Home / Browse projects / Sangli, Maharashtra / Taksh Residency
Taksh Residency
RG-MH-83437 · RERA P53100049718 · Last updated on MahaRERA portal: 18 Apr 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Taksh Residency is a Others project by Madhusamruddhi Associates in Sangli, Maharashtra, registered with MahaRERA as P53100049718 on 22 Feb 2023. The registration is recorded completed; possession was promised by 20 Dec 2025.
At a glance
Project
- NameTaksh Residency
- TypeOthers
- Location
- Government colony - Hasni Ashram Road
- Mahalaxmi Chowk
- Sangli Miraj Kupwad (M Corp.)
- Miraj
- Sangli
- 416415
- Pincode416415
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100049718
- ReraGenie IDRG-MH-83437
Builder
- NameMadhusamruddhi Associates
- Entity typePartnership
- GSTIN27ABSFM8357M1Z7
- PartnerPravin Chavagonda Chougule
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Feb 2023
- Promised completion20 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TAKSH RESIDENCY | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
TAKSH RESIDENCY: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Suryakant Sharad Gambhir HUF | Yelavi | Sangli |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SACHIN G KANOJE |
| Engineer | NANDKUMAR K PATIL |
| Chartered Accountant | UTTAM PAWAR |
| Partner | Role in project |
|---|---|
| Madhusamruddhi Associates | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Apr 2025
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: DRAWING NEW.pdf | 18 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: DRAWING NEW.pdf | 18 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC TAKSH RESIDENCY.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE ARCH.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPT ARCH.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC ARCH.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE CA.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT CA.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC CA.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE ENGG.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPT ENGG.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC ENGG.pdf | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: JUNE INVENTORY.pdf | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SEPT INVENTORY.pdf | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DEC INVENTORY.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE ARCH.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPT ARCH.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC ARCH.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE CA.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT CA.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC CA.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE ENGG.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPT ENGG.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC ENGG.pdf | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: JUNE INVENTORY.pdf | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SEPT INVENTORY.pdf | 13 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DEC INVENTORY.pdf | 13 Feb 2025 |
| Other - FinanceFile: updated ac.pdf | 10 Dec 2024 |
| Other - FinanceFile: updated ac.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch cert q1.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cert q1.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT Q1.pdf | 9 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure q1.pdf | 9 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert q1_compressed (1).pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cert.pdf | 18 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca cert_compressed (1).pdf | 18 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca cert 311223_compressed.pdf | 15 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch cert.pdf | 9 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 9 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf | 24 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arcitect.pdf | 9 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg cert.pdf | 9 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert compressed.pdf | 9 Oct 2023 |
| Other - TechnicalFile: plinth cert.pdf | 2 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT Q1.pdf | 28 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT Q1.pdf | 28 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Q1_compressed.pdf | 28 Apr 2023 |
| Layout approvalFile: nakasha.pdf | 31 Dec 2022 |
| Building plan approvalFile: mun dwg1.pdf | 31 Dec 2022 |
| PAN CardFile: PAN CARD1.pdf | 31 Dec 2022 |
| Copy of the legal title reportFile: SEARCH REPORT PLOT NO 30.pdf | 31 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: encumbrance certificate.pdf | 31 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: encumbrance certificate legal.pdf | 31 Dec 2022 |
| Details of encumbrances concerned to LegalFile: encumbrance certificate.pdf | 31 Dec 2022 |
| Details of encumbrances concerned to LegalFile: encumbrance certificate legal.pdf | 31 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: nakasha.pdf | 31 Dec 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: mun dwg1.pdf | 31 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement cert1.pdf | 31 Dec 2022 |
| Declaration about Commencement CertificateFile: DCC NEW.pdf | 31 Dec 2022 |
| Declaration in FORM BFile: form b.pdf | 31 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 31 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate1.pdf | 31 Dec 2022 |
| CERSAI detailsFile: cersai1.pdf | 31 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: c a certificate new.pdf | 31 Dec 2022 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: order no 39-2.pdf | 31 Dec 2022 |
| Proforma of Allotment letterFile: model form of allotment letter.pdf | 31 Dec 2022 |
| Proforma of Agreement for saleFile: agreement format.pdf | 31 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seprate bank.pdf | 31 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: certificate.pdf | 31 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: model agreement for sale is no any deviation.pdf | 31 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
Keep Taksh Residency on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mahalaxmi Chowk790+ in Sangli
Filed coordinates, straight-line distance. 111 registered projects within 2 km.
SHIV SAI VANDANA
S P BUILDER
Purva Heights
Kotibhaskar Builders
SHRI KRUPA ICON
TATYASAHEB SAMBHAJI KHOT
VAJE BUSINESS SQAURE
V D VAJE DEVELOPERS
KALESHWAR PRIDE
PRADEEP SHRIDHAR PHADKE
SAICHARAN HEIGHTS
ASHTANG DEVELOPERS
See every Sangli project, with the district possession charts
Builder: Madhusamruddhi Associates
Madhusamruddhi Associates has 1 registration on MahaRERA, including Taksh Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if Taksh Residency is delayed beyond 20 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Taksh Residency?
The registered promoter entity is Madhusamruddhi Associates, a partnership as per the filing. Its GSTIN 27ABSFM8357M1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Taksh Residency?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Taksh Residency?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Taksh Residency?
The professionals named in the filing: Architect: SACHIN G KANOJE; Engineer: NANDKUMAR K PATIL; Chartered Accountant: UTTAM PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Taksh Residency?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback