Home / Browse projects / Mumbai Suburban, Maharashtra / Swayambhu Residency

Completed No litigation declared Residential / Group Housing project

Swayambhu Residency

By Yogiraj Builders and Developers

RG-MH-11152 · RERA P51800007303 · Last updated on MahaRERA portal: 19 Apr 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneacross 5 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Swayambhu Residency is a Residential / Group Housing project by Yogiraj Builders and Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800007303 on 17 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2023. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameSwayambhu Residency
  • TypeResidential / Group Housing
  • Location
    • Carter Road 2
    • Chinchpada
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800007303
  • ReraGenie IDRG-MH-11152

Builder

  • NameYogiraj Builders and Developers
  • Entity typePartnership
  • PartnerNemchand Khetshi Dedhia
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseSep 2021Revised toMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion30 Mar 2023
  • Revised completionRevised to 30 Mar 2023 (originally 30 Sep 2021)
  • Buildings5 building records
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Swayambhu ResidencyNA00000
Swayambhu ResidencyNA210000
Swayambhu ResidencyNA210000
Swayambhu ResidencyNA210000
Swayambhu ResidencyNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 19 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete across 5 buildings.

Swayambhu Residency100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Swayambhu ResidencyNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Swayambhu ResidencyNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Swayambhu ResidencyNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Swayambhu ResidencyNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 19 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered3
Open Space15
BuildingClosed/CoveredOpen SpaceTotal
Swayambhu Residency156
Swayambhu Residency156
Swayambhu Residency156

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,141 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6149.15
Proposed, not sanctioned4,845 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKanakia Zillion, Kurla West

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS B Associates
EngineerKevin R Patel
Chartered AccountantA M SOLANKI AND ASSOCIATES LLP
PartnerRole in project
Yogiraj Builders and Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010390Sep 2021 → Sep 2022

Reason as filed by the promoterOwing to a change in the proposed plan of the project and permissions from the respected authority for the same, delay in construction due to lockdown in Mumbai.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Dec 2022

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: SWAYAMBHU CONVEYANCE DEED UPLOADED.pdf19 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form -4 Architect Certificate.pdf8 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupation Certificate.pdf6 Dec 2022
Certificates of CA (Form 3)File: Swayambhu Form 3.PDF22 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Swayambhu.pdf8 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate Swayambhu.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 SWAYAMBHU.pdf8 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30 06 2022 YBD.pdf19 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate YBD signed.pdf19 Jul 2022
Certificates of CA (Form 3)File: FORM-3.pdf14 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architech certificate Q4.pdf19 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf12 May 2022
Form 2AFile: Form2A- YBD.pdf7 Apr 2022
Certificates of CA (Form 3)File: FORM 3 CA Certificate YBD BothSIGNED01.pdf7 Apr 2022
Certificates of CA (Form 3)File: YBD FORM 3.pdf19 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 SB.pdf7 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1SM.pdf7 Oct 2021
Form 2AFile: FOMR2A SB.pdf7 Oct 2021
Form 2AFile: Form 2A SM.pdf7 Oct 2021
Certificates of CA (Form 3)File: FORM 3-CA Certificate-YBD final-SIGNED.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Yogiraj Builders forrm 5.PDF29 Sep 2021
Form 2AFile: FORM-2A Quality Assurance Certificate YBD_compressed.pdf14 Aug 2021
Certificates of CA (Form 3)File: YBD FORM-3 CA CERTIFICATE- SIGNED_compressed.pdf14 Aug 2021
Declaration about Commencement CertificateFile: YOGIRAJ FORM D.pdf21 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form- 2A Quality Assurance Certificate YBD-compressed.pdf25 Jun 2021
Disclosure of sold/ booked inventoryFile: Disclosure Scanned-Signed_compressed.pdf18 Jun 2021
Certificates of CA (Form 3)File: FORM 3 CA YBD Mar21.pdf15 Jun 2021
Certificates of CA (Form 3)File: FORM 3 CA YBD.pdf27 Mar 2021
Certificates of CA (Form 3)File: FORM 3CA Certificate.pdf23 Jan 2021
Certificates of CA (Form 3)File: FORM_3.pdf21 Dec 2020
Certificates of CA (Form 3)File: YBD FORM 3.pdf7 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA FORM 5.PDF7 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Aug 2020
Form 2AFile: QUALITY ASSURANCE CERTIFICATE OF YBD.pdf30 Jan 2020
Certificates of CA (Form 5)File: Form 5.PDF30 Sep 2019
Certificates of CA (Form 5)File: Form 5.PDF30 Sep 2019
Certificates of CA (Form 5)File: Form 5.PDF30 Sep 2019
Proforma of Allotment letterFile: SALE WING RERA AGREEMENT.pdf7 Jul 2019
Details of encumbrancesFile: Rera Letter.pdf27 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Architect Certificate.pdf21 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Engineers Certificate RERA.pdf21 May 2019
Certificates of CA (Form 3)File: Form 3 - CA Certificate.PDF21 May 2019
Certificates of CA (Form 3)File: Form 3.PDF15 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Architect.pdf13 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer.pdf13 Mar 2019
Form 2AFile: Form 2A Engineer.pdf13 Mar 2019
Certificates of CA (Form 5)File: Form 5.PDF27 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: YBD CC.pdf31 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf31 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf31 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf31 Mar 2018
Layout approvalFile: Layout Plan.pdf28 Jul 2017
Layout approvalFile: Layout Plan1.pdf28 Jul 2017
Building plan approvalFile: SWAYAMBHU RESIDENCY 15TH FLOOR.pdf28 Jul 2017
Building plan approvalFile: SWAYAMBHU RESIDENCY (Prop).pdf28 Jul 2017
Layout approvalFile: Layout Letter.pdf28 Jul 2017
Building plan approvalFile: IOD.pdf28 Jul 2017
Copy of the legal title reportFile: Legal Title report.pdf28 Jul 2017
Details of encumbrancesFile: Self Declaration_Encumbrances.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Letter.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout Plan1.pdf28 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf28 Jul 2017
Building Plan Approval (IOD)File: SWAYAMBHU RESIDENCY (Prop).pdf28 Jul 2017
Building Plan Approval (IOD)File: SWAYAMBHU RESIDENCY 15TH FLOOR.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencment Certificate.pdf28 Jul 2017
Declaration in FORM BFile: Form B- final.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf28 Jul 2017
Certificates of CA (Form 3)File: Form 3.pdf28 Jul 2017
Proforma of Allotment letterFile: Agreement for sale.pdf28 Jul 2017
OtherFile: Occupation Certificate.pdf28 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swayambhu Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chinchpada6,700+ in Mumbai Suburban

2 kmSwayambhu ResidencyCompleted 117Lapsed / revoked 72Other 179Dot size: filed unitsN

Filed coordinates, straight-line distance. 368 registered projects within 2 km.

Builder: Yogiraj Builders and Developers

Yogiraj Builders and Developers has 3 registrations on MahaRERA, including Swayambhu Residency and MEERA UPVAN CO-OPERATIVE HOUSING SOCIETY LIMITED. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Swayambhu Residency is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swayambhu Residency?

The registered promoter entity is Yogiraj Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swayambhu Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swayambhu Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swayambhu Residency?

The professionals named in the filing: Architect: S B Associates; Engineer: Kevin R Patel; Chartered Accountant: A M SOLANKI AND ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swayambhu Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swayambhu Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swayambhu Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.