ReraGenieLog inGet a buyer report

Home / Browse projects / THE GRAND TOWER NO 1

Registered No litigation declared Residential / Group Housing project

THE GRAND TOWER NO 1

By SAMIR NARAIN BHOJWANI

RG-MH-18497 · RERA P51900076793 · Last updated on MahaRERA portal: 15 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: .
Jan 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 91%
103 of 103Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

THE GRAND TOWER NO 1 is a Residential / Group Housing project by SAMIR NARAIN BHOJWANI in LOWER PAREL, 400013, registered with MahaRERA as P51900076793 on 28 Jun 2024. Possession is promised by 1 Jan 2028. 0 of the 103 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameTHE GRAND TOWER NO 1
  • TypeResidential / Group Housing
  • Location
    • SHANKAR RAO NARAM PATH AND HANUMAN ROAD
    • LOWER PAREL
    • 400013
  • Pincode400013
  • RERA no.P51900076793
  • ReraGenie IDRG-MH-18497

Builder

  • NameSAMIR NARAIN BHOJWANI
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2024PromisedJan 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jun 2024
  • Promised completion1 Jan 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Current status

0%0 of 103 units booked

Figures as on 15 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 - A WINGNA504551051
BUILDING NO 1- B WINGNA504552052

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 91%.

BUILDING NO 1 - A WING59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)67%
Plinth100%
Stilt Floor100%
Slabs of Super Structure91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%
BUILDING NO 1- B WING59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)67%
Plinth100%
Stilt Floor100%
Slabs of Super Structure91%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%

Progress on shared amenities15

As on 15 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,404 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jul 2025
LandownerVillageDistrict
RENAISSANCE TRUST-Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI50824.0
Proposed, not sanctioned50,823 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUNION BANK BHAVAN, GROUND FLOOR, 239, VIDHAN BHAVAN MARG, NARIMAN POINT,MUMBAI 400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEHERDAD DASTUR
EngineerSACHIN SHENOLIKAR
Chartered AccountantNEHALI & CO
PartnerRole in project
SAMIR NARAIN BHOJWANI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Jan 2028

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificatethe grand tower.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate form 3.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf14 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 06 24.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 09 24.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate.pdf19 Dec 2024
Layout approvalFile: Amended Plans bldg 1_4-4 highlighted.pdf21 Jun 2024
Layout approvalFile: declaration for plot area.pdf21 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_4-4 highlighted.pdf21 Jun 2024
Copy of Layout Approval (in case of layout)File: declaration for plot area.pdf21 Jun 2024
Other - LegalFile: Supplemental Deed- 9213-2015_1-36.pdf12 Jun 2024
Other - LegalFile: Supplemental Deed- 9213-2015_37-74.pdf12 Jun 2024
Other - LegalFile: Supplemental Deed- 9213-2015_75-112.pdf12 Jun 2024
Other - LegalFile: Supplemental Deed- 9213-2015_113-158.pdf12 Jun 2024
Other - LegalFile: Supplemental Deed- 9213-2015_159-205.pdf12 Jun 2024
Other - LegalFile: Supplemental Deed- 9213-2015_206-240.pdf12 Jun 2024
Other - LegalFile: Supplemental Deed- 9213-2015_241-end.pdf12 Jun 2024
Other - LegalFile: 1 1-38.pdf12 Jun 2024
Other - LegalFile: 2 39-76.pdf12 Jun 2024
Other - LegalFile: 3-77-114.pdf12 Jun 2024
Other - LegalFile: 4 115-152.pdf12 Jun 2024
Other - LegalFile: 5 153-190.pdf12 Jun 2024
Other - LegalFile: 6 191-228.pdf12 Jun 2024
Other - LegalFile: 7 229 END.pdf12 Jun 2024
Layout approvalFile: Amended Plans bldg 1_1-1.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_2-2.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_3-3.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_4-4 mark plan.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_5-5.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_6-6.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_7-7.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_8-8.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_9-9.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_10-10.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 11.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_12-12.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_13-13.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_14-14.pdf8 Jun 2024
Layout approvalFile: Amended Plans bldg 1_15 3.pdf8 Jun 2024
Building plan approvalFile: IOD.pdf8 Jun 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances - Finance.pdf8 Jun 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances - Finance.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_1-1.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_2-2.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_3-3.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_4-4 mark plan.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_5-5.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_6-6.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_7-7.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_8-8.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_9-9.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_10-10.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 11.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_12-12.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_13-13.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_14-14.pdf8 Jun 2024
Copy of Layout Approval (in case of layout)File: Amended Plans bldg 1_15 3.pdf8 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf8 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-the grand tower.pdf8 Jun 2024
Proforma of Agreement for saleFile: Agreement For Sale - SNB (MARKED) (1).pdf8 Jun 2024
Deviation Report with respect to Allotment letterFile: No deviation - Allotment letter (1).pdf8 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report to Agreement For Sale- SNB.pdf8 Jun 2024
Other - LegalFile: 1.pdf8 Jun 2024
Other - LegalFile: 2.pdf8 Jun 2024
Other - LegalFile: 3.pdf8 Jun 2024
Other - LegalFile: 4 115-152.pdf8 Jun 2024
Other - LegalFile: 5 153-190.pdf8 Jun 2024
Other - LegalFile: 6 191-228.pdf8 Jun 2024
Other - LegalFile: 7 229 END.pdf8 Jun 2024
Other - LegalFile: DA 1.pdf8 Jun 2024
Other - LegalFile: DA 2.pdf8 Jun 2024

Keep THE GRAND TOWER NO 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near LOWER PAREL

Builder: SAMIR NARAIN BHOJWANI

SAMIR NARAIN BHOJWANI has 1 registration on MahaRERA, including THE GRAND TOWER NO 1. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if THE GRAND TOWER NO 1 is delayed beyond 1 Jan 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE GRAND TOWER NO 1?

The registered promoter entity is SAMIR NARAIN BHOJWANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE GRAND TOWER NO 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE GRAND TOWER NO 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE GRAND TOWER NO 1?

The professionals named in the filing: Architect: MEHERDAD DASTUR; Engineer: SACHIN SHENOLIKAR; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE GRAND TOWER NO 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE GRAND TOWER NO 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE GRAND TOWER NO 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.