Home / Browse projects / Pune, Maharashtra / Raahee Parna

Registered No litigation declared Residential / Group Housing project

Raahee Parna

By Raahee Platinum

RG-MH-56519 · RERA PR1260002602355 · Last updated on MahaRERA portal: 15 Oct 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
0 of 70Construction stages doneacross 7 buildings; furthest along: Excavation, 0%
678 of 678Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 26 documents Report an error

Raahee Parna is a Residential / Group Housing project by Raahee Platinum in Pune, Maharashtra, registered with MahaRERA as PR1260002602355 on 16 Oct 2026. Possession is promised by 31 Dec 2031. 0 of the 678 units on this registration are recorded sold or booked, and 0 of 70 construction stages are filed complete.

At a glance

Project

  • NameRaahee Parna
  • TypeResidential / Group Housing
  • Location
    • Riverside New DP Road
    • Dudulgaon
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002602355
  • ReraGenie IDRG-MH-56519

Builder

  • NameRaahee Platinum
  • Entity typePartnership
  • GSTIN27ABIFR3243D1ZC
  • PartnersAbhijit Vishwanath Thakur, Devendra Murlidhar Murkute, Suumit Vitthal Deokar

Key dates

this monthRegisteredOct 2026PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2026
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings7 building records
  • Documents filed26 files

Current status

0%0 of 678 units booked

Figures as on 15 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA161456056
B BuildingNA16141240124
C Building NA16141240124
D BuildingNA16141660166
E BuildingNA161456056
F Building NA161456056
G BuildingNA161496096

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 70 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 0%.

A Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G Building0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNo0%

Parking filed1407

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,407
Stilt / Ground542
Basement548
Stack Parking317
BuildingStilt / GroundBasementStack ParkingTotal
A Building808047207
B Building777845200
C Building777845200
D Building777845200
E Building777845200
F Building777845200
G Building777845200

Land and ownership35

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area14,521 sq m
Land owned byNot the promoter
Named landowners35
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Oct 2026
LandownerVillageDistrict
Kundlik Damu ChorgheDudulgaonPune
Narayna Damodar ChorgheDudulgaonPune
Shantaram Damodar ChorgheDudulgaonPune
Rajendra Mahadeo ChorgheDudulgaonPune
Sundarbai Bhausaheb ThakurDudulgaonPune
Shobha Prakash JagtapDudulgaonPune
Veena Bharat ShendkarDudulgaonPune
Lata Kundlik ChorgheDudulgaonPune
Smita Dattatray LokhandeDudulgaonPune
Nita Kaluram SawantDudulgaonPune
Gauri Dipak KalateDudulgaonPune
Akshata Sunil TanpureDudulgaonPune
Sulekha Ajay GawadeDudulgaonPune
Nisha Akash BhalekarDudulgaonPune
Sunanda Narayan ChorgheDudulgaonPune
Nitin Narayan ChorgheDudulgaonPune
Vaishali Rajesh JachakDudulgaonPune
Rohini Jitendra KarleDudulgaonPune
Ashwini Sanjay CharhateDudulgaonPune
Nanda Shantaram ChorgheDudulgaonPune
Ramesh Shantaram ChorgheDudulgaonPune
Sangita Ramesh ChorgheDudulgaonPune
Umesh Shantaram ChorgheDudulgaonPune
Dipali Ramesh ChorgheDudulgaonPune
Swati Sambhaji MoreDudulgaonPune
Sarika Sudhir GaikwadDudulgaonPune
Sarika Rajendra ChorgheDudulgaonPune
Yash Rajendra ChorgheDudulgaonPune
Vaishnavi Rajendra ChorgheDudulgaonPune
Prathamesh Nitin ChorgheDudulgaonPune
Devika Nitin ChorgheDudulgaonPune
Swara Ramesh ChorgheDudulgaonPune
Sairaj Ramesh ChorgheDudulgaonPune
Durvesh Ramesh ChorgheDudulgaonPune
Chaitanya Umesh ChorgheDudulgaonPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI59113.0
Proposed, not sanctioned59,112 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 7, Silvana County, S. No. 133/1, Alandi Road, Alandi, Pune, Maharashtra.412105

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShankar Nimbalkar
Chartered AccountantPravin E Pise
PartnerRole in project
Raahee Platinum-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Oct 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed26

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Plan 14-23_compressed.pdf15 Oct 2026
Building plan approvalFile: Plan 13-23_compressed.pdf15 Oct 2026
Declaration and undertaking (Annexure A)File: One Plot one registration.pdf12 Oct 2026
Layout approvalFile: HPSC1190_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 1-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 2-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 3-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 4-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 5-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 6-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 7-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 8-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 9-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 10-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 10-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 11-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 12-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 15-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 16-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 17-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 18-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 19-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 20-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 21-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 22-23_compressed.pdf5 Oct 2026
Building plan approvalFile: Plan 23-23_compressed.pdf5 Oct 2026

How this compares with Pune

0%of this project is bookeddistrict median 30%
27%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,800+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Raahee Parna on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dudulgaon13,800+ in Pune

2 kmRaahee ParnaCompleted 37Lapsed / revoked 18Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 111 registered projects within 2 km.

Builder: Raahee Platinum

Raahee Platinum has 1 registration on MahaRERA, including Raahee Parna. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Raahee Parna is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Raahee Parna?

The registered promoter entity is Raahee Platinum, a partnership as per the filing. Its GSTIN 27ABIFR3243D1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Raahee Parna?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Raahee Parna?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Raahee Parna?

The professionals named in the filing: Architect: Shankar Nimbalkar; Chartered Accountant: Pravin E Pise. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Raahee Parna?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Raahee Parna. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Raahee Parna to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.