Home / Browse projects / Pune, Maharashtra / The Address - 2

Completed No litigation declared Residential / Group Housing project

The Address - 2

By SOL Developers

RG-MH-20318 · RERA P52100007886 · Last updated on MahaRERA portal: 7 Jul 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
25 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 93%
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

The Address - 2 is a Residential / Group Housing project by SOL Developers in Pune, Maharashtra, registered with MahaRERA as P52100007886 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2022. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameThe Address - 2
  • TypeResidential / Group Housing
  • Location
    • BORATE VASTI
    • MOSHI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007886
  • ReraGenie IDRG-MH-20318

Builder

  • NameSOL Developers
  • Entity typeCompany
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseJun 2020Revised toJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 30 Jun 2020)
  • Buildings3 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA140000
B BuildingNA160000
H BuildingNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 7 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 93%.

A Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Building67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure93%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
H Building91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 7 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes5%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes30%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed250

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots250
Closed/Covered155
Open Space95
BuildingClosed/CoveredOpen SpaceTotal
A Building292857
B Building7236108
H Building543185

Land and ownership38

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,539 sq m
Land owned byThe promoter, with other names on the file
Named landowners38
LandownerVillageDistrict
Jayantilal SastePimpri Chinchawad (M Corp.)Pune
Suvarna jayntilal SastePimpri Chinchawad (M Corp.)Pune
Vishal Jayantilal SastePimpri Chinchawad (M Corp.)Pune
SNEHAL JAYNTILAL SASTEPimpri Chinchawad (M Corp.)Pune
SHITAL YUVRAJ TAPKIRPimpri Chinchawad (M Corp.)Pune
MARUTI NIVRUTI SASTEPimpri Chinchawad (M Corp.)Pune
KANCHAN MARUTI SASTEPimpri Chinchawad (M Corp.)Pune
KAUSALYABAI HIRAMAN SASTEPimpri Chinchawad (M Corp.)Pune
YASHWANT HIRAMAN SASTEPimpri Chinchawad (M Corp.)Pune
MANISHA YASWANT SASTEPimpri Chinchawad (M Corp.)Pune
PAYAL YASWANT SASTEPimpri Chinchawad (M Corp.)Pune
NIKHIL YASWANT SASTEPimpri Chinchawad (M Corp.)Pune
DATTATERY SHANTARAM BORATEPimpri Chinchawad (M Corp.)Pune
CHAITALI BHARAT PARKHIPimpri Chinchawad (M Corp.)Pune
ANJANA SAKAHARAM BORATEPimpri Chinchawad (M Corp.)Pune
JAYSHREE SHANTARAM BORATEPimpri Chinchawad (M Corp.)Pune
NANDINI NITIN SAVANTPimpri Chinchawad (M Corp.)Pune
NEETA SUNIL BORATEPimpri Chinchawad (M Corp.)Pune
NITIN SHANTARAM BORATEPimpri Chinchawad (M Corp.)Pune
PALLAVI DATTATRAY BORATEPimpri Chinchawad (M Corp.)Pune
SHANTRAM LAXMAN BORATEPimpri Chinchawad (M Corp.)Pune
SHOBHASAKHARAM BORATEPimpri Chinchawad (M Corp.)Pune
SUNIL SAKHARAMPimpri Chinchawad (M Corp.)Pune
VAISHALI SACHIN KUDALEPimpri Chinchawad (M Corp.)Pune
GITESH SAKHARAM BORATEPimpri Chinchawad (M Corp.)Pune
SALAN PANDURANG SASTEPimpri Chinchawad (M Corp.)Pune
USHA NITIN SASTEPimpri Chinchawad (M Corp.)Pune
SANJAY PANDURANG SASTEPimpri Chinchawad (M Corp.)Pune
SHIVAM SANJAY SASTEPimpri Chinchawad (M Corp.)Pune
VANDANA SANJAY SASTEPimpri Chinchawad (M Corp.)Pune
AJAY PANDURANG SASTEPimpri Chinchawad (M Corp.)Pune
MOHINI AJAY SASTEPimpri Chinchawad (M Corp.)Pune
VIJAY PANDURANG SASTEPimpri Chinchawad (M Corp.)Pune
SOHAN VIJAY SASTEPimpri Chinchawad (M Corp.)Pune
SHARYU VIJAY SASTEPimpri Chinchawad (M Corp.)Pune
NITIN PANDURANG SASTEPimpri Chinchawad (M Corp.)Pune
SATYAM NITIN SASTEPimpri Chinchawad (M Corp.)Pune
SUBHANGI PRATIK KANTEPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI63104.51
Proposed, not sanctioned25,415 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchaxis bank plot no 80 kalyani chamber ground floor,nigdi pune-411044

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Vikas Achalkar
EngineerG A Bhilare Consultants Private Limited
PartnerRole in project
SOL Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001079Jun 2020 → Jun 2021

Reason as filed by the promoterDelay in obtaining Completion Certificate.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Jul 2023

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion B.pdf7 Jul 2023
Layout approvalFile: Layout Plan_1_page-0001.pdf18 May 2022
Copy of Layout Approval (in case of layout)File: Layout Plan_1_page-0001.pdf18 May 2022
Building plan approvalFile: IMG 04.pdf29 Oct 2021
Building Plan Approval (IOD)File: IMG 04.pdf29 Oct 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf5 Aug 2020
Architect’s Certificate on Completion of Project (Form 4)File: SOL DEVELOPERS.PDF5 Aug 2020
Certificates of CA (Form 5)File: Form 5- phase 2.pdf3 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: E BLDG Complition_.pdf1 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: OC C D BLDG.pdf23 Apr 2019
Declaration in FORM BFile: The Address 2 - Form B - compressed.pdf28 Dec 2018
Certificates of CA (Form 5)File: FORM 5 CA THE ADDRESS - PHASE II.PDF26 Dec 2018
Building plan approvalFile: A TYPE - 2.pdf30 Jul 2017
Building plan approvalFile: H TYPE - 1.pdf30 Jul 2017
Building plan approvalFile: H TYPE - 2.pdf30 Jul 2017
Building plan approvalFile: H TYPE - 3.pdf30 Jul 2017
Building plan approvalFile: H TYPE - 4.pdf30 Jul 2017
Building plan approvalFile: B TYPE - 4.pdf30 Jul 2017
Building plan approvalFile: B TYPE - 2.pdf30 Jul 2017
Building plan approvalFile: B TYPE - 3.pdf30 Jul 2017
Building plan approvalFile: A TYPE - 3.pdf30 Jul 2017
Building plan approvalFile: A TYPE - 4.pdf30 Jul 2017
Building plan approvalFile: B TYPE - 1.pdf30 Jul 2017
Building plan approvalFile: A TYPE - 1.pdf30 Jul 2017
Layout approvalFile: LAYOUT - REVISE SANCTION.pdf30 Jul 2017
PAN CardFile: PAN.PDF30 Jul 2017
Copy of the legal title reportFile: LEGAL TITLE REPORT.PDF30 Jul 2017
Details of encumbrancesFile: ENCUMBRANCES.PDF30 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT - REVISE SANCTION.pdf30 Jul 2017
Building Plan Approval (IOD)File: A TYPE - 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: A TYPE - 2.pdf30 Jul 2017
Building Plan Approval (IOD)File: A TYPE - 3.pdf30 Jul 2017
Building Plan Approval (IOD)File: A TYPE - 4.pdf30 Jul 2017
Building Plan Approval (IOD)File: B TYPE - 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: B TYPE - 2.pdf30 Jul 2017
Building Plan Approval (IOD)File: B TYPE - 3.pdf30 Jul 2017
Building Plan Approval (IOD)File: B TYPE - 4.pdf30 Jul 2017
Building Plan Approval (IOD)File: H TYPE - 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: H TYPE - 2.pdf30 Jul 2017
Building Plan Approval (IOD)File: H TYPE - 3.pdf30 Jul 2017
Building Plan Approval (IOD)File: H TYPE - 4.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC - 1.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC - 2.PDF30 Jul 2017
Declaration in FORM BFile: FORM B.PDF30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.PDF30 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.PDF30 Jul 2017
Proforma of Allotment letterFile: SALE DEED.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
THE ADDRESS-1gat no 519 520 Pune Nashik Road moshi12CompletedNov 2019Apr 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Address - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOSHI13,700+ in Pune

2 kmThe Address - 2Completed 162Lapsed / revoked 119Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 434 registered projects within 2 km.

Builder: SOL Developers

SOL Developers has 4 registrations on MahaRERA, including The Address - 1 and The Address - 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if The Address - 2 is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Address - 2?

The registered promoter entity is SOL Developers, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Address - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Address - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Address - 2?

The professionals named in the filing: Architect: Ar Vikas Achalkar; Engineer: G A Bhilare Consultants Private Limited. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Address - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Address - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Address - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.