Home / Browse projects / Pune, Maharashtra / TINGRE ELITE PHASE 1
TINGRE ELITE PHASE 1
RG-MH-15201 · RERA P52100023339 · Last updated on MahaRERA portal: 18 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 45 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TINGRE ELITE PHASE 1 is a Residential / Group Housing project by NITIN BABANRAO TINGRE in Pune, Maharashtra, registered with MahaRERA as P52100023339 on 12 Dec 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 45 months from the original filing. 56 of the 56 units on this registration are recorded sold or booked, and 27 of 33 construction stages are filed complete.
At a glance
Project
- NameTINGRE ELITE PHASE 1
- TypeResidential / Group Housing
- Location
- LOHEGAON
- Pune (M Corp.)
- Pune City
- Pune
- 411032
- Pincode411032
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100023339
- ReraGenie IDRG-MH-15201
Builder
- NameNITIN BABANRAO TINGRE
- Entity typeIndividual
- GSTIN27AALPT3601M1ZB
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on12 Dec 2019
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Mar 2023)
- Buildings3 building records
- Documents filed60 files
Current status
Figures as on 18 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 5 | 5 | 10 | 6 | 16 |
| B | NA | 6 | 5 | 20 | 0 | 20 |
| C | NA | 4 | 4 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 80%.
A89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
B89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
C89%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C | NA | Rs 2.81 cr | Rs 2.53 cr |
| B | NA | Rs 2.44 cr | Rs 2.44 cr |
| A | NA | Rs 1.79 cr | Rs 1.79 cr |
| - | NA | Rs 28.31 lakh | Rs 22.64 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SOMNATH KERUR AND ASSOCIATES |
| Engineer | BALAJI GANPATI KADAM KADAM |
| Chartered Accountant | OMKAR U KHUDE & COMPANY Khude |
| Partner | Role in project |
|---|---|
| NITIN BABANRAO TINGRE | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe had completed 95% of Project overall. Structural Development and Construction completed in full. Final finishing and plumbing work is going on We require further time to complete work in full and hand over possession to customer. Some time require for society formation and Conveyance Process
Reason as filed by the promoterWe had completed most of the construction work. Some finishing work is pending. Finishing is delayed due to material shortage ( sand ) . However now it is available. We require some more time for full completion , getting OC and completing Handover process.
Reason as filed by the promoterWe had completed 99% of Our project and also got Part Occupancy Certificate. Minor Finishing work is pending it is mainly due to shortage of material , which is now resolved. We need time to complete it in full and then complete the hand over and conveyance procedures
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Feb 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Dec 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Dec 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: from 1.pdf | 18 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 Jun 2026 |
| Withdrawal Update Form 3File: form 3 ca certificate - Shreeyash Homes (1).pdf | 18 Jun 2026 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf | 17 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE - FORM 1.pdf | 17 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 17 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf | 17 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD UNIT INVENTRY.pdf | 17 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A ENGG CERTIFICATE QUALITY ASSURANCE.pdf | 17 Mar 2025 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION.pdf | 2 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE FORM 1 signed.pdf | 2 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf | 2 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shreeyash Homes - Dec 2023.pdf | 2 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ANNUAL REPORT ON STATEMENT OF ACCOUNT (1).pdf | 2 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE FORM 1.pdf | 27 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf | 27 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A ENGG CERTIFICATE QUALITY ASSURANCE.pdf | 27 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD - UNSOLD INVENTORY.pdf | 27 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate - Shreeyash Homes - Dec 2023.pdf | 27 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 ANNUAL REPORT ON STATEMENT OF ACCOUNT.pdf | 27 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf | 27 Mar 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 1 Apr 2023 |
| CERSAI detailsFile: CERSAI.pdf | 1 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3_compressed.pdf | 1 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19.pdf | 1 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: from 5 19-20.pdf | 1 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf | 1 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf | 1 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf | 27 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf | 27 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineer.pdf | 27 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: sold statement.pdf | 27 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 27 Mar 2023 |
| Copy of the legal title reportFile: LATEST SEARCH REOPRT.pdf | 15 Feb 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf | 10 Feb 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form-2 Engineer Certificate From-Balaji Kadam Dt-17-12-20.pdf | 10 Feb 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Quality Certificate.pdf | 10 Feb 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Shreeyash Homes_compressed.pdf | 10 Feb 2021 |
| Proforma of Allotment letterFile: SAMPLE DRAFT pdf_compressed.pdf | 8 Feb 2021 |
| Layout approvalFile: Layout_compressed.pdf | 9 Dec 2019 |
| Building plan approvalFile: Building A Plan_compressed.pdf | 9 Dec 2019 |
| Building plan approvalFile: Building B Plan_compressed.pdf | 9 Dec 2019 |
| Building plan approvalFile: Building C Plan_compressed.pdf | 9 Dec 2019 |
| Details of encumbrancesFile: Letter Hed Declaration.pdf | 9 Dec 2019 |
| Details of encumbrancesFile: Declaration.pdf | 9 Dec 2019 |
| Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf | 9 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Building A Plan_compressed.pdf | 9 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Building B Plan_compressed.pdf | 9 Dec 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Building C Plan_compressed.pdf | 9 Dec 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 9 Dec 2019 |
| PAN CardFile: PAN Nitin.pdf | 9 Nov 2019 |
| Copy of the legal title reportFile: Title and search Report Nitin Tingre.pdf | 9 Nov 2019 |
| Copy of the legal title reportFile: Title and search Report Babanrao Tingre.pdf | 9 Nov 2019 |
| Declaration in FORM BFile: FormB.pdf | 9 Nov 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 9 Nov 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Lohagaon.pdf | 9 Nov 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf | 9 Nov 2019 |
| Proforma of Allotment letterFile: Agreement Draft- RERA (163-1B) Lohagaon.pdf | 9 Nov 2019 |
| OtherFile: NA order.pdf | 9 Nov 2019 |
| OtherFile: Index 2.pdf | 9 Nov 2019 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BHARGAV VILLA | S NO 49 HISSA NO 5 DHANORI PUNE 411015 | 21 | Completed | Jul 2012 | Late, Dec 2013 |
| SHREE WOODS | S NO 2 NEAR PMC WATERTANK DHANORI PUNE 411015 | 259 | Completed | Jan 2012 | Late, Feb 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 60 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TINGRE ELITE PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near LOHEGAON13,700+ in Pune
Filed coordinates, straight-line distance. 268 registered projects within 2 km.
SHUBH GATEWAY
Shubh Landmarks
Belmont Skydale
Belmont Realty
DS UNIQUE SARVODAYA
DS UNIQUE
Flora Radiance
Flora Builders and Developers
Belmont Crystal
BELMONT REALTY
R K MEADOWS
R K PROMOTERS
Builder: NITIN BABANRAO TINGRE
NITIN BABANRAO TINGRE has 1 registration on MahaRERA, including TINGRE ELITE PHASE 1. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if TINGRE ELITE PHASE 1 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TINGRE ELITE PHASE 1?
The registered promoter entity is NITIN BABANRAO TINGRE, an individual as per the filing. Its GSTIN 27AALPT3601M1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TINGRE ELITE PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TINGRE ELITE PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TINGRE ELITE PHASE 1?
The professionals named in the filing: Architect: SOMNATH KERUR AND ASSOCIATES; Engineer: BALAJI GANPATI KADAM KADAM; Chartered Accountant: OMKAR U KHUDE & COMPANY Khude. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TINGRE ELITE PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback