Home / Browse projects / Thane, Maharashtra / THE WHITE VILLAS KASARA PHASE 2
THE WHITE VILLAS KASARA PHASE 2
By St. Angelo's VNCT Ventures Pvt. Ltd.
RG-MH-55504 · RERA P51700018983 · Last updated on MahaRERA portal: 4 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 64 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
THE WHITE VILLAS KASARA PHASE 2 is a Others project by St. Angelo's VNCT Ventures Pvt. Ltd. in Thane, Maharashtra, registered with MahaRERA as P51700018983 on 28 Dec 2018. Possession is promised by 30 Apr 2030. The completion date has moved by 64 months from the original filing. 13 of the 23 units on this registration are recorded sold or booked, and 25 of 275 construction stages are filed complete.
At a glance
Project
- NameTHE WHITE VILLAS KASARA PHASE 2
- TypeOthers
- Location
- NEAR WASHALA PHATA
- ADJ TO NHAI OFFICE
- NH3 MUMBAI NASHIK HIGHWAY
- 421602
- THANE
- Kasara Kh.
- Shahapur
- 421602
- Pincode421602
- RERA no.P51700018983
- ReraGenie IDRG-MH-55504
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Dec 2018
- Promised completion30 Apr 2030
- Revised completionRevised to 30 Apr 2030 (originally 17 Dec 2024)
- Buildings25 building records
- Documents filed79 files
Current status
Figures as on 4 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LOTUS 1 | NA | 2 | 2 | 1 | 0 | 1 |
| LOTUS 2 | NA | 2 | 2 | 1 | 0 | 1 |
| MAGNOLIA 1 | NA | 2 | 2 | 1 | 0 | 1 |
| MAGNOLIA 2 | NA | 2 | 2 | 1 | 0 | 1 |
| FRANGIPANI 1 | NA | 2 | 2 | 1 | 0 | 1 |
| FRANGIPANI 2 | NA | 2 | 2 | 1 | 0 | 1 |
| CARNATION 1 | NA | 2 | 2 | 1 | 0 | 1 |
| CARNATION 2 | NA | 2 | 2 | 1 | 0 | 1 |
| PENTAS 1 | NA | 2 | 2 | 1 | 0 | 1 |
| PENTAS 2 | NA | 2 | 2 | 1 | 0 | 1 |
| FUCHCIA 1 | NA | 2 | 2 | 1 | 0 | 1 |
| FUCHCIA 2 | NA | 2 | 2 | 1 | 0 | 1 |
| DAHLIA 1 | NA | 2 | 2 | 1 | 0 | 1 |
| DAHLIA 2 | NA | 2 | 2 | 0 | 0 | 0 |
| DAHLIA 3 | NA | 2 | 2 | 0 | 0 | 0 |
| LILY 1 | NA | 2 | 2 | 1 | 0 | 1 |
| LILY 2 | NA | 2 | 2 | 1 | 0 | 1 |
| LILY 3 | NA | 2 | 2 | 1 | 0 | 1 |
| LILY 4 | NA | 2 | 2 | 1 | 0 | 1 |
| LILY 5 | NA | 2 | 2 | 1 | 0 | 1 |
| LILY 6 | NA | 2 | 2 | 1 | 0 | 1 |
| LILAC 1 | NA | 2 | 2 | 1 | 0 | 1 |
| LILAC 2 | NA | 2 | 2 | 1 | 0 | 1 |
| ROSE 1 | NA | 2 | 2 | 1 | 0 | 1 |
| ROSE 2 | NA | 2 | 2 | 1 | 0 | 1 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 4 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 25 buildings; the table lists the first 20.
25 of 275 construction stages are filed complete across 25 buildings. The stage furthest along is Excavation, at 80%.
LOTUS 160%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LOTUS 260%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MAGNOLIA 160%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MAGNOLIA 260%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
FRANGIPANI 160%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
FRANGIPANI 260%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CARNATION 160%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CARNATION 260%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PENTAS 160%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PENTAS 260%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
FUCHCIA 160%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
FUCHCIA 260%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DAHLIA 160%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DAHLIA 260%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DAHLIA 360%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LILY 160%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LILY 260%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LILY 360%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LILY 460%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
LILY 560%
| Activity | Progress |
|---|---|
| Excavation | 80% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| LOTUS 1 | 1 | 1 |
| LOTUS 2 | 1 | 1 |
| MAGNOLIA 1 | 1 | 1 |
| MAGNOLIA 2 | 1 | 1 |
| FRANGIPANI 1 | 1 | 1 |
| FRANGIPANI 2 | 1 | 1 |
| CARNATION 1 | 1 | 1 |
| CARNATION 2 | 1 | 1 |
| PENTAS 1 | 1 | 1 |
| PENTAS 2 | 1 | 1 |
| FUCHCIA 1 | 1 | 1 |
| FUCHCIA 2 | 1 | 1 |
| DAHLIA 1 | 1 | 1 |
| DAHLIA 2 | 1 | 1 |
| DAHLIA 3 | 1 | 1 |
| LILY 1 | 1 | 1 |
| LILY 2 | 1 | 1 |
| LILY 3 | 1 | 1 |
| LILY 4 | 1 | 1 |
| LILY 5 | 1 | 1 |
| LILY 6 | 1 | 1 |
| LILAC 1 | 1 | 1 |
| LILAC 2 | 1 | 1 |
| ROSE 1 | 1 | 1 |
| ROSE 2 | 1 | 1 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| WEALTH ZONE REALTORS LLP | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 7.20 cr | Rs 6.87 cr |
| LOTUS 1 | NA | Rs 2.15 cr | Rs 1.51 cr |
| LOTUS 2 | NA | Rs 2.15 cr | Rs 1.51 cr |
| MAGNOLIA 1 | NA | Rs 2.15 cr | Rs 1.51 cr |
| MAGNOLIA 2 | NA | Rs 2.15 cr | Rs 1.51 cr |
| FRANGIPANI 1 | NA | Rs 2.15 cr | Rs 1.51 cr |
| FRANGIPANI 2 | NA | Rs 2.15 cr | Rs 1.51 cr |
| CARNATION 1 | NA | Rs 2.15 cr | Rs 1.51 cr |
| CARNATION 2 | NA | Rs 2.15 cr | Rs 1.51 cr |
| PENTAS 1 | NA | Rs 2.15 cr | Rs 1.51 cr |
| PENTAS 2 | NA | Rs 2.15 cr | Rs 1.51 cr |
| FUCHCIA 1 | NA | Rs 2.15 cr | Rs 1.51 cr |
Certifying professionals and partners11
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | IDEA MATRIX |
| Architect | TANGENT ARCHITECT |
| Engineer | BSQUARECONSTRUCTION |
| Engineer | TANGENT ARCHITECTS |
| Engineer | TANGENTARCHITECT |
| Engineer | B SQUARE CONSTRUCTION |
| Chartered Accountant | PARAG SHAH |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | NEHALI DHAVAL DOSHI |
| Chartered Accountant | NEHALI DHAVALDOSHI |
| Chartered Accountant | Puneet Singhvi & Associates |
| Partner | Role in project |
|---|---|
| St. Angelo's VNCT Ventures Pvt. Ltd. | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIssues related to contractor management have also played a critical role in the delays. Problems include miscommunication among subcontractors, inadequate project oversight, and a lack of adherence to schedules. We recognize that these management challenges have resulted in inefficiencies and setbacks in the project timeline.. There have been significant challenges in securing a consistent labor force, which have adversely impacted the project's timeline Thereafter, the Covid 19 pandemic added to the circumstances and worsened the project furthermore. It was practically difficult to carry out
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Dec 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Dec 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Dec 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2030
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Form 5 Phase 2 (CA certificate).pdf | 4 Sep 2026 |
| Form 2A (FY 2025-2026)File: form 2A (engineer certificate) Kasara phase 2.pdf | 19 Aug 2026 |
| Withdrawal Update Form 1File: form 1 (architect certificate) Pahse 2 15-07-2026.PDF | 20 Jul 2026 |
| Withdrawal Update Form 2File: form 2 (engineer certificate) Phase 2 - 15072026.PDF | 20 Jul 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: form 1 (architect certificate) Pahse 2 08-04-2026.PDF | 27 May 2026 |
| Withdrawal Update Form 2File: Form 2 Kasara Phase 2.PDF | 27 May 2026 |
| Withdrawal Update Form 3File: Signed CA Certificate - Kasara 2 m26 (1).pdf | 27 May 2026 |
| Withdrawal Update Form 1File: FORM 1.PDF | 11 Feb 2026 |
| Withdrawal Update Form 2File: form2.PDF | 11 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3.pdf | 11 Feb 2026 |
| Withdrawal Update Form 1File: form1.PDF | 22 Jan 2026 |
| Withdrawal Update Form 2File: form2.PDF | 22 Jan 2026 |
| Withdrawal Update Form 3File: Signed CA Certificate - Kasara 2 sept25 (1).pdf | 22 Jan 2026 |
| Withdrawal Update Form 1File: form 1.PDF | 28 Nov 2025 |
| Withdrawal Update Form 2File: form 2.PDF | 28 Nov 2025 |
| Withdrawal Update Form 3File: Signed CA Certificate - Kasara 2 june25.pdf | 28 Nov 2025 |
| Form 2A (FY 2024-2025)File: form 2A (engineer certificate) Kasara phase 2 Scan copy FY 2024-25.PDF | 16 Sep 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Kasara Phase 2 Q4.PDF | 7 Jun 2025 |
| Certificates of CA (Form 3)File: Form 3 Kasara Phase 2 Jan 25-Mar 25.PDF | 7 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Kasara Phase 2 Q4.PDF | 7 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Phase 2 (CA certificate) FY 19-20.pdf | 7 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory revised kasara Phase 2 (1).pdf | 7 Jun 2025 |
| Declaration in FORM BFile: latest Form b.PDF | 28 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 (CA certificate) Fy 21-22 (1).pdf | 28 Apr 2025 |
| CERSAI detailsFile: CERSAI DECLARATION.PDF | 29 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Fy 21-22.PDF | 29 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.PDF | 29 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 dec 24.pdf | 27 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dec 24 .pdf | 27 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosour dec 24.pdf | 27 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 dec 24.PDF | 4 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 oct to dec 24.PDF | 12 Feb 2025 |
| Certificates of CA (Form 3)File: form 3 dec 24.pdf | 4 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 (CA certificate) new FY 23-24 pdf (1) (1).pdf | 4 Feb 2025 |
| Certificates of CA (Form 3)File: Signed CA Certificate - Kasara 2 dec24 (1).pdf | 27 Jan 2025 |
| Certificates of CA (Form 3)File: FORM 3.PDF | 27 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.PDF | 26 Dec 2023 |
| Certificates of CA (Form 3)File: Form 03 09 22.PDF | 26 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3.PDF | 26 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.PDF | 26 Dec 2023 |
| Certificates of CA (Form 3)File: Signed CA Certificate - Kasara 2 Sept'22.pdf | 1 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar certificate phase 2.pdf | 5 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER FORM 2A PHASE 2.pdf | 22 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (2).pdf | 12 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Jan 2022 |
| Certificates of CA (Form 3)File: FORM 3.PDF | 12 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Kasara Phase 2_compressed.pdf | 25 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Kasara Pahse 2_compressed.pdf | 25 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: certificate1_compressed.pdf | 12 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21 Kasara phase 2.pdf | 12 Oct 2021 |
| Certificates of CA (Form 3)File: Signed CA Certificate WHITE VILLA KASARA Phase 2.pdf | 4 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: KASARA 1 19 July.pdf | 23 Jul 2021 |
| Certificates of CA (Form 3)File: signed CA Certificate KASARA - Phase II - jun'21.pdf | 23 Jul 2021 |
| Declaration about Commencement CertificateFile: Decla Letter_Promotor_Land Bearing S No 2B.PDF | 12 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A certified 20-21.pdf | 10 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WHITE VILLAS KASAR PHASE 2 ARCH.pdf | 3 May 2021 |
| Certificates of CA (Form 3)File: THE WHITE VILLAS KASARA PHASE II.pdf | 22 Apr 2021 |
| Certificates of CA (Form 3)File: signed CA Certificate KASARA - Phase II - DEC'20.pdf | 9 Mar 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A Kasara 2.pdf | 3 Mar 2021 |
| Certificates of CA (Form 3)File: SIGNED KASARA 2.pdf | 6 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: THE WHITE VILLAS KASARA PHASE 2.pdf | 15 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PHASE 2.pdf | 2 Sep 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 PHASE 2.pdf | 4 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WHITE VILLAS KASARA PHASE 2.pdf | 2 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: The white villas kasra phase 2.PDF | 4 Jul 2019 |
| Building plan approvalFile: TP IOD.pdf | 15 Dec 2018 |
| Layout approvalFile: NEW LAYOUT PLAN 18.pdf | 15 Dec 2018 |
| Copy of the legal title reportFile: Title certificate final(colour copy).pdf | 15 Dec 2018 |
| Details of encumbrancesFile: no encumberances certificate.pdf | 15 Dec 2018 |
| Copy of Layout Approval (in case of layout)File: NEW LAYOUT PLAN 18.pdf | 15 Dec 2018 |
| Building Plan Approval (IOD)File: TP IOD.pdf | 15 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order Kasara final.pdf | 15 Dec 2018 |
| Declaration in FORM BFile: Form B.pdf | 15 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH COMP.pdf | 15 Dec 2018 |
| Certificates of CA (Form 3)File: C A.PDF | 15 Dec 2018 |
| Proforma of Allotment letterFile: AA 01.pdf | 15 Dec 2018 |
| Proforma of Allotment letterFile: AA 02.pdf | 15 Dec 2018 |
| Proforma of Allotment letterFile: AA 03.pdf | 15 Dec 2018 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| THE WHITE VILLAS KASARA | NEAR WASHALA PHATA ADJ TO NHAI OFFICE NH3 MUMBAI NASHIK HIGHWAY | 20 | Completed | Dec 2020 | Dec 2020 |
| THE WHITE VILLAS | THE WHITE VILLAS VILLAGE KALAM NEAR ATGAON STATION TALUKA SHAHAPUR BEHIND MIDWAY PARK RESORT KALAMGAON MAHARASHTRA 420601. | 43 | Completed | Dec 2020 | Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep THE WHITE VILLAS KASARA PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near THANE7,600+ in Thane
ELEGANT CITY BLISS
NEELE BUILDCON LLP
RELAX COUNTY - B - PHASE 2
RAJENDRA YASHWANT PATIL
THE WHITE VILLAS KASARA
St. Angelo's VNCT Ventures Pvt. Ltd.
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
Plot No -1A,Sector -19, Vashi Truck Terminal
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
See every Thane project, with the district possession charts
Builder: St. Angelo's VNCT Ventures Pvt. Ltd.
St. Angelo's VNCT Ventures Pvt. Ltd. has 3 registrations on MahaRERA, including THE WHITE VILLAS and THE WHITE VILLAS KASARA. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if THE WHITE VILLAS KASARA PHASE 2 is delayed beyond 30 Apr 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of THE WHITE VILLAS KASARA PHASE 2?
The registered promoter entity is St. Angelo's VNCT Ventures Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in THE WHITE VILLAS KASARA PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for THE WHITE VILLAS KASARA PHASE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at THE WHITE VILLAS KASARA PHASE 2?
The professionals named in the filing: Architect: IDEA MATRIX; Architect: TANGENT ARCHITECT; Engineer: BSQUARECONSTRUCTION; Engineer: TANGENT ARCHITECTS; Engineer: TANGENTARCHITECT; Engineer: B SQUARE CONSTRUCTION. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE WHITE VILLAS KASARA PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback