ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R

Registered No litigation declared Residential / Group Housing project

TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R

By RAJVAN LIFESPACES LLP

RG-MH-06212 · RERA P99000055111 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
24 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 50%
19 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R is a Residential / Group Housing project by RAJVAN LIFESPACES LLP in Palghar, Maharashtra, registered with MahaRERA as P99000055111 on 4 Mar 2024. Possession is promised by 31 Dec 2027. 17 of the 36 units on this registration are recorded sold or booked, and 24 of 33 construction stages are filed complete.

At a glance

Project

  • NameTANISHQ TYPE G-5,E-5,F-5 WING P,Q,R
  • TypeResidential / Group Housing
  • Location
    • VANGAON ROAD
    • VANGAON
    • Dahanu
    • Palghar
    • 401103
  • Pincode401103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000055111
  • ReraGenie IDRG-MH-06212

Builder

  • NameRAJVAN LIFESPACES LLP
  • Entity typePartnership
  • PartnerAmi Hasmukhlal Shah
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredMar 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Mar 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed71 files

Current status

47%17 of 36 units booked
81.5%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE-G5, WING-PNA3312012
TYPE-E5, WING-QNA3312012
TYPE F-5, WING-RNA3312012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

TYPE-G5, WING-P77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE-E5, WING-Q77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE F-5, WING-R77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30
BuildingClosed/CoveredTotal
TYPE-G5, WING-P1010
TYPE-E5, WING-Q1010
TYPE F-5, WING-R1010

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,569 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 May 2025
LandownerVillageDistrict
RAJNIKANT PURSHOTTAM SHROFFMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI1923.88
Proposed, not sanctioned1,924 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVANGAON,BOISAR WEST ,401103
Estimated costRs 4.45 cr
Cost incurredRs 3.63 cr
Work done81.52%
BuildingWingEstimatedIncurred
TYPE-E5, WING-QNARs 1.49 crRs 1.27 cr
TYPE-G5, WING-PNARs 1.33 crRs 1.13 cr
TYPE F-5, WING-RNARs 1.33 crRs 1.13 cr
-NARs 30.00 lakhRs 10.00 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREATIVE ASSOCIATES
EngineerCENTRELINE CONSULTANTS AND ENGINEERS
Chartered AccountantSUJOY P MEHTA AND ASSOCIATES
Chartered AccountantSPBM & Co
Chartered AccountantMAYANK H SHAH & CO.
PartnerRole in project
RAJVAN LIFESPACES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: PQR FORM 1 ARCHITECT CERTIFICATE.pdf18 Apr 2026
Withdrawal Update Form 2File: PQR FORM 2.pdf18 Apr 2026
Withdrawal Update Form 3File: PQR Withdrawal Application Form3 SIGNED.pdf18 Apr 2026
Withdrawal Update Form 1File: PQR-FORM 1 ARCHITECT CERTIFICATE.pdf27 Jan 2026
Withdrawal Update Form 2File: PQR-FORM 2 ENGINEER CERTIFICATE.pdf27 Jan 2026
Withdrawal Update Form 3File: PQR FORM-3 SIGNED.pdf27 Jan 2026
Withdrawal Update Form 1File: FORM 1.pdf10 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf10 Oct 2025
Withdrawal Update Form 3File: Form-3.pdf10 Oct 2025
Form 2A (FY 2024-2025)File: PQR FORM 2A (2024-2025).pdf4 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 PQR Signed (1).pdf1 Oct 2025
Form 1File: PQR FORM 1 31 Dec 2024.pdf11 Jun 2025
Form 2File: PQR FORM 2 31 Dec 2024.pdf11 Jun 2025
Form 3File: PQR FORM 3 AS ON 31 DEC 2024.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: PQR SOLD UNSOLD AS ON 31 DEC 2024.pdf11 Jun 2025
Form 1File: PQR FORM 1 30 Sep 2024.pdf11 Jun 2025
Form 2File: PQR FORM 2 130 Sep 2024.pdf11 Jun 2025
Form 3File: PQR FORM 3 AS ON 30 sep 2024.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: PQR SOLD UNSOLD AS ON 30 SEP 2024.pdf11 Jun 2025
Form 1File: FORM 1 ARCHI.pdf20 May 2025
Form 2File: FORM 2 ENGINE.pdf20 May 2025
Form 3File: Rajvan LLP Form 3.pdf20 May 2025
Disclosure of Sold and Booked InventoryFile: TYPE G5 E5 F5 WING P Q R SOLD UNSOLD (1).pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rajvan LLP T GEF 5 PQR - RERA Cert 2 Form 3 31March2025 (Tanishq) Draft.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 1 ARCHITECT CERTIFICATE.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: TYPE G5 E5 F5 WING P Q R SOLD UNSOLD_compressed.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE WITH STAMP AND SIGN.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE WITH STAMP AND SIGN.pdf2 Aug 2024
Copy of the legal title reportFile: ilovepdf_merged rajvan explanation.pdf17 Feb 2024
Other - LegalFile: ilovepdf_merged rajvan explanation.pdf17 Feb 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (16) (1).pdf18 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Rajvan Query 0224.pdf2 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) (4).pdf2 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Declaration about Commencement Certificate (3).pdf20 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 2 Declaration about Commencement Certificate.pdf20 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: highlighted TANISHQ A,B,C Collector OC.pdf11 Dec 2023
Other - TechnicalFile: highlighted TANISHQ A,B,C Collector OC.pdf11 Dec 2023
Declaration about Commencement CertificateFile: Declaration CC NEW.pdf21 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: PLINTH COMPLITION G-5, E-5, F-5.pdf2 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: S R No.pdf2 Nov 2023
Copy of the legal title reportFile: TITLE CERTIFICATE-3-7.pdf9 Oct 2023
Details of encumbrances concerned to FinanceFile: Declaration Finance encumbrances.pdf26 Sep 2023
Details of encumbrances concerned to FinanceFile: Declaration legal encumbrances.pdf26 Sep 2023
Details of encumbrances concerned to LegalFile: Declaration Finance encumbrances.pdf26 Sep 2023
Details of encumbrances concerned to LegalFile: Declaration legal encumbrances.pdf26 Sep 2023
CERSAI detailsFile: Declaration Cersai.pdf26 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other rera estate organizations - Ami Shah.pdf26 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other rera estate organizations - Parshva Shah.pdf26 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA Bank Ac Declaration.pdf26 Sep 2023
Deviation Report with respect to Allotment letterFile: Declaration allotment deviation report.pdf26 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Declaration agreement deviation report.pdf26 Sep 2023
Other - TechnicalFile: Plot Area Declaration (1).pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 rajvan e-5f-5g-5.pdf23 Aug 2023
Declaration in FORM BFile: Developer Declaration (on stamp paper).pdf16 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf18 Jul 2023
Layout approvalFile: LAYOUT_compressed.pdf6 Jul 2023
Building plan approvalFile: 1 Building Plan Approval E-5.pdf6 Jul 2023
Building plan approvalFile: 2 Building Plan Approval F-5.pdf6 Jul 2023
Building plan approvalFile: 3 Building Plan Approval G-5.pdf6 Jul 2023
Copy of Layout Approval (in case of layout)File: LAYOUT_compressed.pdf6 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval E-5.pdf6 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval F-5.pdf6 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: 3 Building Plan Approval G-5.pdf6 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf6 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tanishq Type G5 E5 F5 Engineer Certificate (1).pdf6 Jul 2023
Proforma of Allotment letterFile: Allottement Letter As Per RERA_compressed.pdf29 Jun 2023
PAN CardFile: RAJVAN PANCARD.pdf26 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf26 Jun 2023

How this compares with Palghar

47%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VANGAON3,200+ in Palghar

2 kmTANISHQ TYPE G-5,E-5,F-5Completed 3Lapsed / revoked 1Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: RAJVAN LIFESPACES LLP

RAJVAN LIFESPACES LLP has 4 registrations on MahaRERA, including RAJVAN LIFESPACES LLP -TANISHQ GOLD C WING and TANISHQ TYPE G-3,E-3,F-3 WING J,K,L. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R?

The registered promoter entity is RAJVAN LIFESPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R?

The professionals named in the filing: Architect: CREATIVE ASSOCIATES; Engineer: CENTRELINE CONSULTANTS AND ENGINEERS; Chartered Accountant: SUJOY P MEHTA AND ASSOCIATES; Chartered Accountant: SPBM & Co; Chartered Accountant: MAYANK H SHAH & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TANISHQ TYPE G-5,E-5,F-5 WING P,Q,R to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.