Home / Browse projects / Pune, Maharashtra / TEJAS NANDAN
TEJAS NANDAN
By TEJAS PROMOTERS AND BUILDERS
RG-MH-76665 · RERA P52100053302 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
TEJAS NANDAN is a Others project by TEJAS PROMOTERS AND BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100053302 on 23 Oct 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 71 of the 99 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameTEJAS NANDAN
- TypeOthers
- Location
- Moshi Alandi Road
- Dudulgaon
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100053302
- ReraGenie IDRG-MH-76665
Builder
- NameTEJAS PROMOTERS AND BUILDERS
- Entity typePartnership
- PartnersBHALCHANDRA SHETIBA LASHKARE, GANESH BHALCHANDRA LASHKARE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on23 Oct 2023
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed83 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 13 | 12 | 88 | 11 | 99 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
BUILDING A: 72% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed170
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING A | NA | Rs 35.62 cr | Rs 27.01 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amit Shetty |
| Architect | Mohit Jadhav |
| Engineer | DNYANDEV ABA KOHAK |
| Chartered Accountant | Sumit Bhaskar Kulkarni |
| Chartered Accountant | R H Pothiwal & Associates |
| Chartered Accountant | Sachin K. Mishra & Co. |
| Partner | Role in project |
|---|---|
| TEJAS PROMOTERS AND BUILDERS | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 218/2023 | CJJD AND JMFC Pimpri | withdraw |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed83
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate- Mar 26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: Engineer Certificate- Mar-26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: CA Certificate_March 26.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineer Certificate Dec 25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: CA Certificate-Tejas Nandan_Dec 25.pdf | 20 Jan 2026 |
| Form 5 (FY 2023-2024)File: RERA Audit Report_23-24.pdf | 18 Dec 2025 |
| Form 5 (FY 2024-2025)File: RERA Audit Report_24-25.pdf | 18 Dec 2025 |
| Withdrawal Update Form 1File: Form 1_Sep 25.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Sep 25.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 25.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: Form 1_Sep 25.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Sep 25.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Sep 25.pdf | 18 Oct 2025 |
| Withdrawal Update Form 1File: Form 1_June 25.pdf | 19 Aug 2025 |
| Withdrawal Update Form 2File: Form 2_June 25.pdf | 19 Aug 2025 |
| Withdrawal Update Form 3File: Form 3_June 25.pdf | 19 Aug 2025 |
| Form 1File: 1 Architect Certificate - Dec 23.pdf | 11 Jul 2025 |
| Form 2File: 1 Engineer Certificate .pdf | 11 Jul 2025 |
| Form 3File: 1 CA Certificate-Tejas Nandan-Dec-23.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 1 Disclosure of Sold Booked Inventory - Dec 23.pdf | 11 Jul 2025 |
| Form 1File: 2 Architect Certificate - Mar 24.pdf | 11 Jul 2025 |
| Form 2File: 2 Engineer Certificate .pdf | 11 Jul 2025 |
| Form 3File: 2 CA Certificate-Tejas Nandan_Mar-24.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 2 Disclosure of Sold Booked Inventory - Mar 24.pdf | 11 Jul 2025 |
| Form 1File: 3 Architect Certificate - Jun 24.pdf | 11 Jul 2025 |
| Form 2File: 3 Engineer Certificate .pdf | 11 Jul 2025 |
| Form 3File: 3 CA Certificate-Tejas Nandan_Jun-24.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 3 Disclosure of Sold Booked Inventory - Jun 24.pdf | 11 Jul 2025 |
| Form 1File: 4 Architect Certificate - Sep 24.pdf | 11 Jul 2025 |
| Form 2File: 4 Engineer Certificate .pdf | 11 Jul 2025 |
| Form 3File: 4 CA Certificate-Tejas Nandan_Sep-24.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Disclosure of Sold Booked Inventory - Sep 24.pdf | 11 Jul 2025 |
| Form 1File: 5 Architect Certificate - Dec 24.pdf | 11 Jul 2025 |
| Form 2File: 5 Engineer Certificate .pdf | 11 Jul 2025 |
| Form 3File: 5 CA Certificate-Tejas Nandan_Dec-24.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure of Sold Booked Inventory - Dec 24.pdf | 11 Jul 2025 |
| Form 1File: 6 Architect Certificate - Mar 25.pdf | 11 Jul 2025 |
| Form 2File: 6 Engineer Certificate .pdf | 11 Jul 2025 |
| Form 3File: 6 CA Certificate-Tejas Nandan_Mar-25.pdf | 11 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 6 Disclosure of Sold Booked Inventory - Mar 25.pdf | 11 Jul 2025 |
| Building plan approvalFile: 4.pdf | 24 Dec 2024 |
| Building plan approvalFile: 3_compressed.pdf | 24 Dec 2024 |
| Building plan approvalFile: 5.pdf | 24 Dec 2024 |
| Building plan approvalFile: 6.pdf | 24 Dec 2024 |
| Building plan approvalFile: 2.pdf | 24 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4.pdf | 24 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf | 24 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5.pdf | 24 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 6.pdf | 24 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 24 Dec 2024 |
| Layout approvalFile: HPSCANNER2434_compressed.pdf | 8 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: HPSCANNER2434_compressed.pdf | 8 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: NEW COMMENCEMENT CERTIFICATE-1_compressed.pdf | 8 Nov 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf | 5 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 4 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 20230901021040.pdf | 11 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 23 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold inventry.pdf | 23 Aug 2023 |
| CERSAI detailsFile: Tejas Nandan CERSAI.pdf | 23 Aug 2023 |
| Building plan approvalFile: Section Plan.pdf | 7 Jul 2023 |
| Building plan approvalFile: Basement.pdf | 7 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Section Plan.pdf | 7 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Basement.pdf | 7 Jul 2023 |
| Declaration in FORM BFile: FORM-B.pdf | 7 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance.pdf | 11 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance.pdf | 11 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation certificate Allotment Letter.pdf | 29 May 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation certificate Allotment Letter.pdf | 29 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: No Deviation certificate for Model copy of Agreement.pdf | 29 May 2023 |
| Layout approvalFile: Building layout.pdf | 27 May 2023 |
| Building plan approvalFile: Floor plan.pdf | 27 May 2023 |
| PAN CardFile: PanCard.pdf | 27 May 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 27 May 2023 |
| Details of encumbrances concerned to FinanceFile: Detail of Encumbrances.pdf | 27 May 2023 |
| Details of encumbrances concerned to LegalFile: Detail of Encumbrances.pdf | 27 May 2023 |
| Copy of Layout Approval (in case of layout)File: Building layout.pdf | 27 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Floor plan.pdf | 27 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 27 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf | 27 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 83 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep TEJAS NANDAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dudulgaon13,700+ in Pune
Filed coordinates, straight-line distance. 143 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: TEJAS PROMOTERS AND BUILDERS
TEJAS PROMOTERS AND BUILDERS has 1 registration on MahaRERA, including TEJAS NANDAN. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that TEJAS NANDAN shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if TEJAS NANDAN is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of TEJAS NANDAN?
The registered promoter entity is TEJAS PROMOTERS AND BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in TEJAS NANDAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for TEJAS NANDAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at TEJAS NANDAN?
The professionals named in the filing: Architect: Amit Shetty; Architect: Mohit Jadhav; Engineer: DNYANDEV ABA KOHAK; Chartered Accountant: Sumit Bhaskar Kulkarni; Chartered Accountant: R H Pothiwal & Associates; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TEJAS NANDAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback