ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / DS UNIQUE SARVODAYA

Completed No litigation declared Residential / Group Housing project

DS UNIQUE SARVODAYA

By DS UNIQUE

RG-MH-73654 · RERA P52100049916 · Last updated on MahaRERA portal: 23 Jun 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
2 of 11Construction stages donefurthest along: Staircases, 60%
23 of 32Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

DS UNIQUE SARVODAYA is a Residential / Group Housing project by DS UNIQUE in Pune, Maharashtra, registered with MahaRERA as P52100049916 on 6 Mar 2023. The registration is recorded completed; possession was promised by 16 Jun 2025. 9 of the 32 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameDS UNIQUE SARVODAYA
  • TypeResidential / Group Housing
  • Location
    • S.No. 33/1A
    • Plot no. 100
    • Vidyanagar
    • Haveli
    • Pune
    • 411032
  • Pincode411032
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049916
  • ReraGenie IDRG-MH-73654

Builder

  • NameDS UNIQUE
  • Entity typePartnership
  • GSTIN27AATFD4184F1Z3
  • PartnersSANDEEP LAXMAN DEOKAR, SHAILESH LAXMAN DEOKAR, AKSHAY LAXMAN DEOKAR, CHANDRAKANT KASHINATH JANJIRE
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2023PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Mar 2023
  • Promised completion16 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

28%9 of 32 units booked
53.4%Work done, per cost certificate

Figures as on 23 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DS UNIQUE SARVODAYANA7032032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 60%.

DS UNIQUE SARVODAYA: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 23 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered12
Open Space12

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area714 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
Declared on24 Sep 2024
LandownerVillageDistrict
RESHMA RAMESH JADHAV-Pune
ASHOK PARSHURAM BANDE-Pune
SHANTA MARUTI GAIKWAD-Pune
SUVARNA RAMESH JADHAV-Pune
SHRAMNA RAMESH JADHAV-Pune
SUMEDHA RAMESH JADHAV-Pune
SAVITA BHAGWAN KUNJIR-Pune
SNEHAL BHAGWAN KUNJIR-Pune
SHUBHAM BHAGWAN KUNJIR-Pune
SHASHIKALA PRAKASH BABAR-Pune
SHANTABAI BAPUJIRAO BHOSALE-Pune
SACHIN MARUTI JADHAV-Pune
SHAMIL MARUTI JADHAV-Pune
SNEHAL SHANKAR KAMBLE-Pune
JOSTNA KIRAN SHELAR-Pune

Approvals and building plan

Permissible FSI2181.12
Proposed, not sanctioned1,421 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHRANTWADI, PUNE
Estimated costRs 6.21 cr
Cost incurredRs 3.32 cr
Work done53.38%
BuildingWingEstimatedIncurred
DS UNIQUE SARVODAYANARs 6.11 crRs 3.27 cr
-NARs 9.83 lakhRs 4.57 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL MAHAJAN
ArchitectSUNIL DAMODAR MAHAJAN
EngineerMangesh Avinash Gavhankar
EngineerSandip Rangdal
EngineerSANDIP LAXMAN CHOUGULE
Chartered AccountantR M Nesrikar & Co
Chartered AccountantPRAKASH SUBHASH WALGUDE
Chartered AccountantMIS L.F. KARNAWAT & CO
PartnerRole in project
DS UNIQUE-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12601262nilesh daymaDS UNIQUE08/03/2026
CC12601513Shantabhai Bapujirao BhosaleDS UNIQUE19/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jun 2025

