ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / The Auracon

Registered No litigation declared Commercial project

The Auracon

By Auracon Ventures

RG-MH-00526 · RERA P51500011621 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 60 months from the original
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

The Auracon is a Commercial project by Auracon Ventures in Aurangabad, Maharashtra, registered with MahaRERA as P51500011621 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 60 months from the original filing.

At a glance

Project

  • NameThe Auracon
  • TypeCommercial
  • Location
    • Garkheda
    • Aurangabad
    • 431009
  • Pincode431009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500011621
  • ReraGenie IDRG-MH-00526

Builder

  • NameAuracon Ventures
  • Entity typeOthers
  • Named personsNarendra Laljibhai Ghelani, Manoj Kapurchand Kala, Vishit Ravjibhai Ghelani

Key dates

this monthRegisteredAug 2017First promiseDec 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed107 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The AuraconNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

The Auracon: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes60%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered26
Open Space4

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,559 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4364.92
Proposed, not sanctioned2,166 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Plot No 64 CTS No 1530827 Sarang Co-op Housing Society Garkheda Aurangabad, Maharashtr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManoj Kala And Associates
EngineerNandish R Pethani
EngineerER SHRIPAD DESHMUKH
PartnerRole in project
Auracon Ventures-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500012554Dec 2021 → Dec 2024

Reason as filed by the promoterThe Project Delayed due to COVID so requesting extension for the said project under 7 (3) of act with consent

EXT51500027715Dec 2021 → Dec 2026

Reason as filed by the promoterDue to Technical Difficulties we required extension of the project till 31st Dec 2026,for which we also taken consent from the allottees

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2017-2018)File: Form 2A 2017-18.pdf26 May 2026
Form 2A (FY 2018-2019)File: Form 2A 2018-19.pdf26 May 2026
Form 2A (FY 2019-2020)File: Form 2A 2019-20.pdf26 May 2026
Form 2A (FY 2020-2021)File: Form 2A 2020-21.pdf26 May 2026
Form 2A (FY 2021-2022)File: Form 2A 2021-22.pdf26 May 2026
Form 2A (FY 2022-2023)File: Form 2A 2022-23.pdf26 May 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf26 May 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf26 May 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf26 May 2026
Form 1File: Form-1 Mar 26.pdf22 May 2026
Form 2File: Form-2 Mar 26.pdf22 May 2026
Form 3File: Form-3 Mar 26.pdf22 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD Mar 26.pdf22 May 2026
Form 1File: Form-1 Dec 25.pdf6 May 2026
Form 2File: Form-2 Dec 25.pdf6 May 2026
Form 3File: Form-3 Dec 25.pdf6 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD Dec 25.pdf6 May 2026
Form 1File: 1 Form-1 Jun 25.pdf12 Nov 2025
Form 2File: 2 Form-2 Jun 25.pdf12 Nov 2025
Form 3File: 3 Form-3 Jun 25.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Jun 25.pdf12 Nov 2025
Form 1File: 1 Form-1 Sep 25.pdf12 Nov 2025
Form 2File: 2 Form-2 Sep 25.pdf12 Nov 2025
Form 3File: 3 Form-2 Sep 25.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: 4 Sold Sep 25.pdf12 Nov 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 AURACON Form No 1 Mar 25.pdf3 May 2025
Certificates of CA (Form 3)File: 3 AURACON Form No 3 Mar 25.pdf3 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 AURACON Form No 2 Mar 25.pdf3 May 2025
Certificates of CA (Form 3)File: Form No 3 The Auracon_compressed.pdf1 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jan - Mar 2024.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Apr - June 2024.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 July-Sep 2024.pdf28 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Oct - Dec 2024.pdf28 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan to Mar 2024.pdf28 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Apr to Jun 2024.pdf28 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July to Sep 2024.pdf28 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct to Dec 2024.pdf28 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-2024.pdf28 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form No 5 2021-22.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form No 5 2023-24.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5 2023-24.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Auracon Form 5 2022-23.pdf16 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 [Auracon ventures]Jan-mar23.pdf27 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 [Auracon venture]apr-jun23.pdf27 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 [Auracon ventures]jul-sep23.pdf27 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 [Auracon ventures]oct-dec23.pdf27 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1jan-mar23.pdf23 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 apr-jun23.pdf23 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1july-sep23.pdf23 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form no 1oct-dec23.pdf23 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form no2A[Auracon Ventures]22-23.pdf22 Mar 2024
Disclosure of sold/ booked inventoryFile: Dis of booking[Auracon Ventures]31323.pdf22 Mar 2024
Disclosure of sold/ booked inventoryFile: Dis of booking[Auracon Ventures]311223.pdf22 Mar 2024
Certificates of CA (Form 3)File: Self Dec[Auracon Ventures]jan-mar23.pdf22 Mar 2024
Certificates of CA (Form 3)File: Self Dec[Auracon Ventures]apr-jun23.pdf22 Mar 2024
Certificates of CA (Form 3)File: Self Dec[Auracon Ventures]july-sep23.pdf22 Mar 2024
Certificates of CA (Form 3)File: Self Dec[Auracon Ventures]oct-dec23.pdf22 Mar 2024
Building plan approvalFile: Epson129_compressed.pdf30 Sep 2022
Building plan approvalFile: Epson130_compressed.pdf30 Sep 2022
Building plan approvalFile: Epson131_compressed.pdf30 Sep 2022
Building Plan Approval (IOD)File: Epson129_compressed.pdf30 Sep 2022
Building Plan Approval (IOD)File: Epson130_compressed.pdf30 Sep 2022
Building Plan Approval (IOD)File: Epson131_compressed.pdf30 Sep 2022
Declaration about Commencement CertificateFile: Auracon Ventures Format D.pdf30 Sep 2022
Building plan approvalFile: New 2021 1 part.pdf27 Sep 2022
Building plan approvalFile: new 2021 part 2.pdf27 Sep 2022
Building plan approvalFile: new 2021 part 3.pdf27 Sep 2022
Building Plan Approval (IOD)File: New 2021 1 part.pdf27 Sep 2022
Building Plan Approval (IOD)File: new 2021 part 2.pdf27 Sep 2022
Building Plan Approval (IOD)File: new 2021 part 3.pdf27 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 2021.pdf27 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 31-3-19.pdf21 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 31-3-20.pdf21 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 31-3-21.pdf21 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-3-19.pdf21 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-3-20.pdf21 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-3-21.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf21 Aug 2021

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one moved by 60 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep The Auracon on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Garkheda1,400+ in Aurangabad

Builder: Auracon Ventures

Auracon Ventures has 1 registration on MahaRERA, including The Auracon. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if The Auracon is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Auracon?

The registered promoter entity is Auracon Ventures, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Auracon?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Auracon?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Auracon?

The professionals named in the filing: Architect: Manoj Kala And Associates; Engineer: Nandish R Pethani; Engineer: ER SHRIPAD DESHMUKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Auracon?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Auracon. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Auracon to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.