Home / Browse projects / Pune, Maharashtra / THE MPIRE BUILDING - F

Registered No litigation declared Residential / Group Housing project

THE MPIRE BUILDING - F

By AGN VENTURE

RG-MH-05616 · RERA P52100077527 · Last updated on MahaRERA portal: 25 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Staircases, 90%
114 of 119Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

THE MPIRE BUILDING - F is a Residential / Group Housing project by AGN VENTURE in Pune, Maharashtra, registered with MahaRERA as P52100077527 on 20 Aug 2024. Possession is promised by 31 Dec 2027. 5 of the 119 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameTHE MPIRE BUILDING - F
  • TypeResidential / Group Housing
  • Location
    • FURSUNGI LAST BUS STOP
    • FURSUNGI
    • Haveli
    • Pune
    • 412308
  • Pincode412308
  • RERA no.P52100077527
  • ReraGenie IDRG-MH-05616

Builder

  • NameAGN VENTURE
  • Entity typePartnership
  • PartnersDINESH GOVIND PATEL, ASHOK GOVIND PATEL, MANOJ KHIMJI PATEL
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Aug 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Current status

4%5 of 119 units booked
67.8%Work done, per cost certificate

Figures as on 25 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE MPIRE BUILDING - FNA11111190119

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

THE MPIRE BUILDING - F: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes60%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes40%
Street LightingYes40%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes60%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes50%

Parking filed350

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots350
Closed/Covered350

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,298 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Feb 2026
LandownerVillageDistrict
DYANOBA BHIMAJI PAWARFursungiPune
UTTAM SHIVRAM PAWARFursungiPune
VILAS SHIVRAM PAWARFursungiPune
DILIP SHIVRAM PAWARFursungiPune
DATTATRAY HIRAMAN PAWARFursungiPune
VASANT DYANOBA PAWARFursungiPune
VIJAY DYANOBA PAWARFursungiPune
RAJENDRA DYANOBA PAWARFursungiPune

Approvals and building plan

Sanctioning authorityFursungi-uruli Devachi Municipal Council
Permissible FSI12409.77
Proposed, not sanctioned7,548 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHADAPSAR PUNE, ARYAN CENTRE, OPP VAIBHAV THEATRE, PUNE SOLAPUR ROAD, HADAPSAR, PUNE 411028
Estimated costRs 24.00 cr
Cost incurredRs 16.26 cr
Work done67.76%
BuildingWingEstimatedIncurred
THE MPIRE BUILDING - FNARs 18.50 crRs 13.48 cr
-NARs 5.50 crRs 2.78 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRao Architects
EngineerAGRE INDIA ENGINEERING CONSULTANCY
Chartered AccountantHeena Bhavanji Momaya
PartnerRole in project
AGN VENTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1.pdf25 Dec 2025
Withdrawal Update Form 1File: FORM-1.pdf25 Dec 2025
Withdrawal Update Form 2File: FORM-2.pdf25 Dec 2025
Withdrawal Update Form 2File: FORM-2.pdf25 Dec 2025
Withdrawal Update Form 3File: FORM-3 F.pdf25 Dec 2025
Withdrawal Update Form 3File: FORM-3 F.pdf25 Dec 2025
Form 1File: FORM-1 BIG F .pdf24 Dec 2025
Form 2File: FORM-2.pdf24 Dec 2025
Form 3File: FORM-3.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: FORM-3.pdf24 Dec 2025
Withdrawal Update Form 1File: ARCHITECH CERTIFICATE FOR F BLDG.pdf24 Dec 2025
Withdrawal Update Form 1File: FORM-1.pdf24 Dec 2025
Withdrawal Update Form 1File: FORM-1.pdf24 Dec 2025
Withdrawal Update Form 1File: FORM-1.pdf24 Dec 2025
Withdrawal Update Form 1File: FORM-1.pdf24 Dec 2025
Withdrawal Update Form 2File: ENGINEER's CERTIFICATE OF F BLDG.pdf24 Dec 2025
Withdrawal Update Form 2File: FORM-2.pdf24 Dec 2025
Withdrawal Update Form 2File: FORM-2.pdf24 Dec 2025
Withdrawal Update Form 2File: FORM-2.pdf24 Dec 2025
Withdrawal Update Form 2File: FORM-2.pdf24 Dec 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE SINHAGAD F WING.pdf24 Dec 2025
Withdrawal Update Form 3File: FORM 3 (6).pdf24 Dec 2025
Withdrawal Update Form 3File: FORM 3 (6).pdf24 Dec 2025
Withdrawal Update Form 3File: FORM 3 (6).pdf24 Dec 2025
Withdrawal Update Form 3File: FORM-3 F.pdf24 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ceritificate.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F-sinhagad Form-3 NEW.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F Bldg Engg Certificate_29 th April.pdf5 May 2025
Building plan approvalFile: List of Directors.pdf3 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: List of Directors.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE FOR F BLDG.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE OF F BLD.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER's CERTIFICATE OF F BLDG.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf24 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F Building Engg Certificate.pdf24 Dec 2024
Other - LegalFile: 7 12 new .pdf3 Aug 2024
Other - LegalFile: Declaration on Hissa no 5 2 .pdf2 Aug 2024
Other - LegalFile: AGN CONSTRUCTION Eagle.pdf23 Jul 2024
Other - LegalFile: AGN CONSTRUCTION BPPP.pdf23 Jul 2024
Other - LegalFile: Area Declaration 3298.pdf23 Jul 2024
Other - LegalFile: AGN CONSTRUCTION .pdf22 Jul 2024
Other - LegalFile: Development Agreement .pdf22 Jul 2024
Other - LegalFile: Development Agreement .pdf22 Jul 2024
Other - LegalFile: Development Agreement .pdf22 Jul 2024
Other - LegalFile: 201 pg 1 To 21.pdf22 Jul 2024
Other - LegalFile: 2 201 pg 22 to 42.pdf22 Jul 2024
Other - LegalFile: 3 201 pg no 43 to 63.pdf22 Jul 2024
Other - LegalFile: 4 201 pg 64 to 85.pdf22 Jul 2024
Other - LegalFile: Declaration about Area 5-2.pdf3 Jul 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf2 Jul 2024
Proforma of Agreement for saleFile: BUILDING F - SINHAGAD DRAFT AGREEMENT FOR SALE.pdf2 Jul 2024
Copy of the legal title reportFile: 1 Copy of the legal title report (1) (1).pdf10 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE SINHAGAD F WING.pdf10 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf10 Jun 2024
Other - LegalFile: AGN Ventures Corection deed Dt 1842017.pdf10 Jun 2024
Other - FinanceFile: 1 Declaration For Landowner Area Distribution.pdf10 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION FOR SEPARATE BANK ACCOUNT.pdf4 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SELF BANK DECLARATION.pdf4 Jun 2024
Other - TechnicalFile: PLAN NO 1 Highlight Project and Area 3298sqm.pdf24 May 2024
Other - LegalFile: POA Dnyanoba Bhimji Pawar and other six and AGN Ventures.pdf30 Apr 2024
Other - TechnicalFile: Declaration for Project Plot Area 3298 sqm.pdf30 Apr 2024
Details of encumbrances concerned to FinanceFile: DECLARATION OF NO FINANCIAL ENCUMBRANCES.pdf29 Apr 2024
Details of encumbrances concerned to FinanceFile: Declaration of No Legal Encumbrances.pdf29 Apr 2024
Details of encumbrances concerned to LegalFile: DECLARATION OF NO FINANCIAL ENCUMBRANCES.pdf29 Apr 2024
Details of encumbrances concerned to LegalFile: Declaration of No Legal Encumbrances.pdf29 Apr 2024
CERSAI detailsFile: DECLARATION FOR NO CERSAI REPORT.pdf29 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report.pdf29 Apr 2024
Deviation Report with respect to Allotment letterFile: DECLARATION FOR REPORT ON DEVIATION IN RESPECT OF MODEL COPY OF ALLOTMENT LETTER.pdf29 Apr 2024
Other - LegalFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf29 Apr 2024
Other - LegalFile: Partnership Deed AGN Venture.pdf29 Apr 2024
Other - TechnicalFile: ANNEXURE A.pdf29 Apr 2024
Declaration in FORM BFile: Form B - Landowners.pdf15 Apr 2024
Declaration in FORM BFile: Form B - Promotor.pdf15 Apr 2024
Building plan approvalFile: PLAN NO - 24 (1)_6_11zon.pdf12 Apr 2024
Building plan approvalFile: PLAN NO - 24 (1)_6_11zon.pdf12 Apr 2024
Building plan approvalFile: PLAN NO - 25 (1)_7_11zon.pdf12 Apr 2024
Building plan approvalFile: PLAN NO - 26 (1)_8_11zon.pdf12 Apr 2024
Building plan approvalFile: PLAN NO - 27 (1)_9_11zon.pdf12 Apr 2024
Building plan approvalFile: PLAN NO - 28 (1)_10_11zon.pdf12 Apr 2024
Layout approvalFile: PLAN NO - 2 (1)_1_11zon.pdf12 Apr 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
THE MPIRE PHASE III BUILDING D - RAJGADFURSUNGI PUNE1CompletedDec 2024May 2024
THE MPIRE PHASE II BUILDING C - TORANAFURSUNGI PUNE1CompletedDec 2023Oct 2023

How this compares with Pune

4%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE MPIRE BUILDING - F on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near FURSUNGI13,700+ in Pune

Builder: AGN VENTURE

AGN VENTURE has 3 registrations on MahaRERA, including THE MPIRE PHASE III and THE MPIRE BUILDING E. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if THE MPIRE BUILDING - F is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE MPIRE BUILDING - F?

The registered promoter entity is AGN VENTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE MPIRE BUILDING - F?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE MPIRE BUILDING - F?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE MPIRE BUILDING - F?

The professionals named in the filing: Architect: Rao Architects; Engineer: AGRE INDIA ENGINEERING CONSULTANCY; Chartered Accountant: Heena Bhavanji Momaya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE MPIRE BUILDING - F?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE MPIRE BUILDING - F. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE MPIRE BUILDING - F to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.