MANGALMURTI PARK
RG-MH-77688 · RERA P52000010385 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 3 months past the filed date
- Completion date moved by 55 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MANGALMURTI PARK is a Others project by ELANZA DEVELOPER in Raigarh, Maharashtra, registered with MahaRERA as P52000010385 on 24 Aug 2017. Possession was promised by 31 Jul 2026 and is now 3 months past that date. The completion date has moved by 55 months from the original filing. 209 of the 277 units on this registration are recorded sold or booked, and 27 of 44 construction stages are filed complete.
At a glance
Project
- NameMANGALMURTI PARK
- TypeOthers
- Location
- Nr.Government Hospital
- Poladpur
- Poladpur (Urban)
- Raigarh
- 402303
- Pincode402303
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000010385
- ReraGenie IDRG-MH-77688
Builder
- NameELANZA DEVELOPER
- Entity typePartnership
- PartnersHASMUKH NARAYANBHAI PATEL, BHARAT SHANTILAL PATEL, JAYESH SHANTILAL PATEL, HIREN GOVINDBHAI DIWANI
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Aug 2017
- Promised completion31 Jul 2026
- Revised completionRevised to 31 Jul 2026 (originally 30 Dec 2021)
- Buildings4 building records
- Documents filed202 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A-WING | NA | 5 | 5 | 38 | 78 | 116 |
| B-WING | NA | 8 | 7 | 63 | 0 | 63 |
| C-WING | NA | 8 | 7 | 98 | 0 | 98 |
| D-WING | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.
A-WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B-WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C-WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D-WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| JAYANT VETTHAL SHETH | Poladpur (Urban) | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C-WING | NA | Rs 12.86 cr | Rs 12.86 cr |
| B-WING | NA | Rs 7.37 cr | Rs 7.37 cr |
| A-WING | NA | Rs 6.46 cr | Rs 6.46 cr |
| - | NA | Rs 3.20 cr | Rs 3.20 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRECISION ARCHITECT & PLANNER |
| Engineer | SUHAS RAGHUNATH PATIL |
| Engineer | VILAS |
| Chartered Accountant | VIRENKUMAR RAMESHBHAI POKAR |
| Chartered Accountant | PRASANT PATEL |
| Chartered Accountant | NIRMALKUMAR PATEL |
| Chartered Accountant | PGMJ & ASSOCIATES |
| Partner | Role in project |
|---|---|
| ELANZA DEVELOPER | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to current covide-19 pandemic we are unable to complete project in time.
Reason as filed by the promoterDue to Covide-19 and frequent flood condition in rainy season in the area of mahad and poladpur.
Reason as filed by the promoterThe project faced delays due to factors beyond the promoter’s control. Owing to its outside location, no sale of units was achieved during the initial period, resulting in financial constraints and slower progress. Additionally, the project was adversely affected by flooding, which disrupted construction activities and caused further delay. As on date, the project construction is fully completed and all statutory requirements have been complied with. The project is awaiting receipt of the Full Occupancy Certificate (OC), which is expected shortly.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed202
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 202 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 17 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf | 12 May 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: FORM-1 2025-26 Q1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: FORM-1 2025-26 Q2.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: FORM-2 2025-26 Q1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: FORM-2 2025-26 Q2.pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: FORM-2 2025-26 Q3.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: FORM-3 2025-26 Q1.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: FORM-3 2025-26 Q2.pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Final.pdf | 24 Feb 2026 |
| Form 1File: FORM-1 2023-24 Q4.pdf | 19 Feb 2026 |
| Form 2File: FORM-2 2023-24 Q4.pdf | 19 Feb 2026 |
| Form 3File: FORM-3 2023-24 Q4.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2023-24 Q4.pdf | 19 Feb 2026 |
| Form 1File: FORM-1 2024-25 Q1.pdf | 19 Feb 2026 |
| Form 2File: FORM-2 2024-25 Q1.pdf | 19 Feb 2026 |
| Form 3File: FORM-3 2024-25 Q1.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2024-25 Q1.pdf | 19 Feb 2026 |
| Form 1File: FORM-1 2024-25 Q2.pdf | 19 Feb 2026 |
| Form 2File: FORM-2 2024-25 Q2.pdf | 19 Feb 2026 |
| Form 3File: FORM-3 2024-25 Q2.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2024-25 Q2.pdf | 19 Feb 2026 |
