Registered No litigation declared Others project

SWAYAM NIKETAN

By JAINAM ASSOCIATES

RG-MH-17778 · RERA P51800066533 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
24 of 33Construction stages doneacross 3 buildings; furthest along: Sanitary Fittings within the flats /..., 36%
78 of 113Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

SWAYAM NIKETAN is a Others project by JAINAM ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800066533 on 11 Jun 2024. Possession is promised by 30 Dec 2026. The completion date has moved by 24 months from the original filing. 35 of the 113 units on this registration are recorded sold or booked, and 24 of 33 construction stages are filed complete.

At a glance

Project

  • NameSWAYAM NIKETAN
  • TypeOthers
  • Location
    • RAMCHANDRA PAWASKAR ROADNEAR GAODEVI GARDEN
    • BELOW DAHISAR LINK ROAD FLYOVER BRIDGE
    • DAHISAR (W)
    • Dahisar
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • RERA no.P51800066533
  • ReraGenie IDRG-MH-17778

Builder

  • NameJAINAM ASSOCIATES
  • Entity typePartnership
  • PartnersKETAN HIMATLAL MEHTA, CONCEPTION JOHN RUMAO

Key dates

this monthRegisteredJun 2024First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Jun 2024
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 31 Dec 2024)
  • Buildings3 building records
  • Documents filed87 files

Current status

31%35 of 113 units booked
97.9%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA8727027
B WINGNA121145853
C WINGNA121133033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 36%.

A WING73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING76%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises36%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING76%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises36%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18
BuildingClosed/CoveredTotal
A WING33
B WING99
C WING66

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,232 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025
LandownerVillageDistrict
VASTIMAL MOHANLAL JAINDahisarMumbai Suburban
SHAYAM CONSTRUCTION CODahisarMumbai Suburban

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI3787.88
Proposed, not sanctioned3,788 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHEENA GURAV HEIGHTS SV ROAD KANDIVALI WEST MUMBAI 400067
Estimated costRs 14.50 cr
Cost incurredRs 14.19 cr
Work done97.88%
BuildingWingEstimatedIncurred
B WINGNARs 5.01 crRs 4.94 cr
C WINGNARs 5.01 crRs 4.94 cr
A WINGNARs 3.03 crRs 3.03 cr
-NARs 1.45 crRs 1.29 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. Kamlesh Vishram GURAV
ArchitectRK ASSOCIATES
EngineerInfiniti Engineers
Engineershersingh chiltora
Chartered AccountantJINESH SHAH AND CO
Chartered AccountantJINESH SHAH
Chartered AccountantMAHINDRA CHOUDHARY&CO
Chartered AccountantHIMANSHU TANNA
PartnerRole in project
JAINAM ASSOCIATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025535Dec 2024 → Dec 2025

Reason as filed by the promoterDue to shortage of material and labor we are not able to complete project please grant us extension till 30/12/2025

EA03122518504Dec 2024 → Dec 2026

Reason as filed by the promoterWe, M/S JAINAM ASSOCIATES, are the promoters of the real estate project known as "Swayam Niketan" bearing MahaRERA Registration No. P51800066533, situated at Dahisar, Borivali, Mumbai suburban District. We wish to respectfully bring to your attention that during the course of the project, certain layout amendments became necessary, specifically in flat No. 1 from the 1 to the 11th floor and flat No. 07 from the 2nd to the 11th floor. These amendments required revised architectural, structural and MEP drawings, which have been thoroughly prepared, verified and fully approved by the competent au

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf21 Jul 2026
Withdrawal Update Form 2File: form 2.pdf21 Jul 2026
Withdrawal Update Form 3File: form 3.pdf21 Jul 2026
Withdrawal Update Form 1File: FORM 1.pdf25 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf25 Apr 2026
Withdrawal Update Form 3File: Form-3_compressed (2).pdf25 Apr 2026
Withdrawal Update Form 1File: Architect form 1 Swayam Niketan - Dec 25.pdf24 Jan 2026
Withdrawal Update Form 2File: Engr Certificate SwayamNiketan Dec25.pdf24 Jan 2026
Withdrawal Update Form 3File: Form-3 (1) new.pdf24 Jan 2026
Form 2A (FY 2024-2025)File: form 2A (engineer certificate) new format 01.12.2025 (1).pdf8 Jan 2026
Withdrawal Update Form 1File: Architect form 1 - Jainam - Sept 25.pdf20 Nov 2025
Withdrawal Update Form 2File: FORMM2 SEPT 25.pdf20 Nov 2025
Withdrawal Update Form 3File: CA FORM 3 SEPT 25 SWYAM NIKIETAN.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: Jainam form 5.pdf17 Nov 2025
Withdrawal Update Form 1File: Architect form 1 Rera Swayam Niketan 15 07 2025.pdf13 Nov 2025
Withdrawal Update Form 2File: Infiniti Engineeru0027s Certificate.pdf13 Nov 2025
Withdrawal Update Form 3File: CA Report (1)_11zon.pdf13 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mar 25 - Architect form 1 Swayam Niketan.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Jainam - Mar 25 (2).pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Engr Certificate SwayamNiketan Mar25.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (4).pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Jan 2025
Declaration in FORM BFile: form B.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold - Booked Inventory - Jainam.pdf12 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf26 Nov 2024
Layout approvalFile: Amended Plan_1-1.pdf22 Oct 2024
Layout approvalFile: Amended Plan_2-end.pdf22 Oct 2024
Building plan approvalFile: Amended Letter.pdf22 Oct 2024
Copy of Layout Approval (in case of layout)File: Amended Plan_1-1.pdf22 Oct 2024
Copy of Layout Approval (in case of layout)File: Amended Plan_2-end.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf22 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended Letter.pdf22 Oct 2024
Layout approvalFile: PLANS_1-1.pdf22 Jul 2024
Layout approvalFile: PLANS_2-end.pdf22 Jul 2024
Copy of Layout Approval (in case of layout)File: PLANS_1-1.pdf22 Jul 2024
Copy of Layout Approval (in case of layout)File: PLANS_2-end.pdf22 Jul 2024
Building plan approvalFile: IOA.pdf20 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf20 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Jul 2024
Copy of the legal title reportFile: title report.pdf15 May 2024
Other - LegalFile: Agreement 2004 - Vastimal Jain (1).pdf15 May 2024
Other - LegalFile: agreement for sale.pdf15 May 2024
Other - TechnicalFile: REVALIDATED CC.pdf4 May 2024
Other - TechnicalFile: Amended Plan 1.pdf4 May 2024
Other - TechnicalFile: Amended Plan 2.pdf4 May 2024
Building plan approvalFile: 1.pdf23 Mar 2024
Details of encumbrances concerned to FinanceFile: no encumbrance.pdf23 Mar 2024
Details of encumbrances concerned to LegalFile: no encumbrance.pdf23 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf23 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf9 Mar 2024
Other - TechnicalFile: Declaration cum undertaking - Annexure 'A'.pdf9 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Rera Certificate form 1 - dec 23.pdf7 Mar 2024
Other - LegalFile: 1-20.pdf2 Mar 2024
Other - LegalFile: 21-40.pdf2 Mar 2024
Other - LegalFile: 41-60.pdf2 Mar 2024
Other - LegalFile: 61-75.pdf2 Mar 2024
Other - LegalFile: 76-end.pdf2 Mar 2024
Layout approvalFile: Wing A - SWAYAM NIKETAN Part OCC Letter and plan_4-4.pdf22 Feb 2024
Layout approvalFile: Wing A - SWAYAM NIKETAN Part OCC Letter and plan_5-end.pdf22 Feb 2024
Layout approvalFile: Wing A - SWAYAM NIKETAN Part OCC Letter and plan_3-3.pdf22 Feb 2024
Building plan approvalFile: AMENDED PLAN (24-07-2014)_1-2.pdf22 Feb 2024
PAN CardFile: JAINAM ASSOCIATES - PAN CARD.pdf22 Feb 2024
Details of encumbrances concerned to FinanceFile: Jainam - No encumbrance self declaration - MAHA RERA (1).pdf22 Feb 2024
Details of encumbrances concerned to LegalFile: Jainam - No encumbrance self declaration - MAHA RERA (1).pdf22 Feb 2024
Copy of Layout Approval (in case of layout)File: Wing A - SWAYAM NIKETAN Part OCC Letter and plan_3-3.pdf22 Feb 2024
Copy of Layout Approval (in case of layout)File: Wing A - SWAYAM NIKETAN Part OCC Letter and plan_4-4.pdf22 Feb 2024
Copy of Layout Approval (in case of layout)File: Wing A - SWAYAM NIKETAN Part OCC Letter and plan_5-end.pdf22 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: AMENDED PLAN (24-07-2014)_1-2.pdf22 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf22 Feb 2024
Declaration about Commencement CertificateFile: CC COVERING.pdf22 Feb 2024
Declaration in FORM BFile: form B - Affidavit Cum Declaration.pdf22 Feb 2024
CERSAI detailsFile: Jainam - Cersai - Declaration - MAHA RERA (1) (1).pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed Copy-1 (1).pdf22 Feb 2024

How this compares with Mumbai Suburban

31%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SWAYAM NIKETAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHISAR (W)6,700+ in Mumbai Suburban

Builder: JAINAM ASSOCIATES

JAINAM ASSOCIATES has 1 registration on MahaRERA, including SWAYAM NIKETAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SWAYAM NIKETAN is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SWAYAM NIKETAN?

The registered promoter entity is JAINAM ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SWAYAM NIKETAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SWAYAM NIKETAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SWAYAM NIKETAN?

The professionals named in the filing: Architect: Mr. Kamlesh Vishram GURAV; Architect: RK ASSOCIATES; Engineer: Infiniti Engineers; Engineer: shersingh chiltora; Chartered Accountant: JINESH SHAH AND CO; Chartered Accountant: JINESH SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SWAYAM NIKETAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SWAYAM NIKETAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SWAYAM NIKETAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.