Red flags

  • Rs 20.00 crore secured on the land, in favour of CAPRI GLOBAL HOUSING FINANCE LTD

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 35%
123 of 129Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

Tathastu Phase II is a Others project by SHREE UMIYA BUILDCON in Pune, Maharashtra, registered with MahaRERA as P52100079143 on 10 Feb 2025. Possession is promised by 31 Mar 2028. 6 of the 129 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameTathastu Phase II
  • TypeOthers
  • Location
    • Chovisawadi
    • Haveli
    • Pune
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079143
  • ReraGenie IDRG-MH-30808

Builder

  • NameSHREE UMIYA BUILDCON
  • Entity typePartnership
  • GSTIN27ACSFS7471B1ZP
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHARESHKUMAR PACHANBHAI PATEL, MANISHKUMAR SHANKARAL PATEL, NASRI HARJI PATEL, MEHUL PRADIP RAMANI, GAURAV DINESHBHAI PATEL, JIGNEHKUMAR AMBALAL RAMJIYANI
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredFeb 2025PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Feb 2025
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

5%6 of 129 units booked
23.7%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tathastu Phase II NA15139732129

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 35%.

Tathastu Phase II: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure35%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed248

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots248
Closed/Covered88
Open Space160

Land and ownership50

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,650 sq m
Land owned byThe promoter, with other names on the file
Named landowners50
Encumbrance on the landDeclared present
Charge in favour ofCAPRI GLOBAL HOUSING FINANCE LTD
Secured amountRs 20.00 crore
CERSAI search filedYes
Declared on26 Dec 2025
LandownerVillageDistrict
Abhijeet Kantaram TapkirPimpri Chinchawad (M Corp.)Pune
Gauri Abhijeet TapkirPimpri Chinchawad (M Corp.)Pune
Ishwari Abhijeet TapkirPimpri Chinchawad (M Corp.)Pune
Aayansh Abhijeet TapkirPimpri Chinchawad (M Corp.)Pune
Anup Kantaram TapkirPimpri Chinchawad (M Corp.)Pune
Kshitija Anup TapkirPimpri Chinchawad (M Corp.)Pune
Balasaheb Vishnupant TapkirPimpri Chinchawad (M Corp.)Pune
Chandrakala Balasaheb TapkirPimpri Chinchawad (M Corp.)Pune
Nikhil Balasaheb TapkirPimpri Chinchawad (M Corp.)Pune
Abhilasha Nikhil TapkirPimpri Chinchawad (M Corp.)Pune
Anay Nikhil TapkirPimpri Chinchawad (M Corp.)Pune
Neha Saurabh SonparatePimpri Chinchawad (M Corp.)Pune
Dattatray Dashrath TapkirPimpri Chinchawad (M Corp.)Pune
Vaishali Dattatray TapkirPimpri Chinchawad (M Corp.)Pune
Shubham Dattatray TapkirPimpri Chinchawad (M Corp.)Pune
Subhadra Dattatray TapkirPimpri Chinchawad (M Corp.)Pune
Anil Dashrath TapkirPimpri Chinchawad (M Corp.)Pune
Meena Anil TapkirPimpri Chinchawad (M Corp.)Pune
Rishikesh Anil TapkirPimpri Chinchawad (M Corp.)Pune
Abhishek Anil TapkirPimpri Chinchawad (M Corp.)Pune
Shashikala Sambhaji HarpalePimpri Chinchawad (M Corp.)Pune
Rohidas Mahadev TapkirPimpri Chinchawad (M Corp.)Pune
Nirmala Rohidas TapkirPimpri Chinchawad (M Corp.)Pune
Priyanka Rohidas TapkirPimpri Chinchawad (M Corp.)Pune
Prajakta Radhakrushna PangaPimpri Chinchawad (M Corp.)Pune
Prajwal Rohidas TapkirPimpri Chinchawad (M Corp.)Pune
Dnyaneshwar Mahadu TapkirPimpri Chinchawad (M Corp.)Pune
Ujwala Dnyaneshwar TapkirPimpri Chinchawad (M Corp.)Pune
Amit Dnyaneshwar TapkirPimpri Chinchawad (M Corp.)Pune
Abhilasha Amit TapkirPimpri Chinchawad (M Corp.)Pune
Aditya Dnyaneshwar TapkirPimpri Chinchawad (M Corp.)Pune
Janabai Ashok SortePimpri Chinchawad (M Corp.)Pune
Urmila Balasaheb DevkarPimpri Chinchawad (M Corp.)Pune
Sagar Ramdas TapkirPimpri Chinchawad (M Corp.)Pune
Nikita Sagar TapkirPimpri Chinchawad (M Corp.)Pune
Tanishka Sagar TapkirPimpri Chinchawad (M Corp.)Pune
Anushka Sagar TapkirPimpri Chinchawad (M Corp.)Pune
Avdhut Sagar TapkirPimpri Chinchawad (M Corp.)Pune
Seeta Ramdas TapkirPimpri Chinchawad (M Corp.)Pune
Sameer Ramdas TapkirPimpri Chinchawad (M Corp.)Pune
Manisha Shrikant BarnePimpri Chinchawad (M Corp.)Pune
Sunil Shantaram TapkirPimpri Chinchawad (M Corp.)Pune
Mandakini Sunil TapkirPimpri Chinchawad (M Corp.)Pune
Jayesh Sunil TapkirPimpri Chinchawad (M Corp.)Pune
Prathamensh Sunil TapkirPimpri Chinchawad (M Corp.)Pune
Sachin Shantaram TapkirPimpri Chinchawad (M Corp.)Pune
Pranjali Sachin TapkirPimpri Chinchawad (M Corp.)Pune
Swastik Sachin TapkirPimpri Chinchawad (M Corp.)Pune
Alka Shantaram TapkirPimpri Chinchawad (M Corp.)Pune
Ujwala Kantaram TapkirPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpari Chinchwad municipal corporation, Pimpari
Permissible FSI11932.12
Proposed, not sanctioned11,932 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1 SILVANA COUNTRY S NO 1 PUNE ALANDI RD CHOVISAWADI CHARHOLI BK PUNE MAHARASHTRA 412105
Estimated costRs 36.00 cr
Cost incurredRs 8.53 cr
Work done23.68%
BuildingWingEstimatedIncurred
Tathastu Phase IINARs 36.00 crRs 8.53 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrecision Architects & Planner
EngineerArrow Structural Consultants
EngineerManoj Gopinath Shinde
Chartered AccountantR H Pothiwal & Associates
Chartered AccountantPravin Pise & Associates
PartnerRole in project
M/s Shree Umiya Buildcon-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Tathastu PH-II FORM -1_Sign.pdf30 Apr 2026
Withdrawal Update Form 2File: Tathastu PH-II FORM-2_Sign.pdf30 Apr 2026
Withdrawal Update Form 3File: F3_TATHASTU-II_Sign.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf13 Feb 2026
Withdrawal Update Form 2File: fm_2_dEC_2025.pdf13 Feb 2026
Withdrawal Update Form 3File: F3-TATHATU-II(Q3)_compressed.pdf13 Feb 2026
Withdrawal Update Form 1File: Form-1.pdf19 Dec 2025
Withdrawal Update Form 2File: Form-2_compressed.pdf19 Dec 2025
Withdrawal Update Form 3File: C A Certificate 18-10-2025_compressed.pdf19 Dec 2025
Withdrawal Update Form 1File: Form-1- 30-06-2025.pdf12 Nov 2025
Withdrawal Update Form 2File: Form 2 -30-06-2025.pdf12 Nov 2025
Withdrawal Update Form 3File: Updated Form 3.pdf12 Nov 2025
Withdrawal Update Form 1File: Form-1- 30-06-2025.pdf1 Nov 2025
Withdrawal Update Form 2File: Form 2 -30-06-2025.pdf1 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf1 Nov 2025
Building plan approvalFile: 1-8.pdf3 Sep 2025
Building plan approvalFile: 2-8.pdf3 Sep 2025
Building plan approvalFile: 3-8.pdf3 Sep 2025
Building plan approvalFile: 4-8.pdf3 Sep 2025
Building plan approvalFile: 5-8.pdf3 Sep 2025
Building plan approvalFile: 6-8.pdf3 Sep 2025
Building plan approvalFile: 7-8.pdf3 Sep 2025
Building plan approvalFile: 8-8.pdf3 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf3 Sep 2025
Building plan approvalFile: Revised Plan-Sheet No 1.pdf22 Jul 2025
Building plan approvalFile: Revised Plan-Sheet No 2.pdf22 Jul 2025
Building plan approvalFile: Revised Plan-Sheet No 3.pdf22 Jul 2025
Building plan approvalFile: Revised Plan-Sheet No 4.pdf22 Jul 2025
Building plan approvalFile: Revised Plan-Sheet No 5.pdf22 Jul 2025
Building plan approvalFile: Revised Plan-Sheet No 6.pdf22 Jul 2025
Building plan approvalFile: Revised Plan-Sheet No 7.pdf22 Jul 2025
Building plan approvalFile: Revised Plan-Sheet No 8.pdf22 Jul 2025
Withdrawal Update Form 1File: Form-1- 30-06-2025.pdf22 Jul 2025
Withdrawal Update Form 2File: Form 2 -30-06-2025.pdf22 Jul 2025
Withdrawal Update Form 3File: CA Certificate_June 2025.pdf22 Jul 2025
Form 1File: Form 1_March 25.pdf21 Jul 2025
Form 2File: Form 2_March 25.pdf21 Jul 2025
Form 3File: Form 3_March 25.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_March 25.pdf21 Jul 2025
Proforma of Agreement for saleFile: AFS_Tathastu Phase II.pdf25 Mar 2025
Copy of the legal title reportFile: Title Report.pdf6 Feb 2025
Other - FinanceFile: Declaration cum undertaking for no sale_page-0001.pdf6 Feb 2025
Other - LegalFile: 2.pdf30 Jan 2025
Other - LegalFile: Declaration - CTS number and plot area.pdf30 Jan 2025
Other - LegalFile: POA-1-23_compressed.pdf30 Jan 2025
Other - LegalFile: Sale Deed -29-56.pdf30 Jan 2025
Other - LegalFile: Sale Deed -1-28.pdf30 Jan 2025
Other - LegalFile: POA-24-46_compressed.pdf30 Jan 2025
Other - FinanceFile: Declaration - landowners.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Tathastu Phase II Signed.pdf22 Jan 2025
Other - TechnicalFile: Declaration of One Plot One Registration- Tathastu Phase II.pdf22 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS.pdf22 Jan 2025
Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf22 Jan 2025
Layout approvalFile: 2.pdf21 Jan 2025
Building plan approvalFile: 1.pdf21 Jan 2025
Building plan approvalFile: 2.pdf21 Jan 2025
Building plan approvalFile: 3.pdf21 Jan 2025
Building plan approvalFile: 4.pdf21 Jan 2025
Building plan approvalFile: 5.pdf21 Jan 2025
PAN CardFile: PAN Card.pdf21 Jan 2025
Details of encumbrances concerned to FinanceFile: No Encumbance Of Legal.pdf21 Jan 2025
Details of encumbrances concerned to FinanceFile: No Encumbance Of Finanace.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: 2.pdf21 Jan 2025
Proforma of Allotment letterFile: Allotment Letter.pdf21 Jan 2025
Declaration in FORM BFile: Developer Form B - converted.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 2.pdf21 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf21 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf21 Jan 2025
Declaration about Commencement CertificateFile: Format D Comencement.pdf21 Jan 2025
CERSAI detailsFile: CERSAI.pdf21 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - converted.pdf21 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf21 Jan 2025
Details of encumbrances concerned to LegalFile: No Encumbance Of Legal.pdf21 Jan 2025
Details of encumbrances concerned to LegalFile: No Encumbance Of Finanace.pdf21 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosers of Interest.pdf21 Jan 2025

How this compares with Pune

5%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tathastu Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Haveli, Pune13,700+ in Pune

2 kmTathastu Phase IICompleted 50Lapsed / revoked 29Other 96Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: SHREE UMIYA BUILDCON

SHREE UMIYA BUILDCON has 4 registrations on MahaRERA, including DATTA VIHAR and TATHASTU PHASE-I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Tathastu Phase II is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tathastu Phase II?

The registered promoter entity is SHREE UMIYA BUILDCON, a partnership as per the filing. Its GSTIN 27ACSFS7471B1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tathastu Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tathastu Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tathastu Phase II?

The professionals named in the filing: Architect: Precision Architects & Planner; Engineer: Arrow Structural Consultants; Engineer: Manoj Gopinath Shinde; Chartered Accountant: R H Pothiwal & Associates; Chartered Accountant: Pravin Pise & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tathastu Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tathastu Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tathastu Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.