| Form 1File: FORM-1 2024-25 Q3.pdf | 19 Feb 2026 |
| Form 2File: FORM-2 2024-25 Q3.pdf | 19 Feb 2026 |
| Form 3File: FORM-3 2024-25 Q3.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2024-25 Q3.pdf | 19 Feb 2026 |
| Form 1File: FORM-1 2024-25 Q4.pdf | 19 Feb 2026 |
| Form 2File: FORM-2 2024-25 Q4.pdf | 19 Feb 2026 |
| Form 3File: FORM-3 2024-25 Q4.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2024-25 Q4.pdf | 19 Feb 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A 2024-25.pdf | 19 Feb 2026 |
| Form 1File: FORM-1 2023-24 Q2.pdf | 17 Nov 2025 |
| Form 2File: FORM-2 2023-24 Q2.pdf | 17 Nov 2025 |
| Form 3File: FORM-3 2023-24 Q2_11zon.pdf | 17 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2023-24 Q2.pdf | 17 Nov 2025 |
| Form 1File: FORM-1 2023-24 Q3.pdf | 17 Nov 2025 |
| Form 2File: FORM-2 2023-24 Q3.pdf | 17 Nov 2025 |
| Form 3File: FORM-3 2023-24 Q3_11zon.pdf | 17 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2023-24 Q3.pdf | 17 Nov 2025 |
| Form 2A (FY 2017-2018)File: FORM 2A 2017-18.pdf | 17 Nov 2025 |
| Form 2A (FY 2018-2019)File: FORM 2A 2018-19.pdf | 17 Nov 2025 |
| Form 2A (FY 2019-2020)File: FORM-2A-2019-20.pdf | 17 Nov 2025 |
| Form 2A (FY 2020-2021)File: FORM 2A 2020-21.pdf | 17 Nov 2025 |
| Form 2A (FY 2021-2022)File: FORM 2A 2021-22.pdf | 17 Nov 2025 |
| Form 2A (FY 2022-2023)File: FORM 2A 2022-23.pdf | 17 Nov 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A 2023-24.pdf | 17 Nov 2025 |
| Form 5 (FY 2017-2018)File: FORM-5-2017-18.pdf | 17 Nov 2025 |
| Form 5 (FY 2018-2019)File: FORM-5-2018-19.pdf | 17 Nov 2025 |
| Form 5 (FY 2019-2020)File: FORM-5-2019-20.pdf | 17 Nov 2025 |
| Form 5 (FY 2020-2021)File: FORM-5-2020-21.pdf | 17 Nov 2025 |
| Form 5 (FY 2021-2022)File: FORM-5-2021-22.pdf | 17 Nov 2025 |
| Form 5 (FY 2022-2023)File: FORM-5 2022-23.pdf | 17 Nov 2025 |
| Form 5 (FY 2023-2024)File: FORM-5 2023-24.pdf | 17 Nov 2025 |
| Form 1File: FORM-1 2017-18 Q2.pdf | 16 Nov 2025 |
| Form 2File: FORM-2 2017-18 Q2.pdf | 16 Nov 2025 |
| Form 3File: FORM-3 2017-18 Q2.pdf | 16 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2017-18 Q-2.pdf | 16 Nov 2025 |
| Form 1File: FORM-1 2017-18 Q3.pdf | 16 Nov 2025 |
| Form 2File: FORM-2 2017-18 Q3.pdf | 16 Nov 2025 |
| Form 3File: FORM 3 2017-18 Q-3_11zon.pdf | 16 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2017-18 Q-3.pdf | 16 Nov 2025 |
| Form 1File: FORM-1 2017-18 Q4.pdf | 16 Nov 2025 |
| Form 2File: FORM-2 2017-18 Q4.pdf | 16 Nov 2025 |
| Form 3File: FORM-3 2017-18 Q4_11zon.pdf | 16 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2017-18 Q-4.pdf | 16 Nov 2025 |
| Form 1File: FORM-1 2018-19 Q1.pdf | 16 Nov 2025 |
| Form 2File: FORM-2 2018-19 Q1.pdf | 16 Nov 2025 |
| Form 3File: FORM-3 2018-19 Q1_11zon.pdf | 16 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2018-19 Q1.pdf | 16 Nov 2025 |
| Form 1File: FORM-1 2018-19 Q2.pdf | 16 Nov 2025 |
| Form 2File: FORM-2 2018-19 Q2.pdf | 16 Nov 2025 |
| Form 3File: FORM-3 2018-19 Q2_11zon.pdf | 16 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD 2018-19 Q2.pdf | 16 Nov 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 202 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MANGALMURTI PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Poladpur5,900+ in Raigarh
SWARAJ COMPLEX
AMI REALTY DEVELOPERS LLP
SIDDHI SAMRUDDHI RESIDENCY
SURENDRA KASHIRAM CHAVAN
SHIV PLAZA
GAIKWAD BUILDERS AND DEVELOPERS
SHREE SAMARTH KRUPA A/B WING
RAJESH SHANTARAM MAHADIK
RAMCHANDRA NANA APPARTMENT
SANJAY NANA JADHAV
NANA SADAN
SANJAY NANA JADHAV
See every Raigarh project, with the district possession charts
Builder: ELANZA DEVELOPER
ELANZA DEVELOPER has 1 registration on MahaRERA, including MANGALMURTI PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that MANGALMURTI PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MANGALMURTI PARK is delayed beyond 31 Jul 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MANGALMURTI PARK?
The registered promoter entity is ELANZA DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MANGALMURTI PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MANGALMURTI PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MANGALMURTI PARK?
The professionals named in the filing: Architect: PRECISION ARCHITECT & PLANNER; Engineer: SUHAS RAGHUNATH PATIL; Engineer: VILAS; Chartered Accountant: VIRENKUMAR RAMESHBHAI POKAR; Chartered Accountant: PRASANT PATEL; Chartered Accountant: NIRMALKUMAR PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MANGALMURTI PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback