Home / Browse projects / Belagavi, Karnataka / SWARNA GRIHA - 4 PHASE 2
SWARNA GRIHA - 4 PHASE 2
RG-KA-18380 · RERA PRM/KA/RERA/1249/447/PR/231123/006430 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Nothing adverse is on this record. The buyer report still lays out every unit, the land chain and the schedule as filed and places this filing against the promoter's other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved.
SWARNA GRIHA - 4 PHASE 2 is a Residential/Group Housing project by FELICITY ADOBE LLP in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/231123/006430 on 23 Nov 2023. Possession is promised by 31 Oct 2027. 416 of the 612 units on this registration are recorded sold or booked, and 5 of 17 construction stages are filed complete.
At a glance
Project
- NameSWARNA GRIHA - 4 PHASE 2
- TypeResidential/Group Housing
- Location
- Belagavi
- 591113
- Pincode591113
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1249/447/PR/231123/006430
- ReraGenie IDRG-KA-18380
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on23 Nov 2023
- Promised completion31 Oct 2027
- Revised completionNone
- Buildings5 building records
- Documents filed274 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower - A2 | - | - | - | 104 | 0 | 104 |
| Tower - A5 | - | - | - | 104 | 0 | 104 |
| Tower - B6 | - | - | - | 104 | 0 | 104 |
| Tower - B5 | - | - | - | 104 | 0 | 104 |
| Tower - B7 | - | - | - | 104 | 0 | 104 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 75%.
Building: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| RCC or MS Framed structure | 75% |
| Masonry construction: Bricks, Concrete blocks etc | 75% |
| Plastering inside , outside & Ceiling | 75% |
| Joinery: Doors, Windows, Ventilators etc | 75% |
| Basic work of Water supply, Sanitary and Electrification | 75% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 75% |
| Railing and Grill fixing | 75% |
| Electrification, Water supply and Sanitary Finishing | 25% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 25% |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | 50% |
| Elevation work | 50% |
| Internal and External work including landscapes as per santioned drawings | 25% |
Progress on shared amenities41
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 50% |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | 35% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 50% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Water conservation | No | Not applicable |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | 0% |
| Electricity supply transformer and substation | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 75% |
| Lifts | Yes | 0% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 85% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 85% |
| Basement | Yes | 100% |
| Terrace | Yes | 80% |
| Outer Wall | Yes | 0% |
| Open parking areas and common storage spaces | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership15
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
| FELICITY ADOBE LLP | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 63.09 cr | Rs 5.57 cr |
| On-site expenditure-Salaries of workers | Rs 3.68 cr | Rs 40.21 lakh |
| Payment of taxes | - | Rs 6.88 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUKHEN P |
| Engineer | RAJESH M H |
| Chartered Accountant | POONACHA S S |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed274
As listed on the registration, under the names the promoter filed them with; the newest 80 of 274 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/231123/006430 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SG 04 Ph2_CA Cert Q2 FY 2026-27.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect SG04-Ph2 Q2 2026-27.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer SG04-Ph2 Q2 2026-27.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 13 Oct 2026 |
| Q2 2026-27 Fire and Safety | 13 Oct 2026 |
| Modified approval PlanFile: Modified Master plan with demark.pdf | 27 Jun 2025 |
| Modified Plan Approval LetterFile: Revised BUDA Letter 4181.pdf | 27 Jun 2025 |
