ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Tapovan

Registered No litigation declared Mixed project

Tapovan

By Life Spaces Realty

RG-MH-41210 · RERA PM1260002501333 · Last updated on MahaRERA portal: 26 Oct 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • No extension sought by the promoter; the date moved only under MahaRERA's automatic 4-month extension
  • No encumbrance on the project land
  • Separate project account declared

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months by MahaRERA order
1 of 9Construction stages donefurthest along: Basement (if any), 90%
40 of 45Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

Tapovan is a Mixed project by Life Spaces Realty in Pune, Maharashtra, registered with MahaRERA as PM1260002501333 on 27 Oct 2025. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months under MahaRERA's automatic 4-month extension for the West Asia conflict, which the promoter did not apply for. 5 of the 45 units on this registration are recorded sold or booked, and 1 of 9 construction stages are filed complete.

At a glance

Project

  • NameTapovan
  • TypeMixed
  • Location
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1260002501333
  • ReraGenie IDRG-MH-41210

Builder

  • NameLife Spaces Realty
  • Entity typePartnership
  • GSTIN27AALFL8026C1ZC
  • PartnersKunal Vilas Vedepatil, Nandkumar Babanrao Katkar, Vishal Ramchandra Gund, Pradeep Thakur

Key dates

this monthRegisteredOct 2025First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2025
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed29 files

Current status

11%5 of 45 units booked
28.3%Work done, per cost certificate

Figures as on 26 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Building NA7536945

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 9 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

A Building: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)Not applicable
Plinth90%
Stilt FloorNot applicable
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed231

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots231
Stilt / Ground60
Basement171

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,810 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Sep 2025
LandownerVillageDistrict
Kishor Himmat SasteMoshiPune
Swati Kishor SasteMoshiPune
Gayatri Kishor SasteMoshiPune
Shriraj Kishor SasteMoshiPune
Archana Tushar DeshmukhChakan (CT)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchawad Municipal Corporation
Permissible FSI3925.68
Proposed, not sanctioned3,896 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Navkar Avenue, Survey. No.5, NDA Road, Bavdhan, Pune Maharashtra.411021
Estimated costRs 21.00 cr
Cost incurredRs 5.94 cr
Work done28.28%
BuildingWingEstimatedIncurred
A BuildingNARs 19.80 crRs 5.94 cr
-NARs 1.20 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahendra Thankur
EngineerPrasad Padmakar Belekar
EngineerBhimrav Baban Lahane
EngineerAniket Narendra Bharde
Chartered AccountantAghav wavhal & Associates
Chartered AccountantHiten Gujarathi and Associates
PartnerRole in project
Life Spaces Realty-

Extensions1

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Dec 2028 → Apr 2029

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Aug 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: FORM 5 RERA (1).pdf26 Oct 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate (7).pdf16 Oct 2026
Withdrawal Update Form 2File: form 2 (6) (1).pdf16 Oct 2026
Withdrawal Update Form 3File: life space realty from 3_compressed.pdf16 Oct 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate (7).pdf15 Oct 2026
Withdrawal Update Form 2File: form 2 (6) (1).pdf15 Oct 2026
Withdrawal Update Form 3File: life space realty from 3_compressed.pdf15 Oct 2026
Withdrawal Update Form 1File: Form 1 Tapovan.pdf20 Aug 2026
Withdrawal Update Form 2File: Main Form 2 (1) (1).pdf20 Aug 2026
Withdrawal Update Form 3File: Form 3 (6).pdf20 Aug 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf27 Jul 2026
Withdrawal Update Form 2File: Form 2 March 26.pdf27 Jul 2026
Withdrawal Update Form 3File: March CA certificate (1).pdf27 Jul 2026
Form 2A (FY 2026-2027)File: Form 2A 2026-2027 Tapovan.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: 2 (1).pdf24 Mar 2026
Withdrawal Update Form 1File: From 01 Tapovan.pdf21 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate Tapovan.pdf21 Mar 2026
Withdrawal Update Form 3File: TAPOVAN FORM 3.pdf21 Mar 2026
Declaration and undertaking (Annexure A)File: Annuxere A Order Nu 50 (1).pdf24 Sep 2025
Layout approvalFile: Main Layout Tapovan.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-2.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-3_11zon.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-4_11zon.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-5_11zon.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-6_11zon.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-7_11zon.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-8_11zon.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-9.pdf22 Aug 2025
Building plan approvalFile: all plan Tapovan-10.pdf22 Aug 2025

How this compares with Pune

11%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 4 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tapovan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi14,000+ in Pune

2 kmTapovanCompleted 77Lapsed / revoked 39Other 96Dot size: filed unitsN

Filed coordinates, straight-line distance. 212 registered projects within 2 km.

Builder: Life Spaces Realty

Life Spaces Realty has 1 registration on MahaRERA, including Tapovan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Tapovan is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tapovan?

The registered promoter entity is Life Spaces Realty, a partnership as per the filing. Its GSTIN 27AALFL8026C1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tapovan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tapovan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tapovan?

The professionals named in the filing: Architect: Mahendra Thankur; Engineer: Prasad Padmakar Belekar; Engineer: Bhimrav Baban Lahane; Engineer: Aniket Narendra Bharde; Chartered Accountant: Aghav wavhal & Associates; Chartered Accountant: Hiten Gujarathi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tapovan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tapovan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tapovan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.