Registered No litigation declared Residential / Group Housing project

The Imperial I

By SDC TOWNSHIP PRIVATE LIMITED

RG-MH-99540 · RERA P51900050473 · Last updated on MahaRERA portal: 29 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 350.00 crore secured on the land, in favour of Kotak Mahindra Bank Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 83%
36 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 157 documents Report an error

The Imperial I is a Residential / Group Housing project by SDC TOWNSHIP PRIVATE LIMITED in Mumbai City, Maharashtra, registered with MahaRERA as P51900050473 on 17 Apr 2023. Possession is promised by 31 Dec 2029. 41 of the 77 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameThe Imperial I
  • TypeResidential / Group Housing
  • Location
    • Mumbai City
    • Tardeo
    • 400034
  • Pincode400034
  • RERA no.P51900050473
  • ReraGenie IDRG-MH-99540

Builder

  • NameSDC TOWNSHIP PRIVATE LIMITED
  • Entity typeCompany
  • DirectorAnil anant Katdare

Key dates

this monthRegisteredApr 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2023
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed157 files

Current status

53%41 of 77 units booked

Figures as on 29 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Imperial INA444277077

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 83%.

The Imperial I: 8% average across the applicable activities

ActivityProgress
Excavation83%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed326

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots326
Closed/Covered326

Land and ownership18

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,122 sq m
Land owned byThe promoter, with other names on the file
Named landowners18
Encumbrance on the landDeclared present
Charge in favour ofKotak Mahindra Bank Limited
Secured amountRs 350.00 crore
CERSAI search filedYes
Declared on3 Jul 2026
LandownerVillageDistrict
PATEL INDIA PRIVATE LIMITEDMumbai CityMumbai City
Bharat Kantilal PatelMumbai CityMumbai City
MAYA SUNIL CHINAIMumbai CityMumbai City
SANJAY KANTILAL PATELMumbai CityMumbai City
MONICA UDGIT DALALMumbai CityMumbai City
RUBAIYAT ARUN PATELMumbai CityMumbai City
SMITA ANIL WANIMumbai CityMumbai City
ROOPA RAJ MAHTANIMumbai CityMumbai City
NANDITA RASHESH CHOKSIMumbai CityMumbai City
SONALI W KHANMumbai CityMumbai City
RAJEEV INDUKUMAR PATELMumbai CityMumbai City
SANJEEV INDUKUMAR PATELMumbai CityMumbai City
SHEETAL RAMESH PATELMumbai CityMumbai City
INDIRA RUSHESH AMINMumbai CityMumbai City
GEETA ARUN SARUPMumbai CityMumbai City
KUNJLATA SHASHIKANT PATELMumbai CityMumbai City
PRATIBHA RAMESH PATELMumbai CityMumbai City
MARGO VINCENT PATELMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI32358.55
Proposed, not sanctioned18,771 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchChurchgate

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNewtech Planners & Consultancy Services Private Limited
EngineerMs. Rucha Watve
EngineerSamir Karkhanis
Chartered AccountantB R Nagda & Co
PartnerRole in project
SDC TOWNSHIP PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed157

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 157 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1-B M Wadia Sale Building 1725 RERA Architect Certificate December 2023.pdf29 May 2026
Form 2File: Form 2 Sale Building_dec 23.pdf29 May 2026
Form 3File: Form 3-202312 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_Dec 23.pd29 May 2026
Disclosure of Sold and Booked InventoryFile: 01) The Imperial I Inventory Info_Dec 23.pdf29 May 2026
Form 1File: Form 1- B M Wadia Sale Building 1725 RERA Architect Certificate.pdf28 May 2026
Form 2File: Form 2- Engineer certificate -Sale_Jun 23.pdf28 May 2026
Form 3File: Form 3- 20206 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_Jun 23.pd28 May 2026
Disclosure of Sold and Booked InventoryFile: 04) The Imperial I Inventory Info_Jun 23.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: 10) The Imperial I Inventory Info_Sep 23.pdf28 May 2026
Form 1File: Form 1 B M Wadia Sale Building 1725 RERA Architect Certificate.pdf28 May 2026
Form 2File: Form 2- Engineer certificate - Sale_Sep 23.pdf28 May 2026
Form 3File: Form 3-202309 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_Sep 23.pd28 May 2026
Form 1File: Form 1B M Wadia Sale Building 1725 RERA Architect Certificate.pdf28 May 2026
Form 2File: Form 2- Engineer Certificate-SDCTPL Sales March 24.pdf28 May 2026
Form 3File: Form 3- 202403 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_Mar 24.p28 May 2026
Disclosure of Sold and Booked InventoryFile: 07) The Imperial I Inventory Info_Mar 24.pdf28 May 2026
Form 1File: Form 1 B M Wadia Sale Building 1725 RERA Architect Certificate.pdf28 May 2026
Form 3File: From 3-202406 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_Jun 24.pd28 May 2026
Disclosure of Sold and Booked InventoryFile: 05) The Imperial I Inventory Info_Jun 24.pdf28 May 2026
Form 2File: Form 2 - Engineers Certificate _ 1_Jun 24.pdf28 May 2026
Form 1File: Form 1B M Wadia Sale Building 1725 RERA Architect Certificate.pdf28 May 2026
Form 2File: Form 2 Engineer Certificate Imperial I Sep 24.pdf28 May 2026
Form 3File: Form 3-202409 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_sep 24.pd28 May 2026
Disclosure of Sold and Booked InventoryFile: 11) The Imperial I Inventory Info_Sep 24.pdf28 May 2026
Form 1File: Form 1B M Wadia Sale Building 1725 RERA Architect Certificate.pdf28 May 2026
Form 2File: Form 2- Engineering Certificate - Imperial I.pdf28 May 2026
Form 3File: 202412 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_Dec 24.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: 02) The Imperial I Inventory Info_Dec 24.pdf28 May 2026
Form 1File: Form 1 B M Wadia Sale Building 1725 RERA Architect Certificate.pdf28 May 2026
Form 2File: Form 2_Sale_Dec 25.pdf28 May 2026
Form 3File: 202512 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_Dec 25.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: 03) The Imperial I Inventory Info_Dec 25.pdf28 May 2026
Form 1File: Form 1 B M Wadia Sale Building 1725 RERA Architect Certificate.pdf28 May 2026
Form 2File: SDC Township - Engineer Certificate_Mar 25.pdf28 May 2026
Form 3File: 202503 RERA Certificate The Imperial I - SDC Township Consolidated - RERA_Mar 25.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: 08) The Imperial I Inventory Info_Mar 25.pdf28 May 2026
Form 5 (FY 2023-2024)File: Form 5 SDC Township_March 24.pdf27 May 2026
Form 5 (FY 2024-2025)File: Form 5 SDC Township_Mar 25.pdf27 May 2026
Form 1File: BMW RERA Architect Certificate Dt 03 07 2025.pdf22 May 2026
Form 2File: sdc township form 2 June 2026.pdf22 May 2026
Form 3File: Imperial I Form 3 Sep 25.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: The Imperial I Inventory Info_Jun 25.pdf22 May 2026
Form 1File: BMW Architect Certificate Dt 03 10 2025.pdf22 May 2026
Form 3File: Imperial I Form 3 Sep 25.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: The Imperial I Inventory Info_Jun 25.pdf22 May 2026
Form 2File: Form 2 Sep 2025 Imperial I.pdf22 May 2026
Form 1File: Form 1 March 2026.pdf22 May 2026
Form 2File: Form 2 March 2026.pdf22 May 2026
Form 3File: Form 3 March 26.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: The Imperial I Inventory Mar 26.pdf22 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202412 RERA Certificate The Imperial I SDC Township Consolidated RERA.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202412 RERA Certificate The Imperial I Patel India and Others Land Owners RERA.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Imperial I Dec 24.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Imperial I Quality Certificate Dec 24.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202409 RERA Certificate The Imperial I - Patel India and Others Land Owners - RERA.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202409 RERA Certificate The Imperial I - SDC Township Consolidated - RERA.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 RERA Certificate The Imperial I - Patel India and Others Land Owners - RERA.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 RERA Certificate The Imperial I - SDC Township Consolidated - RERA.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202312 RERA Certificate The Imperial I - SDC Township Standalone - RERA.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Imperial I Quarter.pdf22 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Imperial I Dec 23.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 202309 RERA Certificate The Imperial I - SDC Township Consolidated - RERA.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B M Wadia Sale Building 1725 RERA Architect Certificate.pdf14 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate -Sale.pdf14 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20206 RERA Certificate The Imperial I - SDC Township Consolidated - RERA.pdf14 Sep 2023
Layout approvalFile: IOD drawing pg 2.pdf9 Aug 2023
Layout approvalFile: IOD drawing pg no 3.pdf9 Aug 2023
Layout approvalFile: IOD drawing pg 4.pdf9 Aug 2023
Layout approvalFile: IOD pg 6.pdf9 Aug 2023
Layout approvalFile: IOD pg 7.pdf9 Aug 2023
Layout approvalFile: IOD pg 8.pdf9 Aug 2023
Layout approvalFile: IOD pg 9.pdf9 Aug 2023
Layout approvalFile: IOD pg 11.pdf9 Aug 2023
Layout approvalFile: IOD pg 12.pdf9 Aug 2023
Layout approvalFile: IOD pg 13.pdf9 Aug 2023
Layout approvalFile: IOD pg 5.pdf9 Aug 2023
Layout approvalFile: IOD drawing pg 1.pdf9 Aug 2023
Copy of Layout Approval (in case of layout)File: IOD drawing pg 2.pdf9 Aug 2023
Copy of Layout Approval (in case of layout)File: IOD drawing pg no 3.pdf9 Aug 2023
Copy of Layout Approval (in case of layout)File: IOD drawing pg 4.pdf9 Aug 2023

How this compares with Mumbai City

53%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Imperial I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tardeo780+ in Mumbai City

Builder: SDC TOWNSHIP PRIVATE LIMITED

SDC TOWNSHIP PRIVATE LIMITED has 1 registration on MahaRERA, including The Imperial I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if The Imperial I is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Imperial I?

The registered promoter entity is SDC TOWNSHIP PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Imperial I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Imperial I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Imperial I?

The professionals named in the filing: Architect: Newtech Planners & Consultancy Services Private Limited; Engineer: Ms. Rucha Watve; Engineer: Samir Karkhanis; Chartered Accountant: B R Nagda & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Imperial I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Imperial I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Imperial I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.