Home / Browse projects / Thane, Maharashtra / ELEGANT CITY BLISS

Registered No litigation declared Others project

ELEGANT CITY BLISS

By NEELE BUILDCON LLP

RG-MH-28933 · RERA P51700027320 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 36 months from the original
12 of 55Construction stages doneacross 5 buildings; furthest along: Stilt Floor, 90%
318 of 376Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

ELEGANT CITY BLISS is a Others project by NEELE BUILDCON LLP in Thane, Maharashtra, registered with MahaRERA as P51700027320 on 1 Dec 2020. Possession is promised by 30 Jun 2028. The completion date has moved by 36 months from the original filing. 58 of the 376 units on this registration are recorded sold or booked, and 12 of 55 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameELEGANT CITY BLISS
  • TypeOthers
  • Location
    • NH-3
    • MUMBAI NASHIK HIGHWAY
    • Shahapur
    • Shirol
    • Thane
    • 421602
  • Pincode421602
  • RERA no.P51700027320
  • ReraGenie IDRG-MH-28933

Builder

  • NameNEELE BUILDCON LLP
  • Entity typePartnership
  • PartnersMUJIBURRAHMAN ABRAR AHMAD MALIK, AEJAZ AHMED MOHAMMED SHAMIM MALIK, FUZALA AEJAZ AHMED MALIK

Key dates

this monthRegisteredDec 2020First promiseJun 2025Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Dec 2020
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Jun 2025)
  • Buildings5 building records
  • Documents filed102 files

Current status

15%58 of 376 units booked
23.8%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLISS-1NA8759968
BLISS-2NA8759968
BLISS-3NA8780080
BLISS-4NA8780080
BLISS-5NA8780080

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Stilt Floor, at 90%.

BLISS-143%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure38%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLISS-20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLISS-327%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLISS-427%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BLISS-527%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Open Space29
BuildingOpen SpaceTotal
BLISS-166
BLISS-266
BLISS-366
BLISS-466
BLISS-555

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,139 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025

Approvals and building plan

Sanctioning authorityThane Muncipal Corporation
Permissible FSI14131.21
Proposed, not sanctioned14,131 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHANE WEST 400602
Estimated costRs 28.68 cr
Cost incurredRs 6.84 cr
Work done23.84%
BuildingWingEstimatedIncurred
BLISS-1NARs 5.92 crRs 3.78 cr
BLISS-2NARs 5.92 cr-
BLISS-3NARs 5.32 crRs 72.91 lakh
BLISS-4NARs 5.32 crRs 72.91 lakh
BLISS-5NARs 5.32 crRs 72.91 lakh
-NARs 87.61 lakhRs 87.26 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHVISION ARCHITECTS & INT.DESIGNERS
ArchitectP D Architect
EngineerSSCONS
EngineerSajid Ansari
Chartered AccountantSHASHANK R JAIN AND ASSOCIATES
Chartered AccountantS B JAIN AND ASSOCIATES
PartnerRole in project
NEELE BUILDCON LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019308Jun 2025 → Jun 2026

Reason as filed by the promoterWe are making the application to Extend the completion date of our above project to 30/06/2026 as there is financial Crunch also. Request you to Extend the date as early as possible and We are applying for Extension for the First time and hence 51% consent is not required.

EA30072502255Jun 2025 → Jun 2028

Reason as filed by the promoter. As evident from the Architect’s Certificate dated 30/06/2025 submitted above, the construction work of the project is in Swing for Bliss-1 Building only and other buildings i.e Bliss-3/4/5 are on Plinth stage only and Bliss-2 excavation is also not started .Hence we are applying for Extension well in Advance. Further, the market was slow down post Corona and more specially in our Area as it falls in Remote location so there were No aggressive sale and hence our financial Planning also Stuck .Now we are in Process of Project Funding from Financial Institution and once the same is done our Con

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000196698Amit Ulhas KambleNeele Buildcon LLP16/04/2021
CC006000000198939VIRGINIA PEREIRANEELE BUILDCON LLP06/11/2021
CC006000000480052MILLIE RAMRAJU PATNALANEELE BUILDCON LLP12/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Neele 30062026_signed.pdf24 Jul 2026
Withdrawal Update Form 2File: Form 2 Neele 30062026 signed.pdf24 Jul 2026
Withdrawal Update Form 3File: Form 3 Neele 30062026 signed_compressed.pdf24 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A of Neele 25-26.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1 Neele 31032026_Uploaded.pdf20 Apr 2026
Withdrawal Update Form 2File: Neele Buildcon Rera Form 2_Uploaded.pdf20 Apr 2026
Withdrawal Update Form 3File: Neele Buildcon Rera Form 3_31032026_Uploaded.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 of Neele 31122025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 of Neele 31122025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 of Neele 31122025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 Neele Buildcon 30092025.pdf10 Nov 2025
Withdrawal Update Form 2File: Form 2 Neele Buildcon 30092025.pdf10 Nov 2025
Withdrawal Update Form 3File: Form 3 Neele Buildcon 30092025.pdf10 Nov 2025
Form 5 (FY 2024-2025)File: Neele Form 5 Signed Copy.pdf30 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A 31st March 2024.pdf30 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A 31st March 2025.pdf30 Jul 2025
Form 5 (FY 2021-2022)File: System Generated 21-22 Form 5 (1).pdf28 Jul 2025
Form 5 (FY 2022-2023)File: System Generated 22-23 Form 5 (1).pdf28 Jul 2025
Form 5 (FY 2023-2024)File: System Generated 23-24 Form 5 (1).pdf28 Jul 2025
Form 1File: FORM-1 Buildcon 30062025.pdf19 Jul 2025
Form 2File: FORM-2 30062025 Engineer.pdf19 Jul 2025
Form 3File: Form3 Neele 30062025_compressed.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold and Unsold Inventory 30062025.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 - neele - 31122024_compressed.pdf16 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 - neele - 31032025_compressed.pdf16 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032024 Final.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062024 Final.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30092024 Final.pdf12 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -31032024.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30062024.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30092024.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31122024.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31032025.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_31-03-2024.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_30-06-2024.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_30-09-2024.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_31-12-2024.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_31-03-2025.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Neele Builcom 31032023_compressed.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Neele Builcom 30062023_compressed.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Neele Builcom 30092023Compressed.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Neele Builcom 31122023 Compressed.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neele Buildcon LLP 31_12_2023.pdf13 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - FY -2020-21.pdf13 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A -FY 2021-22.pdf13 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - FY 2022-23.pdf13 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_2023-09-30.pdf7 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_2023-12-31 (1).pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Meele Buildcon LLP 30_06_2023_compressed.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neele Buildcon LLP 30_09_2023_compressed.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neele Buildcon LLP 31_12_2023.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neele Buildcon LLP 31_03_2023_compressed.pdf7 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neele Builcom 31032023.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neele Buildcom 30062023.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neele Buildcom 30092023.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_2023-03-31 (1).pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_2023-06-30.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Neele_31122022.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Neele_31122022_Uploaded.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Neele_31122022_Uploaded.pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Neele_30062022_compressed.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Neele_30092022_compressed.pdf10 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Neele_30092022.pdf3 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Neele_30092022-compressed.pdf3 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Neele_30062022.pdf2 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Neele_30062022_Compressed.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1_Buildcon_30-09-2021.pdf3 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Compressed.pdf3 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Compressed.pdf3 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_Buildcon_30-09-2021_Compressed.pdf3 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Compressed.pdf3 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Compressed.pdf3 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Neele_30092021_Compressed.pdf3 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Neele_31122021_Compressed.pdf3 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Neele_31032022_Compressed.pdf3 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5.pdf31 Dec 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE Rera upload draft.pdf26 Oct 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER New Rera Coustmors.pdf26 Oct 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE Rera upload draft.pdf26 Oct 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER New Rera Coustmors.pdf26 Oct 2021

How this compares with Thane

15%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ELEGANT CITY BLISS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shahapur7,600+ in Thane

Builder: NEELE BUILDCON LLP

NEELE BUILDCON LLP has 1 registration on MahaRERA, including ELEGANT CITY BLISS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ELEGANT CITY BLISS is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ELEGANT CITY BLISS?

The registered promoter entity is NEELE BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ELEGANT CITY BLISS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ELEGANT CITY BLISS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ELEGANT CITY BLISS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ELEGANT CITY BLISS?

The professionals named in the filing: Architect: ARCHVISION ARCHITECTS & INT.DESIGNERS; Architect: P D Architect; Engineer: SSCONS; Engineer: Sajid Ansari; Chartered Accountant: SHASHANK R JAIN AND ASSOCIATES; Chartered Accountant: S B JAIN AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ELEGANT CITY BLISS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ELEGANT CITY BLISS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ELEGANT CITY BLISS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.