ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / Tabeer Spaces

Completed No litigation declared Others project

Tabeer Spaces

By Tabeer Properties

RG-MH-05065 · RERA P51600023179 · Last updated on MahaRERA portal: 18 Feb 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Tabeer Spaces is a Others project by Tabeer Properties in Nashik, Maharashtra, registered with MahaRERA as P51600023179 on 5 Dec 2019. The registration is recorded completed; possession was promised by 30 Dec 2025.

At a glance

Project

  • NameTabeer Spaces
  • TypeOthers
  • Location
    • Pakhal Road
    • Royal Colony
    • Nashik (M Corp.)
    • Nashik
    • 422006
  • Pincode422006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600023179
  • ReraGenie IDRG-MH-05065

Builder

  • NameTabeer Properties
  • Entity typePartnership
  • PartnersGulam Mustafa Tabeerali Chaudhary, Shaida Husain Tabeerali Chaudhary, Gulam Husain Tabeerali Chaudhary
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2019PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Dec 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tabeer SpacesNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Tabeer Spaces: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered34
Open Space28

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,257 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5147.87
Proposed, not sanctioned3,946 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch201 Patel Retreat, Off College Road Nashik 422005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Darshan P Sancheti
EngineerEr Sudarshankumar A Anawade
Chartered AccountantBhushan Gosar & Associates
PartnerRole in project
Tabeer Properties-

Litigation declared1

CaseCourtStatus
94/2020/2020Civil Judge Senior Division NashikPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Feb 2023

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: 11-40_merged_compressed.pdf18 Feb 2024
Status of ConveyanceFile: 41-58_merged_compressed.pdf18 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 and Completion Certificate.pdf6 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf6 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Completion Certificate.pdf6 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Tabeer Spaces.pdf14 Feb 2023
Status of ConveyanceFile: Sale Deed Index-Tabeer Spaces Part 2.pdf14 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf13 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032020.pdf18 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30062020.pdf18 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TS Form 2 Q1.pdf18 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: No-9.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 tabeer properties 31-03-22.pdf18 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tabeer Spaces Declaration Page 1.pdf18 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tabeer Spaces Declaration Page 2.pdf18 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tabeer Spaces Declaration Page 3.pdf18 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tabeer Spaces Declaration Page 4.pdf18 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Tabeer Spaces Declaration Page 5.pdf18 Jan 2023
Status of ConveyanceFile: Sale Deed Index-Tabeer Spaces.pdf18 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 tabeer properties 31-03-22.pdf27 Sep 2022
Other - FinanceFile: Form 5 tabeer properties 31-03-22.pdf27 Sep 2022
Other - TechnicalFile: Completion Certificate.pdf31 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TS Form 1 Q1.pdf20 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: TS Form 2 Q1.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: 6-TP Booked inventory 30062022.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TS Form 1 Architect Q4.pdf30 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: TS Form 2.pdf30 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: No-9.pdf30 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TS Form 3 CA Cert.pdf30 Apr 2022
Disclosure of sold/ booked inventoryFile: Inventory.pdf10 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 dt 31122021.pdf31 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 1.pdf24 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2.pdf24 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate 31122021.pdf7 Jan 2022
Disclosure of sold/ booked inventoryFile: 4-TP Booked inventory 31122021.pdf7 Jan 2022
Declaration about Commencement CertificateFile: Declration about commencement.pdf14 Oct 2021
Building plan approvalFile: Building Plan Page 1.pdf6 Oct 2021
Building plan approvalFile: Building Plan Page 2.pdf6 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Page 1.pdf6 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Page 2.pdf6 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement 1MB.pdf6 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers _1MB.pdf6 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: No-8.pdf6 Oct 2021
Disclosure of sold/ booked inventoryFile: 3-TP Booked inventory 30092021.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 tabeer properties 31-03-21.pdf29 Sep 2021
Details of encumbrancesFile: Encumbrances 2.pdf15 Aug 2021
Disclosure of sold/ booked inventoryFile: TP booked inventory 30062021.pdf15 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tabeer Spaces Form 3.pdf15 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Part 2.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: No-3.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: No-4.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: No-5.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 5.pdf26 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 5.pdf26 May 2021
Disclosure of sold/ booked inventoryFile: TP Booked Inventory.pdf26 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2020.pdf22 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March 2020.pdf29 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: June 2020.pdf29 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: September 2020.pdf29 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Tabeer Properties Tabeer Spaces Mar 20.pdf3 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: December 2019.pdf17 Feb 2020
Building plan approvalFile: Building-Plan-page-1.pdf21 Nov 2019
Building plan approvalFile: Building-Plan-page-2.pdf21 Nov 2019
Layout approvalFile: Layout.pdf21 Nov 2019
PAN CardFile: TABEER-PROPERTIES-PAN-CARD.pdf21 Nov 2019
Copy of the legal title reportFile: Title and Search Report.pdf21 Nov 2019
Details of encumbrancesFile: Encumbrances Certificate.pdf21 Nov 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf21 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: Building-Plan-page-1.pdf21 Nov 2019
Building Plan Approval / NA Order for plotted developmentFile: Building-Plan-page-2.pdf21 Nov 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Nov 2019
Declaration in FORM BFile: Form B.pdf21 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf21 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Nov 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Tabeer EnclaveNashik10CompletedJun 2014Late, Oct 2014

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Tabeer Spaces on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Royal Colony4,100+ in Nashik

2 kmTabeer SpacesCompleted 181Lapsed / revoked 47Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 346 registered projects within 2 km.

Builder: Tabeer Properties

Tabeer Properties has 4 registrations on MahaRERA, including Royal Palm and Arsh Residency. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Tabeer Spaces is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Tabeer Spaces?

The registered promoter entity is Tabeer Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Tabeer Spaces?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Tabeer Spaces?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Tabeer Spaces?

The professionals named in the filing: Architect: Ar Darshan P Sancheti; Engineer: Er Sudarshankumar A Anawade; Chartered Accountant: Bhushan Gosar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tabeer Spaces?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tabeer Spaces. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tabeer Spaces to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.