-81050
Builder
- NameTropicana Leisure Hospitality Pvt.Ltd
- Entity typeCompany
- ChairpersonJagdeep singh Jasmer Singh Dhanoa
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Aug 2017
- Promised completion30 Sep 2019
- Revised completionNone
- Buildings15 building records
- Documents filed49 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TROPICANA VILLA 2 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 3 | NA | 2 | 0 | 0 | 0 | 0 |
| VILLA NO 4 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 5 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 6 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 7 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 8 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 9 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 10 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA NO 11 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 12 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA NO 12A/13 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 14 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 15 | NA | 2 | 0 | 0 | 0 | 0 |
| TROPICANA VILLA 16 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building15
As on 30 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
144 of 165 construction stages are filed complete across 15 buildings. The stage furthest along is Slabs of Super Structure, at 25%.
TROPICANA VILLA 291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
VILLA NO 491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 791%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 891%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 1091%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA NO 1191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 1291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA NO 12A/1391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 1491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
TROPICANA VILLA 1540%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 25% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 5% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 5% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
TROPICANA VILLA 1691%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 98% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 75% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JAGDEEPSINGH DHANOA | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUJATA MHATRE |
| Partner | Role in project |
|---|---|
| Tropicana Leisure Hospitality Pvt.Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 30 Sep 2021
Documents filed49
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Grampanchayat NOC for Villa_11zon.pdf | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CERTIFICATE UNDER RERA TROPICANA SIGNED.pdf | 28 Aug 2020 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 for RERA.pdf | 28 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: TROPICANA 31 DEC 19 Arch.pdf | 17 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TROPICANA DEC 19 ACE.pdf | 17 Mar 2020 |
| Certificates of CA (Form 3)File: Ca Certificate Dec 2019.pdf | 17 Mar 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: tropicana Sujata Sept 19.pdf | 14 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: TROPICANA-FORM2_30092019.pdf | 14 Mar 2020 |
| Certificates of CA (Form 3)File: Ca Certificate Sep 2019.pdf | 14 Mar 2020 |
| OtherFile: Letter from Company.PDF | 9 Mar 2020 |
| OtherFile: Tropicana Certificate-converted.pdf | 9 Mar 2020 |
| OtherFile: 2nd Supplementary Agreement (1).pdf | 9 Mar 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-3-19 Sujata Mhatre.pdf | 6 Mar 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-19 Sujata Mhatre.pdf | 6 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_31032019 Vishwajeet.pdf | 6 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_30062019 Vishwajeet.pdf | 6 Mar 2020 |
| Certificates of CA (Form 3)File: Ca Certificate Mar 2019.pdf | 6 Mar 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect Form 1.PDF | 14 Mar 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engg Form 2.pdf | 14 Mar 2019 |
| Certificates of CA (Form 3)File: Certificate of CA Form 3.pdf | 14 Mar 2019 |
| Certificates of CA (Form 5)File: Certificate for RERA.pdf | 12 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1.pdf | 29 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer FORM 2.pdf | 29 Nov 2018 |
| Certificates of CA (Form 3)File: Certificate CA Form 3.pdf | 29 Nov 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of ARCHITECT.pdf | 20 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer.pdf | 20 Jul 2018 |
| Certificates of CA (Form 3)File: Certificate of CA.pdf | 20 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 1.PDF | 12 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect Form 1.pdf | 12 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificates of Architect Form 1.pdf | 12 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer Form 2 .pdf | 12 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer Form 2.pdf | 12 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer Form 2.pdf | 12 Jun 2018 |
| Certificates of CA (Form 3)File: Certificates of CA Form 3.PDF | 12 Jun 2018 |
| Certificates of CA (Form 3)File: Certificates of CA Form 3 .PDF | 12 Jun 2018 |
| Certificates of CA (Form 3)File: Certificates of CA Form 3 .PDF | 12 Jun 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: NA order-compressed (1).pdf | 27 Apr 2018 |
| Building plan approvalFile: Layout Plan.pdf | 15 Aug 2017 |
| Layout approvalFile: Layout Plan.pdf | 15 Aug 2017 |
| PAN CardFile: TLHPL Pan card.PDF | 15 Aug 2017 |
| Copy of the legal title reportFile: title report masir ghole.PDF | 15 Aug 2017 |
| Details of encumbrancesFile: Declaration Encumbrances.PDF | 15 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 15 Aug 2017 |
| Building Plan Approval (IOD)File: Layout Plan.pdf | 15 Aug 2017 |
| Declaration in FORM BFile: Form B Signed (2).pdf | 15 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 15 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate.pdf | 15 Aug 2017 |
| Certificates of CA (Form 3)File: CA Certificate_Tropicana.pdf | 15 Aug 2017 |
| Proforma of Allotment letterFile: Sample Lease Deed .pdf | 15 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 49 filed documents as one ZIP, foldered, with a manifest
Keep TROPICANA VILLAS PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mushet5,900+ in Raigarh
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
Coco Marina
Atharva Realty Private Limited
Alibaug Residential Project
Lodha Developers Limited
Embassy Serenity - Phase 1
FAMA PROPERTIES LIMITED
Alibaug Townhouses
Lodha Developers Limited
AVAS LIVING
AVAS LIVING ALIBAUG LLP
Alibaug Plots
Lodha Developers Limited
See every Raigarh project, with the district possession charts
Builder: Tropicana Leisure Hospitality Pvt.Ltd
Tropicana Leisure Hospitality Pvt.Ltd has 1 registration on MahaRERA, including TROPICANA VILLAS PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if TROPICANA VILLAS PHASE 1 is delayed beyond 30 Sep 2019?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TROPICANA VILLAS PHASE 1?
The registered promoter entity is Tropicana Leisure Hospitality Pvt.Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TROPICANA VILLAS PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TROPICANA VILLAS PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TROPICANA VILLAS PHASE 1?
The professionals named in the filing: Architect: SUJATA MHATRE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TROPICANA VILLAS PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback