Home / Browse projects / Pune, Maharashtra / TRIO HOUSE

Registration lapsed No litigation declared Others project

TRIO HOUSE

By TRIO BUILDCON PVT LTD

RG-MH-44367 · RERA P52100052030 · Last updated on MahaRERA portal: 26 Dec 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 12 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promised12 months past this date
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
13 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

TRIO HOUSE is a Others project by TRIO BUILDCON PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100052030 on 19 Jul 2023. Possession was promised by 31 Oct 2025 and is now 12 months past that date. 8 of the 21 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameTRIO HOUSE
  • TypeOthers
  • Location
    • DESAI ESTATE
    • NEAR SPORTS COMPLEX
    • Baramati (M Cl)
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052030
  • ReraGenie IDRG-MH-44367

Builder

  • NameTRIO BUILDCON PVT LTD
  • Entity typeCompany
  • DirectorsSAKSHI NISHANT MEHTA, SUVARNA KISHOR JOSHI, MANISHA MANOJ POTEKAR
  • Declared earlier projects1 →

Key dates

12 months past promisethis monthRegisteredJul 2023PromisedOct 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Jul 2023
  • Promised completion31 Oct 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed121 files

Current status

38%8 of 21 units booked
98.3%Work done, per cost certificate

Figures as on 26 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TRIO HOUSENA6515621

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

TRIO HOUSE: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area745 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Oct 2025
LandownerVillageDistrict
NISHANT NIRANJAN MEHTABaramati (M Cl)Pune
SAKSHI NIRANJAN MEHTABaramati (M Cl)Pune
KISHOR CHANDRAKANT JOSHIBaramati (M Cl)Pune
SUVARNA KISHOR JOSHIBaramati (M Cl)Pune
MANOJ LAXMANRAO POTEKARBaramati (M Cl)Pune
MANISHA MANOJ POTEKARJalochiPune

Approvals and building plan

Sanctioning authorityBaramati Municipal Council
Permissible FSI1688.34
Proposed, not sanctioned1,688 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHANTILAL SHAHA PANDHARKAR BLDG MAHAVIR PATH BARAMATI 413102
Estimated costRs 4.41 cr
Cost incurredRs 4.33 cr
Work done98.3%
BuildingWingEstimatedIncurred
TRIO HOUSENARs 4.26 crRs 4.23 cr
-NARs 15.00 lakhRs 10.50 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRushikesh Changedia Associates
EngineerSheetal S Jagtap
EngineerNISHANT NIRANJAN MEHTA
Chartered AccountantPRATIK DOSHI
Chartered AccountantSACHIN THERADE
PartnerRole in project
TRIO BUILDCON PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A QA Engineer Certificate FY 24-25.pdf26 Dec 2025
Withdrawal Update Form 1File: Form1 Arch Certificate 1Nov2025.pdf17 Dec 2025
Withdrawal Update Form 1File: Form1 Arch Certificate 1Nov2025.pdf17 Dec 2025
Withdrawal Update Form 2File: Form2 Enginner Certificate 1Nov25.pdf17 Dec 2025
Withdrawal Update Form 2File: Form2 Enginner Certificate 1Nov25.pdf17 Dec 2025
Withdrawal Update Form 3File: Form3 01Nov2025 CA Certificate.pdf17 Dec 2025
Withdrawal Update Form 3File: Form3 01Nov2025 CA Certificate.pdf17 Dec 2025
Form 5 (FY 2024-2025)File: Form5 CA FY24-25.pdf8 Dec 2025
Withdrawal Update Form 1File: Q2 FY25-26 Arch Certificate Form1.pdf5 Nov 2025
Withdrawal Update Form 2File: Q2 25-26 Engineer Certificate Form2.pdf5 Nov 2025
Withdrawal Update Form 3File: Q2 FY 25-26 CA Certificate Form 3.pdf5 Nov 2025
Withdrawal Update Form 1File: Q1 25-25 Arch Certificate Form1.pdf30 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf30 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 CA Certificate Form3.pdf30 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf29 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf29 Oct 2025
Withdrawal Update Form 3File: Q4 24-25 Form3 CA Certificate.pdf29 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf28 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf28 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf28 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf28 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf28 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf28 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf28 Oct 2025
Withdrawal Update Form 1File: Q4 24-25 Form1 Architect Certificate .pdf28 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf28 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf28 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf28 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf28 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf28 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf28 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf28 Oct 2025
Withdrawal Update Form 2File: Q1 FY 24-25 Engineer Certi.pdf28 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 Form3 CA Certificate .pdf28 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 Form3 CA Certificate .pdf28 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 Form3 CA Certificate .pdf28 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 Form3 CA Certificate .pdf28 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 Form3 CA Certificate .pdf28 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 Form3 CA Certificate .pdf28 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 Form3 CA Certificate .pdf28 Oct 2025
Withdrawal Update Form 3File: Q1 25-26 Form3 CA Certificate .pdf28 Oct 2025
Form 1File: Q2 FORM 1 Arch Certificate.pdf18 Sep 2025
Form 2File: Q2 FORM 2 Engi Certificate.pdf18 Sep 2025
Form 3File: Q2 FORM 3 CA Certificate.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q2 Sold Booked Inventory FY 23_24.pdf18 Sep 2025
Form 1File: Q3 FORM 1 Arch Certificate.pdf18 Sep 2025
Form 2File: Q3 FORM 2 Engi Certificate.pdf18 Sep 2025
Form 3File: Q3 FORM 3 CA Certificate.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q3 Sold Booked Inventory FY 23_24.pdf18 Sep 2025
Form 1File: Q4 FORM 1 Arch Certificate.pdf18 Sep 2025
Form 2File: Q4 FORM 2 Engi Certificate.pdf18 Sep 2025
Form 3File: Q4 FORM 3 CA Certificate.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q4 Sold Booked Inventory FY 23_24.pdf18 Sep 2025
Form 1File: Q1 FORM 1 Arch Certificate.pdf18 Sep 2025
Form 2File: Q1 FORM 2 Engi Certificate.pdf18 Sep 2025
Form 3File: Q1 FORM 3 CA Certificate.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q1 Sold Booked Inventory FY 24_25.pdf18 Sep 2025
Form 1File: Q2 FORM 1 Arch Certificate.pdf18 Sep 2025
Form 2File: Q2 FORM 2 Engi Certificate.pdf18 Sep 2025
Form 3File: Q2 FORM 3 CA Certificate.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q2 Sold Booked Inventory FY 24_25.pdf18 Sep 2025
Form 1File: Q3 FORM 1 Arch Certificate.pdf18 Sep 2025
Form 2File: Q3 FORM 2 Engi Certificate.pdf18 Sep 2025
Form 3File: Q3 FORM 3 CA Certificate.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q3 Sold Booked Inventory FY 24_25.pdf18 Sep 2025
Form 1File: Q4 Arch Certificate 24-25.pdf18 Sep 2025
Form 2File: Q4 Engineer Certificate 24-25.pdf18 Sep 2025
Form 3File: Q4 CA Certificate 24-25.pdf18 Sep 2025
Disclosure of Sold and Booked InventoryFile: Q4 Sold Booked Inventory FY 24_25.pdf18 Sep 2025
Form 5 (FY 2023-2024)File: NEW FORM 5 FY 23-24.pdf2 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A Engineer Certificate March 2024.pdf1 Sep 2025
Building plan approvalFile: Building Plan Approval 04_02_25_.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 Architecture Certificate F_Y 24_25.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 CA Certificate Form 3 F_Y 24-25.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Engineer Certificate Form 2 F_Y 24_25.pdf24 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE 27_01_25.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval 04_02_25_.pdf24 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer Certificate Quality Assurance FY 23-24.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 Arch Certificate Form 1.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 CA CERTIFICATE Form 3_compressed.pdf16 Dec 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
M/S RAJANI HEALTH CARE PRODUCTSPLOT NO E 18 1 MIDC JEJURI TALUKA PURANDER DIST PUNE1CompletedJan 2020Nov 2019

How this compares with Pune

38%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRIO HOUSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SPORTS COMPLEX13,700+ in Pune

2 kmTRIO HOUSECompleted 21Lapsed / revoked 14Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 68 registered projects within 2 km.

Builder: TRIO BUILDCON PVT LTD

TRIO BUILDCON PVT LTD has 1 registration on MahaRERA, including TRIO HOUSE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that TRIO HOUSE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if TRIO HOUSE is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRIO HOUSE?

The registered promoter entity is TRIO BUILDCON PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRIO HOUSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRIO HOUSE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRIO HOUSE?

The professionals named in the filing: Architect: Rushikesh Changedia Associates; Engineer: Sheetal S Jagtap; Engineer: NISHANT NIRANJAN MEHTA; Chartered Accountant: PRATIK DOSHI; Chartered Accountant: SACHIN THERADE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRIO HOUSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRIO HOUSE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRIO HOUSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.