Registered No litigation declared Residential / Group Housing project

THE AUGUST VILLAS

By SANTOSH MAYURENDRA BHIWANDKAR

RG-MH-06682 · RERA P52000053336 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
33 of 880Construction stages doneacross 81 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

THE AUGUST VILLAS is a Residential / Group Housing project by SANTOSH MAYURENDRA BHIWANDKAR in Raigarh, Maharashtra, registered with MahaRERA as P52000053336 on 27 Oct 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameTHE AUGUST VILLAS
  • TypeResidential / Group Housing
  • Location
    • KONDIVADE ROAD NEAR MOHILI MEADOWS
    • KARJAT NEWALI
    • Mohili T. Wasare
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053336
  • ReraGenie IDRG-MH-06682

Builder

  • NameSANTOSH MAYURENDRA BHIWANDKAR
  • Entity typeIndividual
  • GSTIN27ADCPB7384D1ZR
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings80 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUNGALOW NO 1NA11000
BUNGALOW NO 2NA11000
BUNGALOW NO 3NA11000
BUNGALOW NO 4NA11000
BUNGALOW N0 5NA11000
BUNGALOW NO 6NA11000
BUNGALOW NO 7NA11000
BUNGALOW NO 8NA11000
BUNGALOW NO 9NA11000
BUNGALOW NO 10NA11000
BUNGALOW N0 11NA11000
BUNGALOW NO 12NA11000
BUNGALOW N0 13NA11000
BUNGALOW NO 14NA11000
BUNGALOW NO 15NA11000
BUNGALOW NO 16NA11000
BUNGALOW NO 17NA11000
BUNGALOW NO 18NA11000
BUNGALOW NO 19NA11000
BUNGALOW NO 20NA11000
BUNGALOW NO 21NA11000
BUNGALOW NO 22NA11000
BUNGALOW NO 23NA11000
BUNGALOW NO 24NA11000
BUNGALOW NO 25NA11000
BUNGALOW NO 26NA11000
BUNGALOW NO 27NA11000
BUNGALOW NO 28NA11000
BUNGALOW NO 29NA11000
BUNGALOW NO 30NA11000
BUNGALOW NO 31NA11000
BUNGALOW NO 32NA11000
BUNGALOW NO 33NA11000
BUNGALOW NO 34NA11000
BUNGALOW NO 35NA11000
BUNGALOW NO 36NA11000
BUNGALOW NO 37NA11000
BUNGALOW NO 38NA11000
BUNGALOW NO 39NA11000
BUNGALOW NO 40NA11000
BUNGALOW NO 41NA11000
BUNGALOW NO 42NA11000
BUNGALOW NO 43NA11000
BUNGALOW NO 44NA11000
BUNGALOW NO 45NA11000
BUNGALOW NO 46NA11000
BUNGALOW NO 47NA11000
BUNGALOW NO 48NA11000
BUNGALOW NO 49NA11000
BUNGALOW NO 50NA11000
BUNGALOW NO 51NA11000
BUNGALOW NO 52NA11000
BUNGALOW NO 53NA11000
BUNGALOW NO 54NA11000
BUNGALOW NO 55NA11000
BUNGALOW NO 56NA11000
BUNGALOW NO 57NA11000
BUNGALOW NO 58NA11000
BUNGALOW NO 59NA11000
BUNGALOW NO 60NA11000
BUNGALOW NO 61NA11000
BUNGALOW NO 62NA11000
BUNGALOW NO 63NA11000
BUNGALOW NO 64NA11000
BUNGALOW NO 65NA11000
BUNGALOW NO 66NA11000
BUNGALOW NO 67NA11000
BUNGALOW NO 68NA11000
BUNGALOW NO 69NA11000
BUNGALOW NO 70NA11000
BUNGALOW NO 71NA11000
BUNGALOW NO 72NA11000
BUNGALOW NO 73NA11000
BUNGALOW NO 74NA11000
BUNGALOW NO 75NA11000
BUNGALOW NO 76NA11000
BUNGALOW NO 77NA11000
BUNGALOW NO 78NA11000
BUNGALOW NO 79NA11000
BUNGALOW NO 80NA11000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 81 buildings; the table lists the first 20.

33 of 880 construction stages are filed complete across 81 buildings. The stage furthest along is Podiums (if any), at 0%.

BUNGALOW NO 145%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 255%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 355%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 464%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW N0 518%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 764%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUNGALOW NO 80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW N0 110%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW N0 130%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 140%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 150%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 160%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 170%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 180%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 190%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW NO 200%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes5%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes5%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area65,190 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityDistrict Collector office of Raigad
Permissible FSI15623.0
Proposed, not sanctioned15,622 sq m
Buildings approved80
Buildings sanctioned80

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIDBI BANK LTD,5,WADALA UDYOG BHAVAN, NAIGAON, MUMBAI-400031

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SANTOSH MAYURENDRA BHIWANDKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Rera form1 for(31-12-2025)-SIGNED.pdf22 Jun 2026
Form 2File: Form 2 - The August Villas as on Dec 2025.pdf22 Jun 2026
Form 3File: The_August_Villas_Form3_Q3_2025-26_19-06-2026_13-10_doc1.pdf22 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - The August Villas as on dec 2025.pdf22 Jun 2026
Form 1File: Rera form1 for(31-03-2026)-SIGNED.pdf22 Jun 2026
Form 2File: Form 2 - The August Villas as on March 2026.pdf22 Jun 2026
Form 3File: The_August_Villas_Form3_Q4_2025-26_19-06-2026_13-12_doc1.pdf22 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - The August Villas as on march 2026.pdf22 Jun 2026
Form 1File: Form 1 - The August Villas as on June 2025.pdf28 Nov 2025
Form 2File: Form 2 - The August Villas as on June 2025-Signed.pdf28 Nov 2025
Form 3File: Form 3 - The August Villas as on June 2025-Signed_.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - The August Villas as on June 2025.pdf28 Nov 2025
Form 1File: Form 1 - The August Villa as on Sept 2025.pdf28 Nov 2025
Form 2File: Form 2 - The August Villa as on Sept 2025-Signed.pdf28 Nov 2025
Form 3File: Form 3 - The August Villa as on Sept 2025-Signed_.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - The August Villa as on Sept 2025.pdf28 Nov 2025
Form 1File: Form -1 as on 30 06 2024.pdf16 Jun 2025
Form 3File: FORM-3-AS ON 30062024_compressed.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold -Q-1.pdf16 Jun 2025
Form 2File: FORM-2-30-06-2024-NEW.pdf16 Jun 2025
Form 1File: Form -1 as on 30 09 2024.pdf16 Jun 2025
Form 2File: FORM-23-09-2024-NEW.pdf16 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold-Q-2.pdf16 Jun 2025
Form 3File: FORM-3-Q-2_compressed_compressed (1).pdf16 Jun 2025
Form 1File: Form -1 Architect's Certificate.pdf13 Jun 2025
Form 2File: Engineer Form 2.pdf13 Jun 2025
Form 3File: Form-3-Oct-2023.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Details of unsold and booked inventory.pdf13 Jun 2025
Form 1File: Form -1 Architect's Certificate 31-03-24.pdf13 Jun 2025
Form 2File: FORM-2-31_03_2024.pdf13 Jun 2025
Form 3File: form-3-31032024_compressed.pdf13 Jun 2025
Disclosure of Sold and Booked InventoryFile: Details of usold and sold inventory-31032024_compressed.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate 31-03-24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-31_03_2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3-31032024_compressed.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate 31-03-24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-31_03_2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3-31032024_compressed.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate 31-03-24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-31_03_2024.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3-31032024_compressed.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate 31-03-24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3-31032024_compressed.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-31_03_2024.pdf6 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report-Allotment-20102023.pdf20 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report-Agreement for sale-20102023.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect's Certificate.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3-19-10-2023_compressed.pdf19 Oct 2023
Proforma of Agreement for saleFile: RERA AGREEMENT FOR SALE-FINAL.pdf19 Oct 2023
Copy of the legal title reportFile: TITLE REPORT 04102023_compressed.pdf4 Oct 2023
Proforma of Allotment letterFile: Revised Allotment Letter.pdf4 Oct 2023
Layout approvalFile: layout plan compressed.pdf27 Sep 2023
Building plan approvalFile: TYPE A 4 BHK PLAN_compressed.pdf27 Sep 2023
Building plan approvalFile: TYPE B 3 BHK PLAN_compressed.pdf27 Sep 2023
Building plan approvalFile: TYPE C 3 BHK PLAN_compressed.pdf27 Sep 2023
Building plan approvalFile: TYPE D 2 BHK PLAN_compressed.pdf27 Sep 2023
Building plan approvalFile: CLUB HOUSE_compressed.pdf27 Sep 2023
Details of encumbrances concerned to FinanceFile: Declaration legal and finance.pdf27 Sep 2023
Details of encumbrances concerned to LegalFile: Declaration legal and finance.pdf27 Sep 2023
Copy of Layout Approval (in case of layout)File: layout plan compressed.pdf27 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE A 4 BHK PLAN_compressed.pdf27 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE B 3 BHK PLAN_compressed.pdf27 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE C 3 BHK PLAN_compressed.pdf27 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: TYPE D 2 BHK PLAN_compressed.pdf27 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: CLUB HOUSE_compressed.pdf27 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: N A COPY_compressed.pdf27 Sep 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf27 Sep 2023
Declaration in FORM BFile: FORM B SCAN COPY.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2.pdf27 Sep 2023
CERSAI detailsFile: CERSAI DECLARATION-PDF.pdf27 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of other real estate organisation.pdf27 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORM-A-BANK ACCOUNT DECLRATION.pdf27 Sep 2023
PAN CardFile: SANTOSH SIR PAN.pdf7 Sep 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MY ELEMENTSURVEY NO 100 2B VILLAGE KOTHIMBE KARJAT107OngoingDec 2024Dec 2024
PARADISO BAY416-1 415 KIHIM ALIBAG192CompletedJun 2021Jun 2021

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE AUGUST VILLAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KARJAT NEWALI5,900+ in Raigarh

Builder: SANTOSH MAYURENDRA BHIWANDKAR

SANTOSH MAYURENDRA BHIWANDKAR has 2 registrations on MahaRERA, including MY ELEMENT and THE AUGUST VILLAS. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if THE AUGUST VILLAS is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE AUGUST VILLAS?

The registered promoter entity is SANTOSH MAYURENDRA BHIWANDKAR, an individual as per the filing. Its GSTIN 27ADCPB7384D1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE AUGUST VILLAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE AUGUST VILLAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in THE AUGUST VILLAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE AUGUST VILLAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE AUGUST VILLAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.