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLITION CERTIFIATE pmc.pdf23 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclouser of sold.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sunil Mahajan- Architect certificate.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM III.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahngesh Gavhankar - Form 2.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO 2.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTYIFICATE FORM 1.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTYIFICATE FORM 1.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclouse of Sold book Inventory.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclouse of Sold book Inventory.pdf18 Nov 2024
Layout approvalFile: Plan.pdf14 Aug 2024
Building plan approvalFile: Plan.pdf14 Aug 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf14 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf14 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf14 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf14 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer cert 2 A.pdf14 Aug 2024
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf14 Aug 2024
Layout approvalFile: Plan.pdf22 Jun 2024
Layout approvalFile: Plan.pdf22 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf22 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan.pdf22 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf22 Jun 2024
Declaration about Commencement CertificateFile: Declaration about Commencement.pdf22 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer cert 2 A.pdf22 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer cert 2 A.pdf22 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf22 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3.pdf22 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate from 1.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate form 2.pdf10 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA Certification Form 3 15 mar 24.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf9 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf26 Feb 2024
Building plan approvalFile: REVISE R PLAN.pdf9 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: REVISE R PLAN.pdf9 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: REVISE COMMENCEMENT.pdf9 Feb 2024
Disclosure of sold/ booked inventoryFile: DS UNIQUE Sold Inventory.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf23 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate.pdf23 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A Engineer Certificate.pdf23 Sep 2023
Disclosure of sold/ booked inventoryFile: F NO 202 INDEX II.pdf23 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FORM 3.pdf23 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: CA Certificate FORM 3.pdf23 Sep 2023
Details of encumbrances concerned to FinanceFile: Declaration Regarding Encumbrances to Finance Feb 23.pdf27 Feb 2023
Details of encumbrances concerned to LegalFile: Declaration Regarding Encumbrances to Finance Feb 23.pdf27 Feb 2023
Declaration about Commencement CertificateFile: Format D Declaration about Commencement Feb 23.pdf27 Feb 2023
Declaration in FORM BFile: Form B Affidavit Promoter Feb 23.pdf27 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200261490133_For_Asset_Based_Search_27_02_2023_17_07_15_785.pdf27 Feb 2023
CERSAI detailsFile: nocersai.pdf27 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_compressed.pdf27 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration about Separate Bank account Feb 23.pdf27 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report Model copy of Agreement Feb 23.pdf27 Feb 2023
Layout approvalFile: Compressed_Sanction Plan.pdf13 Feb 2023
Building plan approvalFile: Compressed_Sanction Plan.pdf13 Feb 2023
PAN CardFile: DS UNIQUE PAN.pdf13 Feb 2023
Copy of the legal title reportFile: Compressed Title Report.pdf13 Feb 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf13 Feb 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf13 Feb 2023
Copy of Layout Approval (in case of layout)File: Compressed_Sanction Plan.pdf13 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: Compressed_Sanction Plan.pdf13 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: Compressed_CC.pdf13 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure in other Real Estate.pdf13 Feb 2023
Proforma of Agreement for saleFile: MahaRERA_AnxA_ATS_Model.pdf13 Feb 2023
Proforma of Allotment letterFile: Model Allotment_RERA.pdf13 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf13 Feb 2023
Other - TechnicalFile: Plot 100 Air Force NOC.pdf13 Feb 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
DS VRINDAVANP52100002095DHANORI154Jul 2017CompletedDec 2021Oct 2019
DS VRINDAVAN PHASE IIP52100016171DHANORI, Pune20Apr 2018Certificate SignedDec 2018Late, Feb 2019

How this compares with Pune

28%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DS UNIQUE SARVODAYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vidyanagar13,700+ in Pune

2 kmDS UNIQUE SARVODAYACompleted 13Lapsed / revoked 6Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: DS UNIQUE

DS UNIQUE has 1 registration on MahaRERA, including DS UNIQUE SARVODAYA. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DS UNIQUE SARVODAYA is delayed beyond 16 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DS UNIQUE SARVODAYA?

The registered promoter entity is DS UNIQUE, a partnership as per the filing. Its GSTIN 27AATFD4184F1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DS UNIQUE SARVODAYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DS UNIQUE SARVODAYA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DS UNIQUE SARVODAYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DS UNIQUE SARVODAYA?

The professionals named in the filing: Architect: SUNIL MAHAJAN; Architect: SUNIL DAMODAR MAHAJAN; Engineer: Mangesh Avinash Gavhankar; Engineer: Sandip Rangdal; Engineer: SANDIP LAXMAN CHOUGULE; Chartered Accountant: R M Nesrikar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DS UNIQUE SARVODAYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DS UNIQUE SARVODAYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DS UNIQUE SARVODAYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.