| Architect CertificateFile: Form 5 Architect Cert PH2 Modification.pdf | 27 Jun 2025 |
| Structural Engineer CertificateFile: Structural Stability Certificate.pdf | 27 Jun 2025 |
| Declaration towards Revised KSPCB NOCFile: Declaration Towards Revised KSPCB NOC.pdf | 27 Jun 2025 |
| KSPCB NOCFile: NOC CFE 27th APRIL 2022.pdf | 27 Jun 2025 |
| Modified Plan Approval LetterFile: Revised BUDA Plan 4181.pdf | 30 Apr 2025 |
| Modified approval PlanFile: Modified Master plan with demark.pdf | 30 Apr 2025 |
| Architect CertificateFile: Architect certificate.pdf | 30 Apr 2025 |
| Engineer CertificateFile: Engineer's Certificate.pdf | 30 Apr 2025 |
| AffidavitFile: Modification Affidavit.pdf | 30 Apr 2025 |
| consent of 2/3rd AllotteesFile: Consent Letter.pdf | 30 Apr 2025 |
| Quarterly updatesFile: Quarterly Update_SG 04 Ph 2 Q3-24-25.pdf | 30 Apr 2025 |
| FORM 4- Quarterly CA Certificate with Sold unitsFile: CA Cert_SG 04 Ph-2 Q3-24-25.pdf | 30 Apr 2025 |
| Form 5- Architect cert_SG 04 ph-2 Q3-24-25File: Architect cert_SG 04 ph-2 Q3-24-25.pdf | 30 Apr 2025 |
| Form 6- Engineer Cert-SG-04-Ph 2_Q3-24-25File: Engineer Cert-SG-04-Ph 2_Q3-24-25.pdf | 30 Apr 2025 |
| Annual_Audit_Due_date_for_filing_30 11 2023_dt_20 10 2023File: Annual_Audit_Due_date_for_filing_30 11 2023_dt_20 10 2023.pdf | 16 Nov 2023 |
| Certificate of Incorporation Revised - Felicity Adobe LLP (AAJ 7502)File: Certificate of Incorporation Revised - Felicity Adobe LLP (AAJ 7502).pdf | 16 Nov 2023 |
| Quarterly Update Details Q2- SWARNA GRIHA - 3 SERENE HIGHLANDS 2023-24File: Quarterly Update Details Q2- SWARNA GRIHA - 3 SERENE HIGHLANDS 2023-24.pdf | 16 Nov 2023 |
| Quarterly Update Details SWARNA GRIHA - 4 PHASE 1 -Q2 FY 2023-24File: Quarterly Update Details SWARNA GRIHA - 4 PHASE 1 -Q2 FY 2023-24.pdf | 16 Nov 2023 |
| RERA withdraw Order dated 14 10 2022 SWARNA GRIHA - 2 - PHASE IIFile: RERA withdraw Order dated 14 10 2022 SWARNA GRIHA - 2 - PHASE II.pdf | 16 Nov 2023 |
| SWARNA GRIHA - 3 SERENE HIGHLANDS Form 4CA Cert Q2 FY 2023-24File: SWARNA GRIHA - 3 SERENE HIGHLANDS Form 4CA Cert Q2 FY 2023-24.pdf | 16 Nov 2023 |
| SWARNA GRIHA - 4 PHASE 1 Q2 FY 2023-24 CA certificateFile: SWARNA GRIHA - 4 PHASE 1 Q2 FY 2023-24 CA certificate.pdf | 16 Nov 2023 |
| 70% 120023907478File: 70% 120023907478.pdf | 7 Nov 2023 |
| 100% 120024725765File: 100% 120024725765.pdf | 7 Nov 2023 |
| Affidavit - Non Violation of Section 3(1)File: Affidavit - Non Violation of Section 3(1).pdf | 7 Nov 2023 |
| Affidavit BANKFile: Affidavit BANK.pdf | 7 Nov 2023 |
| BUDA SANCTION LETTERFile: BUDA SANCTION LETTER.PDF | 7 Nov 2023 |
| BUDGET SHEET_07 11 2023File: BUDGET SHEET_07 11 2023.pdf | 7 Nov 2023 |
| BUILDING LICENSEFile: BUILDING LICENSE.pdf | 7 Nov 2023 |
| CERTIFIED CARPET AREAFile: CERTIFIED CARPET AREA.pdf | 7 Nov 2023 |
| Felicity Audit Report with Financials FY 2019-20File: Felicity Audit Report with Financials FY 2019-20.pdf | 7 Nov 2023 |
| Felicity Audit Report with Financials FY 2020-21File: Felicity Audit Report with Financials FY 2020-21.pdf | 7 Nov 2023 |
| Felicity Audit Report with Financials FY 2021-22File: Felicity Audit Report with Financials FY 2021-22.pdf | 7 Nov 2023 |
| Felicity Audit Report with Financials FY 2022-23File: Felicity Audit Report with Financials FY 2022-23.pdf | 7 Nov 2023 |
| Felicity Projected Cash flowsFile: Felicity Projected Cash flows.pdf | 7 Nov 2023 |
| FINAL SG-4 ALLOTMENT DRAFT PHASE 2File: FINAL SG-4 ALLOTMENT DRAFT PHASE 2.pdf | 7 Nov 2023 |
| FINAL SG-4 AOS DRAFT PHASE 2File: FINAL SG-4 AOS DRAFT PHASE 2.pdf | 7 Nov 2023 |
| GUIDELINE VALUE BY SRFile: GUIDELINE VALUE BY SR.pdf | 7 Nov 2023 |
| KLD 675 STP SHOP DRAWING- 04-01-2023-ModelFile: KLD 675 STP SHOP DRAWING- 04-01-2023-Model.pdf | 7 Nov 2023 |
| Land CostFile: Land Cost .pdf | 7 Nov 2023 |
| LATITUDE LONGITUDEFile: LATITUDE LONGITUDE.jpeg | 7 Nov 2023 |
| PHASE 2 DEMARCATION IN PLANFile: PHASE 2 DEMARCATION IN PLAN.jpeg | 7 Nov 2023 |
| NOC WATER SUPPLYFile: NOC WATER SUPPLY.pdf | 7 Nov 2023 |
| NOC SEIAA 13 10 2021File: NOC SEIAA 13 10 2021.pdf | 7 Nov 2023 |
| NOC HESCOM 23 04 2021File: NOC HESCOM 23 04 2021.pdf | 7 Nov 2023 |
