Completed No litigation declared Residential / Group Housing project

THE WORLD TOWERS - WORLD ONE - TIER II

By MACROTECH DEVELOPERS LIMITED

RG-MH-24666 · RERA P51900008345 · Last updated on MahaRERA portal: 26 Dec 2024

Source: official MahaRERA filing

Red flags

  • 15 complaints at MahaRERA
  • Completion date moved by 17 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Feb 2020Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Stilt Floor, 0%
15Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

THE WORLD TOWERS - WORLD ONE - TIER II is a Residential / Group Housing project by MACROTECH DEVELOPERS LIMITED in ., 400013, registered with MahaRERA as P51900008345 on 18 Aug 2017. The registration is recorded completed; possession was promised by 25 Feb 2020. The completion date has moved by 17 months from the original filing. 15 complaints are on record with the regulator.

At a glance

Project

  • NameTHE WORLD TOWERS - WORLD ONE - TIER II
  • TypeResidential / Group Housing
  • Location
    • .
    • 400013
  • Pincode400013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900008345
  • ReraGenie IDRG-MH-24666

Builder

  • NameMACROTECH DEVELOPERS LIMITED
  • Entity typeCompany
  • DirectorsRajendra Lodha, Rajendra Lodha
  • Other registrations140 more →
  • Completed126 of 141
  • No longer live13 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredAug 2017First promiseSep 2018Revised toFeb 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion25 Feb 2020
  • Revised completionRevised to 25 Feb 2020 (originally 30 Sep 2018)
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WORLD ONE - TIER II - 44th to 76th floorNA330000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 0%.

WORLD ONE - TIER II - 44th to 76th floor: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 26 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Closed ParkingsYes100%

Parking filed189

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots189
Closed/Covered189

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,875 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI27027.35
Proposed, not sanctioned21,902 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort Mumbai

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
EngineerK C SHAH CONSULTANTS
Chartered AccountantB B JAIN & ASSOCIATES
Chartered AccountantMSKA & ASSOCIATES
PartnerRole in project
MACROTECH DEVELOPERS LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900000644Sep 2018 → Sep 2019

Reason as filed by the promoterDocument uploaded

EXT51900025476Sep 2018 → Feb 2020

Reason as filed by the promoterDue to delay in launch

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC006000000012473Dalip SehgalSreeniwas Cotton Mills Limited19/12/2017
CC006000000055765MANVI COMPUTECH PRIVATE LIMITEDSHREENIWAS COTTON MILLS LIMITED22/08/2018
CC006000000023905ROSMERTA HOLDINGS PVT. LTD.Shreeniwas Cotton Mills Ltd. (Lodha Developer Pvt. Ltd.)26/03/2018
CC006000000056086Ashok Minda, through Mr. Pardeep Mann (SPA Holder)Shreeniwas Cotton Mills Limited04/09/2018
CC006000000056081Samsung Overseas LimitedShreeniwas Cotton Mills Limited04/09/2018
CC006000000056843Chitravati Realty Private LimitedShreeniwas Cotton Mills Limited05/11/2018
CC006000000057072Rajendra Prabhakar Chitale and Shobhana Rajendra ChitaleShreeniwas Cotton Mills Limited (Lodha Developers Private Limited)28/11/2018
CC006000000057078Surekha GardiShreeniwas Cotton Mills Ltd.30/11/2018
CC006000000057693GOBIND ADVANIShreeniwas Cotton Mills Limited17/01/2019
CC006000000057918Nipa Sheth and Utpal ShethShreeniwas Cotton Mills Limited01/02/2019
CC006000000100464KONAL DOSHIShreenivas Cotton Mills Limited09/08/2019
CC006000000192252VINOD KUMAR AGRAWALM/s Shreeniwas Cotton Mills Limited20/05/2020
CC006000000196305Nitin Mansukhlal Shah HUFShreeniwas Cotton Mills Limited15/03/2021
CC006000000196442VINOD KUMAR AGRAWALSHREENIWAS COTTONNILLS LIMITED22/03/2021
CC006000000197951Sanjay ChauhanLodha Developers Limited10/08/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jul 2021

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: OLP Layout.pdf26 Dec 2024
Copy of Layout Approval (in case of layout)File: OLP Layout.pdf26 Dec 2024
Declaration in FORM BFile: DocScanner 26 Dec 2024 15-30(1).pdf26 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Scan.pdf26 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: World Tower II.pdf26 Dec 2024
Certificates of CA (Form 3)File: Form 3 World One.pdf26 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 World One.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: World one Tier II - Sol.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - THE WORLD TOWERS - WORLD ONE - TIER II - P51900008345 - March 24.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - THE WORLD TOWERS - WORLD ONE - TIER II - P51900008345 - Dec23.pdf27 Feb 2024
Proforma of Agreement for saleFile: RTMI For Upload.pdf30 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registartion Certificate-World One.pdf19 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC dated 21012019.pdf30 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC dated 30092019.pdf30 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC dated 25022020.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 84 World One Tier II.pdf27 Oct 2020
Form 2AFile: world one Tier II.pdf31 Aug 2020
Details of encumbrancesFile: The World Tower World one Tier II.pdf11 Nov 2019
Certificates of CA (Form 5)File: World one Tier II.pdf30 Sep 2019
Form 2AFile: World One Tier II.pdf12 Jul 2019
Layout approvalFile: Layout APPR_page-0001.pdf24 Jun 2019
Building plan approvalFile: APPV1.pdf24 Jun 2019
Building plan approvalFile: APPV2.pdf24 Jun 2019
Building plan approvalFile: APPV3.pdf24 Jun 2019
Layout approvalFile: Layout.pdf24 Jun 2019
Building plan approvalFile: a.pdf24 Jun 2019
Building plan approvalFile: b.pdf24 Jun 2019
Building plan approvalFile: c.pdf24 Jun 2019
Building plan approvalFile: d.pdf24 Jun 2019
Building plan approvalFile: e.pdf24 Jun 2019
Building plan approvalFile: f.pdf24 Jun 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf24 Jun 2019
Copy of Layout Approval (in case of layout)File: Layout APPR_page-0001.pdf24 Jun 2019
Building Plan Approval (IOD)File: a.pdf24 Jun 2019
Building Plan Approval (IOD)File: b.pdf24 Jun 2019
Building Plan Approval (IOD)File: c.pdf24 Jun 2019
Building Plan Approval (IOD)File: d.pdf24 Jun 2019
Building Plan Approval (IOD)File: e.pdf24 Jun 2019
Building Plan Approval (IOD)File: f.pdf24 Jun 2019
Building Plan Approval (IOD)File: APPV1.pdf24 Jun 2019
Building Plan Approval (IOD)File: APPV2.pdf24 Jun 2019
Building Plan Approval (IOD)File: APPV3.pdf24 Jun 2019
Building plan approvalFile: layout.pdf25 Feb 2019
Building plan approvalFile: Building Plan.pdf25 Feb 2019
Building plan approvalFile: Building Plan 1.pdf25 Feb 2019
Layout approvalFile: layout.pdf25 Feb 2019
Copy of Layout Approval (in case of layout)File: layout.pdf25 Feb 2019
Building Plan Approval (IOD)File: layout.pdf25 Feb 2019
Building Plan Approval (IOD)File: Building Plan.pdf25 Feb 2019
Building Plan Approval (IOD)File: Building Plan 1.pdf25 Feb 2019
Building plan approvalFile: 2018_12_26_SNML_14th Amended approval letter.pdf2 Jan 2019
Building Plan Approval (IOD)File: 2018_12_26_SNML_14th Amended approval letter.pdf2 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: 2018_12_27 SNML CC for R4 bldg till 66th floor.pdf2 Jan 2019
Details of encumbrancesFile: The World Tower World one Tier II.pdf16 Nov 2018
Certificates of CA (Form 5)File: WORLD TOWERS TIER 2.pdf1 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: 2018 06 06 SNML -Amended Approval Letter.pdf10 Aug 2018
Details of encumbrancesFile: WORLD ONE TIER 2.pdf30 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: 20180309 SNML - Further CC R1 R2 OLP.pdf10 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: CC_WORLD ONE.pdf23 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: World One Tier II - Form 2.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form 3 Tier II.pdf29 Jul 2017
Layout approvalFile: World One.pdf28 Jul 2017
Building plan approvalFile: T2_6.pdf28 Jul 2017
Building plan approvalFile: T2_7.pdf28 Jul 2017
Building plan approvalFile: T1n2_8.pdf28 Jul 2017
Building plan approvalFile: T2_5.pdf28 Jul 2017
Copy of the legal title reportFile: Title Report_A.pdf28 Jul 2017
Copy of the legal title reportFile: Title Report dated_B.pdf28 Jul 2017
Copy of the legal title reportFile: Supplemental Title Report_C.pdf28 Jul 2017
Copy of the legal title reportFile: Supplemental Title Report_D.pdf28 Jul 2017
Copy of the legal title reportFile: Supplemental Title Report_E.pdf28 Jul 2017
Copy of the legal title reportFile: Supplemental Title Report_F.pdf28 Jul 2017
Copy of the legal title reportFile: Supplemental Title Report_G.pdf28 Jul 2017
Copy of the legal title reportFile: Supplemental Title Report_H.pdf28 Jul 2017
Copy of the legal title reportFile: Supplemental Title Report_I.pdf28 Jul 2017
Copy of the legal title reportFile: Supplemental Title Report _J.pdf28 Jul 2017
Details of encumbrancesFile: World Tower - World One (Tier II).pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: World One.pdf28 Jul 2017
Building Plan Approval (IOD)File: T1n2_8.pdf28 Jul 2017
Building Plan Approval (IOD)File: T2_5.pdf28 Jul 2017

Keep THE WORLD TOWERS - WORLD ONE - TIER II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .

2 kmTHE WORLD TOWERS - WORLDCompleted 21Lapsed / revoked 12Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: MACROTECH DEVELOPERS LIMITED

Macrotech Developers Limited has 141 registrations on MahaRERA, including LODHA BELMONDO ASHBRIDGE D, E and LODHA BELMONDO AUGUSTA B. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if THE WORLD TOWERS - WORLD ONE - TIER II is delayed beyond 25 Feb 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE WORLD TOWERS - WORLD ONE - TIER II?

The registered promoter entity is MACROTECH DEVELOPERS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE WORLD TOWERS - WORLD ONE - TIER II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE WORLD TOWERS - WORLD ONE - TIER II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE WORLD TOWERS - WORLD ONE - TIER II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE WORLD TOWERS - WORLD ONE - TIER II?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Engineer: K C SHAH CONSULTANTS; Chartered Accountant: B B JAIN & ASSOCIATES; Chartered Accountant: MSKA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE WORLD TOWERS - WORLD ONE - TIER II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE WORLD TOWERS - WORLD ONE - TIER II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE WORLD TOWERS - WORLD ONE - TIER II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.