Registration lapsed No litigation declared Residential / Group Housing project

Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri

By A A Estates Pvt Ltd

RG-MH-20774 · RERA P51800004643 · Last updated on MahaRERA portal: 10 Jul 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 38 months past the filed date
  • 9 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2023Possession promised38 months past this date
8 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 99%
9Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri is a Residential / Group Housing project by A A Estates Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004643 on 9 Aug 2017. Possession was promised by 28 Aug 2023 and is now 38 months past that date. 9 complaints are on record with the regulator.

At a glance

Project

  • NameTower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri
  • TypeResidential / Group Housing
  • Location
    • Andheri
    • Mumbai Suburban
    • 400098
  • Pincode400098
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004643
  • ReraGenie IDRG-MH-20774

Builder

  • NameA A Estates Pvt Ltd
  • Entity typeCompany
  • Other registrations3 more →
  • No longer live4 lapsed, de-registered or revoked

Key dates

38 months past promisethis monthRegisteredAug 2017PromisedAug 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Aug 2017
  • Promised completion28 Aug 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed143 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RNA ADDRESS TOWER A To E Floors 1 - 13NA140000
RNA ADDRESS TOWER A To E Floors 14 and 15NA20000
RNA ADDRESS TOWER A To E Floors 16 - 18NA30000
RNA ADDRESS TOWER A To E Floors 19 - 22NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 10 Jul 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 99%.

RNA ADDRESS TOWER A To E Floors 1 - 1347%
ActivityProgress
Excavation100%
Basement (if any)99%
Podiums (if any)100%
Plinth99%
Stilt Floor48%
Slabs of Super Structure29%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises11%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks29%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RNA ADDRESS TOWER A To E Floors 14 and 1541%
ActivityProgress
Excavation100%
Basement (if any)99%
Podiums (if any)100%
Plinth99%
Stilt Floor48%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RNA ADDRESS TOWER A To E Floors 16 - 1841%
ActivityProgress
Excavation100%
Basement (if any)99%
Podiums (if any)100%
Plinth99%
Stilt Floor48%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RNA ADDRESS TOWER A To E Floors 19 - 2241%
ActivityProgress
Excavation100%
Basement (if any)99%
Podiums (if any)100%
Plinth99%
Stilt Floor48%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 10 Jul 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Covered parking only RCCYes90%
Stilt and Basement only RCCYes100%

Parking filed447

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots447
Closed/Covered447
BuildingClosed/CoveredTotal
RNA ADDRESS TOWER A To E Floors 1 - 13264264
RNA ADDRESS TOWER A To E Floors 14 and 153636
RNA ADDRESS TOWER A To E Floors 16 - 186363
RNA ADDRESS TOWER A To E Floors 19 - 228484

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,993 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI44987.21
Proposed, not sanctioned15,721 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJeles Education Society Bldg J L Shershekar Marg Bandra East Mumbai 400051

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpace Moulders
EngineerGlobal Engineering Services
PartnerRole in project
A A Estates Pvt Ltd-

Litigation declared30

CaseCourtStatus
289/2015NATIONAL COMMISSIONDisposed off
290/2015NATIONAL COMMISSIONDisposed off
291/2015NATIONAL COMMISSIONDisposed off
292/2015NATIONAL COMMISSIONDisposed off
293/2015NATIONAL COMMISSIONDisposed off
294/2015NATIONAL COMMISSIONDisposed off
295/2015NATIONAL COMMISSIONDisposed off
296/2015NATIONAL COMMISSIONDisposed off
st 217/2016HIGH COURTFor Rejection
286/2017HIGH COURTPre Admission
216/2017HIGH COURTPre Admission
1239/2014HIGH COURTDismissed
232/2015HIGH COURTFOR EXPARTE DECREE HOB
749/2015HIGH COURTFor Hearing
2826/2016HIGH COURTFor Hearing
178/2009HIGH COURTAdmission
179/2009HIGH COURTAdmission
180/2009HIGH COURTAdmission
181/2009HIGH COURTAdmission
341/2016HIGH COURTWithdraw
342/2016HIGH COURTWithdraw
343/2016HIGH COURTWithdraw
344/2016HIGH COURTWithdraw
345/2016HIGH COURTWithdraw
St 33263/2016HIGH COURTPre Admission
286/2016Dindoshi City Civil CourtNM Hearing
2186/2010Dindoshi City Civil CourtNM Hearing
1719/2009Dindoshi City Civil CourtNM Hearing
2707/2009Dindoshi City Civil CourtNM Hearing
1719/2009Dindoshi City Civil CourtChamber Summons Reply

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000000268Ashish VermaA. A. ESTATES PRIVATE LIMITED05/02/2018
CC006000000055294Mohit MelwaniA.A.Estates Private Limited07/07/2018
CC006000000078291RICHA TRIPATHIA. A. ESTATES05/03/2019
CC006000000079039SUDIP MISHRAA. A. ESTATES PVT LTD26/04/2019
CC006000000079044PADMINI MISHRAA. A. ESTATES PVT. LTD.26/04/2019
CC006000000089660PRATEEK TANDONA.A.ESTATE PRIVATE LIMITED08/06/2019
CC006000000100354Keval DoshiA. A.Estates Private Limited03/09/2019
CC006000000210064M P SURYAPRAKASH MUTHUSWAMY PONNUSWAMIA A ESTATE PRIVATE LIMITED19/04/2022
CC006000000251563M/s Borosil LtdA AESTATE PVT LTD07/07/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: Further CC (2).pdf10 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: CC RNA Address.pdf9 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate_Address 1.pdf9 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate_Address 1.pdf9 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate_Address 1.pdf9 Jul 2019
Form 2AFile: Form 2A RNA Address Phase 1.pdf9 Jul 2019
Certificates of CA (Form 5)File: Form 5 RNA Address Phase 1.pdf9 Jul 2019
Proforma of Allotment letterFile: 76 RNA Address PhI 1 23 7 2018 revised final.pdf24 Jul 2018
Copy of the legal title reportFile: Project Address I and II - One Page Title Report.pdf26 Apr 2018
Proforma of Allotment letterFile: RNA- AddressPhI-1-25 4 2018final.pdf26 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for Address I.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate for Address I.pdf31 Jul 2017
Certificates of CA (Form 3)File: Address I Form 3 Part 1.pdf31 Jul 2017
Certificates of CA (Form 3)File: Address I form 3 Part II.pdf31 Jul 2017
OtherFile: Address I Note.pdf31 Jul 2017
Declaration in FORM BFile: Address I Form B.pdf30 Jul 2017
Declaration in FORM BFile: Development Agreement Part 1.pdf30 Jul 2017
Declaration in FORM BFile: Development Agreement Part 2.pdf30 Jul 2017
Proforma of Allotment letterFile: Address I.pdf30 Jul 2017
Copy of the legal title reportFile: Title Report.pdf29 Jul 2017
Details of encumbrancesFile: Address Encumbrances.pdf29 Jul 2017
Building plan approvalFile: IOD Letter.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 1-6_2_2_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 1-6_3_3_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 1-6_4_4_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 1-6_5_5_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 1-6_6_6_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 1-6_Compressed_PAGE1.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 7-12_1_1_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 7-12_2_2_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 7-12_3_3_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 7-12_4_4_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 7-12_5_5_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS - 7-12_6_6_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 23-28_2_2_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 23-28_3_3_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 23-28_4_4_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 23-28_5_5_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 23-28_6_6_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS -29_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 17-22_3_3_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 17-22_4_4_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 17-22_2_2_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 17-22_5_5_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 17-22_6_6_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 23-28_1_1_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 13-16_1_1_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 13-16_2_2_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 13-16_3_3_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 13-16_4_4_Compressed.pdf26 Jul 2017
Building plan approvalFile: SUNDER NAGAR DRAWINGS 17-22_1_1_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 1-6_3_3_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 1-6_2_2_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 1-6_4_4_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 1-6_5_5_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 1-6_6_6_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 1-6_Compressed_PAGE1.pdf26 Jul 2017
Layout approvalFile: IOD Letter.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 13-16_3_3_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 13-16_4_4_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 17-22_1_1_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 17-22_3_3_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 13-16_3_3_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 13-16_1_1_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 13-16_2_2_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 7-12_5_5_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 7-12_6_6_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 7-12_4_4_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 7-12_1_1_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 7-12_2_2_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS - 7-12_3_3_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 23-28_6_6_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS -29_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 17-22_5_5_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 17-22_4_4_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 23-28_5_5_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 23-28_3_3_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 23-28_4_4_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 17-22_6_6_Compressed.pdf26 Jul 2017
Layout approvalFile: SUNDER NAGAR DRAWINGS 23-28_2_2_Compressed.pdf26 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tower A to E on CTS 4853, 4853 9 to 85 and 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri6,700+ in Mumbai Suburban

2 kmTower A to E on CTS 4853Completed 52Lapsed / revoked 45Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 182 registered projects within 2 km.

Builder: A A Estates Pvt Ltd

A A Estates Pvt Ltd has 4 registrations on MahaRERA, including Redevelopment of OB swarganga chsl CTS no 154 pt survey no 383 pt chaitanya ngr santacruz e mum 55 and Redevelopment of bldg 5 and 6 Samrat and Pulkit CHS LTD CTS no 195 pt D N Ngr Mhada layout Andheri W. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri is delayed beyond 28 Aug 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri?

The registered promoter entity is A A Estates Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri?

The professionals named in the filing: Architect: Space Moulders; Engineer: Global Engineering Services. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tower A to E on CTS 4853, 4853 9 to 85 and 88 of village kole kalyan taluka andheri. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tower A to E on CTS 4853, 4853 9 to 85 and 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.