THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY
By MACROTECH DEVELOPERS LIMITED
RG-MH-24675 · RERA P51900008962 · Last updated on MahaRERA portal: 23 Dec 2024
Source: official MahaRERA filing
Red flags
- 9 complaints at MahaRERA
- 1 extension taken
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY is a Residential / Group Housing project by MACROTECH DEVELOPERS LIMITED in ., 400013, registered with MahaRERA as P51900008962 on 19 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2021. 9 complaints are on record with the regulator.
At a glance
Project
- NameTHE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY
- TypeResidential / Group Housing
- Location
- .
- 400013
- Pincode400013
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900008962
- ReraGenie IDRG-MH-24675
Builder
- NameMACROTECH DEVELOPERS LIMITED
- Entity typeCompany
- DirectorsRajendra Lodha, Rajendra Lodha
- Other registrations140 more →
- Completed126 of 141
- No longer live13 lapsed, de-registered or revoked
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Aug 2017
- Promised completion30 Jun 2021
- Revised completionNone
- Buildings2 building records
- Documents filed64 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| R4-World View | NA | 84 | 0 | 0 | 0 | 0 |
| World One - Tier III Above 80th floor | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 23 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.
R4-World View91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
World One - Tier III Above 80th floor36%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 23 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 70% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 70% |
| Open Parking | No | Not applicable |
| Closed Parkings | Yes | 60% |
Parking filed923
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VILAS DESAI & ASSOCIATES |
| Engineer | K C SHAH CONSULTANTS |
| Chartered Accountant | B B JAIN & ASSOCIATES |
| Chartered Accountant | MSKA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MACROTECH DEVELOPERS LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs mentioned in the File attached.
Complaints filed with MahaRERA9
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000055832 | Yogesh Rajaram Gupta | Shreeniwas Cotton Mills Limited (Lodha Developers Pvt. Ltd.) | 16/08/2018 |
| CC006000000057081 | MITA ASHWIN JHAVERI | shreeniwas cotton mills | 30/11/2018 |
| CC006000000194736 | Rajesh Rajnikant Desai | MACROTECH DEVELOPERS LIMITED | 30/10/2020 |
| CC006000000194737 | Samir Rajnikant Desai | MACROTECH DEVELOPERS LIMITED | 31/10/2020 |
| CC006000000194738 | Bankim Rajnikant Desai | MACROTECH DEVELOPERS LIMITED | 31/10/2020 |
| CC006000000195129 | Umendra Chaturvedi | MacrotechDevelopers Limited | 03/12/2020 |
| CC006000000220624 | Rahul Ramesh Jogani | Macrotech Developers Limited (Earlier Known as Shreeniwas Cotton Mills Limited) | 01/04/2022 |
| CC006000000395868 | Smita Ramesh Ranavat | Macrotech Developeres Limited | 20/05/2023 |
| CC006000000397265 | Meghna Bhardwaj | Macrotech Developers Limited | 11/11/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jan 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Oct 2023
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: World Tower-Trinity.pdf | 23 Dec 2024 |
| Other - TechnicalFile: 0370_001.pdf | 23 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY - P51900008962 - March 2 | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY - P51900008962 - Dec23.p | 27 Feb 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 75th floor and OLP Commercial.PDF | 16 Oct 2023 |
| Proforma of Agreement for saleFile: RTMI For Upload.pdf | 30 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1.pdf | 19 Sep 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2.pdf | 19 Sep 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3.pdf | 19 Sep 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4.pdf | 19 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY.pdf | 27 Dec 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 69 THE WORLD TOWERS - WORLD ONE (TIER III) and TRINITY.pdf | 17 Dec 2021 |
| Certificates of CA (Form 3)File: 39 THE WORLD TOWERS - WORLD ONE (TIER III) and TRINITY.pdf | 15 Dec 2021 |
| Form 2AFile: 116 THE WORLD TOWERS - WORLD ONE (TIER III) and TRINITY.pdf | 18 Nov 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 69 THE WORLD TOWERS WORLD ONE (TIER III) TRINITY.pdf | 3 Nov 2021 |
| Certificates of CA (Form 3)File: TWT - WORLD ONE TIER III TRINITY.pdf | 3 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 110_WORLD ONE - TIER III AND TRINITY.pdf | 15 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: P51900008962.pdf | 15 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 108 TWT - WORLD ONE TIER III TRINITY.pdf | 15 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 127 World One Tier III and Trinity.pdf | 27 Oct 2020 |
| Form 2AFile: World One Tier III Trinity.pdf | 31 Aug 2020 |
| Details of encumbrancesFile: The World Tower World One Tier III and Trinity.pdf | 12 Nov 2019 |
| Certificates of CA (Form 5)File: World one Tier III and Trinity.pdf | 30 Sep 2019 |
| Form 2AFile: Codename Trinity.pdf | 12 Jul 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: 2019_05_13 SNML R4 CC till 77th fl C1 st lift till 17th fl.pdf | 15 May 2019 |
| Building plan approvalFile: 2018_12_26_SNML_14th Amended approval letter.pdf | 2 Jan 2019 |
| Building Plan Approval (IOD)File: 2018_12_26_SNML_14th Amended approval letter.pdf | 2 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: 2018_12_27 SNML CC for R4 bldg till 66th floor.pdf | 2 Jan 2019 |
| Details of encumbrancesFile: The World Tower World One Tier III Trinity.pdf | 16 Nov 2018 |
| Certificates of CA (Form 5)File: CODENAME TRINITY.pdf | 1 Oct 2018 |
| Details of encumbrancesFile: World One T3 and Trinity.pdf | 11 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 2018 06 06 SNML -Amended Approval Letter.pdf | 10 Aug 2018 |
| Details of encumbrancesFile: WORLD ONE TIER 3 TRINITY.pdf | 30 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 20180309 SNML - Further CC R1 R2 OLP.pdf | 10 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC TRINITY.pdf | 23 Jan 2018 |
| Proforma of Allotment letterFile: ATS (Trinity) - v2 - 3 November 2017.pdf | 6 Nov 2017 |
| Proforma of Allotment letterFile: ATS (World One) - v2 - 3 November 2017.pdf | 6 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: World One Tier III and Trinity - Form 2.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3 Tier III and Trinity.pdf | 29 Jul 2017 |
| Building plan approvalFile: R4_1.pdf | 28 Jul 2017 |
| Building plan approvalFile: R4_2.pdf | 28 Jul 2017 |
| Building plan approvalFile: R4_3.pdf | 28 Jul 2017 |
| Building plan approvalFile: R4_4.pdf | 28 Jul 2017 |
| Layout approvalFile: Trinity.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title Report_A.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Title Report dated_B.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Supplemental Title Report_C.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Supplemental Title Report_D.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Supplemental Title Report_E.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Supplemental Title Report_F.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Supplemental Title Report_G.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Supplemental Title Report_H.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Supplemental Title Report_I.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: Supplemental Title Report _J.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: World Tower - World One (Tier III) and Trinity.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Trinity.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: R4_1.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: R4_2.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: R4_3.pdf | 28 Jul 2017 |
| Building Plan Approval (IOD)File: R4_4.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: Trinity_Form B.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WT Trinity.pdf | 28 Jul 2017 |
| Proforma of Allotment letterFile: ATS World Towers Amenities Allotment Letter.pdf | 28 Jul 2017 |
| PAN CardFile: SHREENIWAS COTTON MILLS LTD - PAN CARD.pdf | 27 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 140 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
Keep THE WORLD TOWERS - WORLD ONE - TIER III AND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near .
Filed coordinates, straight-line distance. 45 registered projects within 2 km.
Lodha Adrina
LODHA DEVELOPERS LIMITED
7 Mahalaxmi - Tower 3
Runwal Real Estates Private Limited
7 Mahalaxmi - Tower 1
Runwal Real Estates Private Limited
RUNWAL RAAYA - TOWER 2
AETHON DEVELOPERS PRIVATE LIMITED
RUNWAL RAAYA - TOWER 1
AETHON DEVELOPERS PRIVATE LIMITED
PLUS ART
CHINTAMANI CONSTRUCTION COMPANY
Builder: MACROTECH DEVELOPERS LIMITED
Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record.
Frequently asked questions
What are my rights if THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY is delayed beyond 30 Jun 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY?
The registered promoter entity is MACROTECH DEVELOPERS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY?
The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE WORLD TOWERS - WORLD ONE - TIER III AND TRINITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback