Home / Browse projects / Palghar, Maharashtra / SAMYA ONE

Registered No litigation declared Others project

SAMYA ONE

By PRIMEVILLE DEVELOPERS LLP

RG-MH-37735 · RERA P99000080898 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 10%
19 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 149 documents Report an error

SAMYA ONE is a Others project by PRIMEVILLE DEVELOPERS LLP in Palghar, Maharashtra, registered with MahaRERA as P99000080898 on 1 Aug 2025. Possession is promised by 31 Dec 2028. 0 of the 19 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAMYA ONE
  • TypeOthers
  • Location
    • VANGAON
    • Dahanu
    • Palghar
    • 401103
  • Pincode401103
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000080898
  • ReraGenie IDRG-MH-37735

Builder

  • NamePRIMEVILLE DEVELOPERS LLP
  • Entity typeLimited Liability Partnership
  • LLPINABD-0618
  • GSTIN27ABDFP2039C1ZL
  • PartnerVISHAL ANANTRAY PAREKH
  • PartnersNAVIN BHUPATRAI PAREKH, PUNEET JOGESH MEHRA
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Aug 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed149 files

Current status

0%0 of 19 units booked
32.0%Work done, per cost certificate

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAMYA ONENA5414519

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 10%.

SAMYA ONE: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area923 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCOLLECTOR OFFICE PALGHAR
Permissible FSI2420.98
Proposed, not sanctioned921 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLATE SSTSTRBLDG1ST FLOOR VANGA THANE MAHARASHTRA 401103
Estimated costRs 3.06 cr
Cost incurredRs 97.92 lakh
Work done32.05%
BuildingWingEstimatedIncurred
SAMYA ONENARs 2.75 crRs 96.42 lakh
-NARs 30.00 lakhRs 1.50 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREATIVE ASSOCIATES
EngineerCENTRELINE ENGINEERS AND CONSULTANTS
Chartered AccountantSPBM & CO
Chartered AccountantSUJOY P MEHTA AND ASSOCIATES
PartnerRole in project
PRIMEVILLE DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jul 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed149

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 UPTO 31ST MAR 2026 SAMYA ONE.pdf28 Apr 2026
Withdrawal Update Form 2File: FORM 2 SAMYA ONE AS ON 31ST MAR 2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 RERA SAMYA ONE.pdf28 Apr 2026
Withdrawal Update Form 1File: FORM 1 Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 1File: FORM 1 Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 2File: FORM 2 Sep 2025.pdf28 Feb 2026
Withdrawal Update Form 2File: Form-2 Dec 2025.pdf28 Feb 2026
Withdrawal Update Form 3File: Form-3.pdf28 Feb 2026
Withdrawal Update Form 3File: Form-3.pdf28 Feb 2026
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (6) (1).pdf17 Jul 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (6) (1).pdf17 Jul 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (6) (1).pdf17 Jul 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (6) (1).pdf17 Jul 2025
Copy of the legal title reportFile: Title search vng plot 6.pdf10 Jul 2025
Copy of the legal title reportFile: Title search vng plot 07.pdf10 Jul 2025
Copy of the legal title reportFile: Title search vng plot 6.pdf10 Jul 2025
Copy of the legal title reportFile: Title search vng plot 07.pdf10 Jul 2025
Copy of the legal title reportFile: Title search vng plot 6.pdf10 Jul 2025
Copy of the legal title reportFile: Title search vng plot 07.pdf10 Jul 2025
Copy of the legal title reportFile: Title search vng plot 6.pdf10 Jul 2025
Copy of the legal title reportFile: Title search vng plot 07.pdf10 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Primeville LLP Samya One - Form 3 RERA Cert 1 Form 29 April 2025 signed (1).pdf4 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Primeville LLP Samya One - Form 3 RERA Cert 1 Form 29 April 2025 signed (1).pdf4 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Primeville LLP Samya One - Form 3 RERA Cert 1 Form 29 April 2025 signed (1).pdf4 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Primeville LLP Samya One - Form 3 RERA Cert 1 Form 29 April 2025 signed (1).pdf4 Jun 2025
Layout approvalFile: Layout Plan Compressed.pdf3 May 2025
Building plan approvalFile: Layout Plan Compressed.pdf3 May 2025
Layout approvalFile: Layout Plan Compressed.pdf3 May 2025
Building plan approvalFile: Layout Plan Compressed.pdf3 May 2025
Layout approvalFile: Layout Plan Compressed.pdf3 May 2025
Building plan approvalFile: Layout Plan Compressed.pdf3 May 2025
Layout approvalFile: Layout Plan Compressed.pdf3 May 2025
Building plan approvalFile: Layout Plan Compressed.pdf3 May 2025
Details of encumbrances concerned to FinanceFile: Declaration for finance_page-0001.pdf3 May 2025
Details of encumbrances concerned to FinanceFile: (Declaration legal encumbrances concerned )_page-0001.pdf3 May 2025
Copy of Layout Approval (in case of layout)File: Layout Plan Compressed.pdf3 May 2025
Proforma of Allotment letterFile: draft allotment new formate_page-0001.pdf3 May 2025
Declaration in FORM BFile: 500 rsotarised declaration.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM-1 New.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2(new).pdf3 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan Compressed.pdf3 May 2025
Other - LegalFile: 45 3 7 Deed_1.pdf3 May 2025
Other - LegalFile: 45 3 7 Deed_2.pdf3 May 2025
Other - LegalFile: 45 3 6 Deed_1.pdf3 May 2025
Other - LegalFile: Primeville developers LLP Agreement.pdf3 May 2025
Other - LegalFile: 45 3 6 Deed_2.pdf3 May 2025
Declaration about Commencement CertificateFile: formate D ( Declaration cc)_page-0001.pdf3 May 2025
CERSAI detailsFile: Declaration cersai_page-0001.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: format A (Declarartion about bank)_page-0001.pdf3 May 2025
Deviation Report with respect to Allotment letterFile: declaration allottment Deviation Report_page-0001.pdf3 May 2025
Details of encumbrances concerned to LegalFile: Declaration for finance_page-0001.pdf3 May 2025
Details of encumbrances concerned to LegalFile: (Declaration legal encumbrances concerned )_page-0001.pdf3 May 2025
Other - TechnicalFile: Gmail - CC Issued by Collector Palghar at village Vangaon Taluka Dhanu Dist Palghar Ser No3 May 2025
Other - TechnicalFile: ANNEXURE-A -Declaration cum undertaking for no duplicate registration.pdf3 May 2025
Deviation Report with respect to model copy of AgreementFile: Declaration agreement deviation report_page-0001.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: (Disclousure of Interest) puneet_page-0001.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest (Navin)_page-0001.pdf3 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest (vishal)_page-0001.pdf3 May 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B.pdf3 May 2025
Disclosure for secured/unsecured finance availed for the projectFile: disclosure for secured or unsecured finance_page-0001.pdf3 May 2025
Details of encumbrances concerned to FinanceFile: Declaration for finance_page-0001.pdf3 May 2025
Details of encumbrances concerned to FinanceFile: (Declaration legal encumbrances concerned )_page-0001.pdf3 May 2025
Copy of Layout Approval (in case of layout)File: Layout Plan Compressed.pdf3 May 2025
Proforma of Allotment letterFile: draft allotment new formate_page-0001.pdf3 May 2025
Declaration in FORM BFile: 500 rsotarised declaration.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: fORM-1 New.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2(new).pdf3 May 2025
Building Plan Approval / NA Order for plotted developmentFile: Layout Plan Compressed.pdf3 May 2025
Other - LegalFile: 45 3 7 Deed_1.pdf3 May 2025
Other - LegalFile: 45 3 7 Deed_2.pdf3 May 2025
Other - LegalFile: 45 3 6 Deed_1.pdf3 May 2025
Other - LegalFile: Primeville developers LLP Agreement.pdf3 May 2025
Other - LegalFile: 45 3 6 Deed_2.pdf3 May 2025
Declaration about Commencement CertificateFile: formate D ( Declaration cc)_page-0001.pdf3 May 2025
CERSAI detailsFile: Declaration cersai_page-0001.pdf3 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: format A (Declarartion about bank)_page-0001.pdf3 May 2025
Deviation Report with respect to Allotment letterFile: declaration allottment Deviation Report_page-0001.pdf3 May 2025
Details of encumbrances concerned to LegalFile: Declaration for finance_page-0001.pdf3 May 2025
Details of encumbrances concerned to LegalFile: (Declaration legal encumbrances concerned )_page-0001.pdf3 May 2025
Other - TechnicalFile: Gmail - CC Issued by Collector Palghar at village Vangaon Taluka Dhanu Dist Palghar Ser No3 May 2025

How this compares with Palghar

0%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMYA ONE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VANGAON3,200+ in Palghar

2 kmSAMYA ONECompleted 3Lapsed / revoked 1Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: PRIMEVILLE DEVELOPERS LLP

PRIMEVILLE DEVELOPERS LLP has 2 registrations on MahaRERA, including PRIME ONE and SAMYA ONE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if SAMYA ONE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMYA ONE?

The registered promoter entity is PRIMEVILLE DEVELOPERS LLP, a limited liability partnership as per the filing. Its LLPIN ABD-0618 and GSTIN 27ABDFP2039C1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMYA ONE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAMYA ONE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMYA ONE?

The professionals named in the filing: Architect: CREATIVE ASSOCIATES; Engineer: CENTRELINE ENGINEERS AND CONSULTANTS; Chartered Accountant: SPBM & CO; Chartered Accountant: SUJOY P MEHTA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMYA ONE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMYA ONE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMYA ONE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.