| NOC FIRE & EMERGENCY 04 01 2021File: NOC FIRE & EMERGENCY 04 01 2021.pdf | 7 Nov 2023 |
| NOC CFE 27 04 2022File: NOC CFE 27 04 2022.pdf | 7 Nov 2023 |
| NOC AIRPORT NAFile: NOC AIRPORT NA.pdf | 7 Nov 2023 |
| SG4 SINGLE LAYOUT Plan Letter FROM BUDAFile: SG4 SINGLE LAYOUT Plan Letter FROM BUDA.pdf | 7 Nov 2023 |
| SIGNED PANFile: SIGNED PAN.pdf | 7 Nov 2023 |
| TOWERS & INFRASTRUCTURES & AMENITIES DETAILSFile: TOWERS & INFRASTRUCTURES & AMENITIES DETAILS.pdf | 7 Nov 2023 |
| TOWN PLANNING AUTHORITY LETTERFile: TOWN PLANNING AUTHORITY LETTER.jpeg | 7 Nov 2023 |
| UNIT TYPE DETAILS & CALCULATIONSFile: UNIT TYPE DETAILS & CALCULATIONS.pdf | 7 Nov 2023 |
| VILLAGE MAP SHOWING CONSTRUCTION AREAFile: VILLAGE MAP SHOWING CONSTRUCTION AREA.pdf | 7 Nov 2023 |
| PHASE WISE DEMARCATION FOR PHASE 2File: PHASE WISE DEMARCATION FOR PHASE 2.pdf | 7 Nov 2023 |
| SG4- 1st & 2nd Floor PlanFile: SG4- 1st & 2nd Floor Plan.pdf | 7 Nov 2023 |
| SG4- 3rd & 4th Floor PlanFile: SG4- 3rd & 4th Floor Plan.pdf | 7 Nov 2023 |
| SG4- 5th & 6th to 10th Typical Floor PlanFile: SG4- 5th & 6th to 10th Typical Floor Plan.pdf | 7 Nov 2023 |
| SG4- 11th & 12th Floor PlanFile: SG4- 11th & 12th Floor Plan.pdf | 7 Nov 2023 |
| SG4 Basement Floor PlanFile: SG4 Basement Floor Plan.pdf | 7 Nov 2023 |
| SG4 Ground Floor PlanFile: SG4 Ground Floor Plan.pdf | 7 Nov 2023 |
| SG4 Master PlanFile: SG4 Master Plan.pdf | 7 Nov 2023 |
| SG4 Terrace Floor PlanFile: SG4 Terrace Floor Plan.pdf | 7 Nov 2023 |
| SG4 Section AFile: SG4 Section A.pdf | 7 Nov 2023 |
| CA FORM 1 ARCH FORM 2 ENGR FORM 3File: CA FORM 1 ARCH FORM 2 ENGR FORM 3.pdf | 7 Nov 2023 |
| All Conversion Orders All 15 SY NosFile: All Conversion Orders All 15 SY Nos.pdf | 7 Nov 2023 |
| All EC 15 Years All SY Nos in Form No 15 All 15 SY NosFile: All EC 15 Years All SY Nos in Form No 15 All 15 SY Nos.PDF | 7 Nov 2023 |
| All Mutations All 15 SY NosFile: All Mutations All 15 SY Nos.pdf | 7 Nov 2023 |
| All SY Nos RTC All 15 SY NosFile: All SY Nos RTC All 15 SY Nos.pdf | 7 Nov 2023 |
| Sale Deeds for 7 Sy NosFile: Sale Deeds for 7 Sy Nos.pdf | 7 Nov 2023 |
| Sale Deeds for 8 Sy NosFile: Sale Deeds for 8 Sy Nos.pdf | 7 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Buyer report
Built from this project's RERA Karnataka filing, in plain language.
- Red flags and clear checks, the possession story and who you are dealing with
- Every unit as filed, tower by tower: carpet area, undivided share of the land and parking, with the sizes placed against the other projects of the taluk
- The land chain survey by survey: conversion order, deed, khata and joint development, in date order
- The construction schedule the promoter filed, planned dates against actual ones, item by item
- Joined against the promoter's other registrations on RERA Karnataka and every project registered within 2 km, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep SWARNA GRIHA - 4 PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Swarna Griha - 4 Phase 1
Felicity Adobe LLP
SkyCity Homes
M/s. Vishal Infra Built Ltd.
Shree Sant Babamaharaj Complex
Ratuja Developers
Pinnacle
Lotus Landmakrs (I) Pvt Ltd
JYOTICHANDRA
G P DEVELOPERS
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
See every Belagavi project, with the district possession charts
Builder: FELICITY ADOBE LLP
FELICITY ADOBE LLP has 8 registrations on RERA Karnataka, including SWARNA GRIHA - 4 PHASE 2 and Swarna Griha - 4 Phase 1. Its filings declare 6 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if SWARNA GRIHA - 4 PHASE 2 is delayed beyond 31 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SWARNA GRIHA - 4 PHASE 2?
The registered promoter entity is FELICITY ADOBE LLP, a partnership firm as per the filing. Its LLPIN AAJ-7502 and GSTIN 29AAMFT5978L1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SWARNA GRIHA - 4 PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SWARNA GRIHA - 4 PHASE 2?
The professionals named in the filing: Architect: SUKHEN P; Engineer: RAJESH M H; Chartered Accountant: POONACHA S S. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SWARNA GRIHA - 4 PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback