Home / Browse projects / Mumbai Suburban, Maharashtra / THE LEGEND

Registered No litigation declared Residential / Group Housing project

THE LEGEND

By BLACK ROCK

RG-MH-85630 · RERA P51800052119 · Last updated on MahaRERA portal: 15 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 0%
10 of 17Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 142 documents Report an error

THE LEGEND is a Residential / Group Housing project by BLACK ROCK in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052119 on 24 Jul 2023. Possession is promised by 31 Dec 2027. 7 of the 17 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTHE LEGEND
  • TypeResidential / Group Housing
  • Location
    • NARGIS DUTT ROAD
    • PALI HILL
    • Danda
    • Andheri
    • Mumbai Suburban
    • 400050
  • Pincode400050
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052119
  • ReraGenie IDRG-MH-85630

Builder

  • NameBLACK ROCK
  • Entity typePartnership
  • PartnerAJAY PRATAP ASHAR
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jul 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed142 files

Current status

41%7 of 17 units booked

Figures as on 15 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE LEGEND by AsharNA111117017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

THE LEGEND by Ashar: 9% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
INDOOR GYMNASIUMYes0%
LANDSCAPED AREASYes0%
SWIMMING POOLYes0%

Parking filed93

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots93
Closed/Covered90
Open Space3

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,016 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
BLACK ROCKThane (M Corp.)Thane
Saira Banu KhanBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6784.0
Proposed, not sanctioned4,078 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAIN ROAD PLOT NO 39 ROAD NO 23 WAGLE INDUSTRIAL ESTATE MAHARASHTRA 400604

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDAISARIA ASSOCIATES
EngineerSanjay Patil
Chartered AccountantNITIN GALA & CO
PartnerRole in project
BLACK ROCK-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600171Bhakti AchrekarBLACK ROCK23/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jun 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed142

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 142 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - as on 18-01-2026.PDF15 Jul 2026
Form 2File: Form 2 - as on 31-01-2026.PDF15 Jul 2026
Form 3File: Form 3 - as on 31-01-2026.PDF15 Jul 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF15 Jul 2026
Form 2A (FY 2025-2026)File: 2A-Quality Assuance form -01-04-2026.PDF15 Jul 2026
Form 1File: Form 1 Black Rock-The Legend as on JAN 2025.pdf27 Jun 2026
Form 2File: Black Rock Form -2 JAN 2025.pdf27 Jun 2026
Form 3File: Form 3 _Black Rock - as on JAN 2025.pdf27 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF27 Jun 2026
Form 1File: Daisaria Associates- Form 1.pdf27 Jun 2026
Form 2File: July 2023 Form 2.pdf27 Jun 2026
Form 3File: Black Rock - Form 3.pdf27 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF27 Jun 2026
Form 1File: Rera Certificate Form 1.pdf27 Jun 2026
Form 2File: Black Rock - The Legend - Form 2.pdf27 Jun 2026
Form 3File: Form 3 - Black Rock JAN 2024.pdf27 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF27 Jun 2026
Form 1File: The Legend -Form 1 June 2024.pdf27 Jun 2026
Form 2File: Black Rock - Form 2 - June 2024.pdf27 Jun 2026
Form 3File: Black Rock - Form 3 - as on June 2024.pdf27 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF27 Jun 2026
Form 1File: The Legend -Form 1- Sept 2024.pdf27 Jun 2026
Form 2File: Black Rock -Form 2 Sept 2024 _ Orginal.pdf27 Jun 2026
Form 3File: Black Rock - From 3 as on Sept 2024.pdf27 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF27 Jun 2026
Form 1File: The Legend -Form 1- Dec 2024.pdf27 Jun 2026
Form 2File: Black Rock -Form 2 Dec 2024 _ Orginal.pdf27 Jun 2026
Form 3File: Black Rock - From 3 as on Dec 2024.pdf27 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF27 Jun 2026
Form 5 (FY 2023-2024)File: Black Rock - The Legend - FY -23-24 Form 5.pdf27 Jun 2026
Form 2A (FY 2023-2024)File: LEGEND 2A 23-24.PDF26 Jun 2026
Form 2A (FY 2024-2025)File: LEGEND 2A 24-25.PDF26 Jun 2026
Form 1File: Black Rock-The Legend Architects Certificate Form 1-30-06-2025.pdf25 Jun 2026
Form 2File: Form 2 Black Rock -as on 30-06-2025.pdf25 Jun 2026
Form 3File: Form 3 Black Rock -as on 30-06-2025.pdf25 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF25 Jun 2026
Form 1File: Form 1 - Black Rock -The Legend - 30-09-2025.pdf25 Jun 2026
Form 2File: From 2-Black Rock-The Legend-11-10-2025.pdf25 Jun 2026
Form 3File: Form 3 Black Rock-The Legend as on 30-09-2025.pdf25 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF25 Jun 2026
Form 1File: Form 1-Black Rock-The Legend as on 31-12-2025.pdf25 Jun 2026
Form 2File: Form 2 - Black Rock as on 31-12-2025.PDF25 Jun 2026
Form 3File: From 3 Black Rock as on 31-12-2025.PDF25 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF25 Jun 2026
Form 1File: FORM1.pdf25 Jun 2026
Form 2File: FORM2.pdf25 Jun 2026
Form 3File: FORM3.pdf25 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Unit-Flats.PDF25 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 _Black Rock - The Legend_FY-2024-2025 (1).pdf25 Jun 2026
Layout approvalFile: Layout (1).pdf7 Jun 2025
Building plan approvalFile: plans 1-3_3_11zon.pdf7 Jun 2025
Building plan approvalFile: 4-6_4_11zon.pdf7 Jun 2025
Building plan approvalFile: 7-10_1_11zon.pdf7 Jun 2025
Building plan approvalFile: 11-14_2_11zon.pdf7 Jun 2025
Copy of Layout Approval (in case of layout)File: Layout (1).pdf7 Jun 2025
Building Plan Approval / NA Order for plotted developmentFile: plans 1-3_3_11zon.pdf7 Jun 2025
Building Plan Approval / NA Order for plotted developmentFile: 4-6_4_11zon.pdf7 Jun 2025
Building Plan Approval / NA Order for plotted developmentFile: 7-10_1_11zon.pdf7 Jun 2025
Building Plan Approval / NA Order for plotted developmentFile: 11-14_2_11zon.pdf7 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LEGEND 2A 23-24.PDF5 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LEGEND 2A 24-25.PDF5 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31MAR2025.pdf24 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31 MARCH 2025.pdf22 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 BR May 2025.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31 MARCH 2025.pdf19 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Black Rock - The Legend - FY -23-24 Form 5.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineering Certificate.pdf17 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 - 27-07-2024.pdf10 Aug 2024
Building plan approvalFile: 1_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 2_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 3_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 4_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 5_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 6_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 7_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 8_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 9_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 10_DK_AMENDED PLAN.pdf23 Jul 2024
Building plan approvalFile: 11_DK_AMENDED PLAN.pdf23 Jul 2024

How this compares with Mumbai Suburban

41%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE LEGEND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PALI HILL6,700+ in Mumbai Suburban

2 kmTHE LEGENDCompleted 117Lapsed / revoked 52Other 126Dot size: filed unitsN

Filed coordinates, straight-line distance. 295 registered projects within 2 km.

Builder: BLACK ROCK

BLACK ROCK has 1 registration on MahaRERA, including THE LEGEND. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE LEGEND is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE LEGEND?

The registered promoter entity is BLACK ROCK, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE LEGEND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against THE LEGEND?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for THE LEGEND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE LEGEND?

The professionals named in the filing: Architect: DAISARIA ASSOCIATES; Engineer: Sanjay Patil; Chartered Accountant: NITIN GALA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE LEGEND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE LEGEND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE LEGEND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.