Red flags

  • Completion date moved by 43 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Buldana registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 43 months from the original
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
13 of 13Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

Swami is a Commercial project by Aditya Anagha Multi State Credit Co-Operative Society Limited in Buldana, Maharashtra, registered with MahaRERA as P50000081048 on 24 Nov 2025. Possession is promised by 31 Dec 2029. The completion date has moved by 43 months from the original filing. 0 of the 13 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSwami
  • TypeCommercial
  • Location
    • Plot No 9
    • Survey No 292
    • 293/1
    • Shegaon
    • Shegaon (R)
    • Buldana
    • 444203
  • Pincode444203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50000081048
  • ReraGenie IDRG-MH-81650

Builder

  • NameAditya Anagha Multi State Credit Co-Operative Society Limited
  • Entity typeSociety
  • GSTIN27AACAA1469J1ZQ
  • Authorized SignatorySamir Suresh Saraf
  • ChairpersonAnagha Samir Saraf
  • SecretariesVishal Vinayakrao Gurao, Ashok Madhukarrao Ambarte
  • Other registrations2 more →

Key dates

this monthRegisteredNov 2025First promiseMay 2026Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Nov 2025
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 May 2026)
  • Buildings1 building record
  • Documents filed50 files

Current status

0%0 of 13 units booked
6.0%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SwamiNA8501313

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

Swami: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered8
Open Space30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area625 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityShegaon Municipal Council
Permissible FSI2570.28
Proposed, not sanctioned1,570 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAJASTHAN BHAVAN,JUNA COTTON MARKET
Estimated costRs 4.79 cr
Cost incurredRs 28.77 lakh
Work done6.0%
BuildingWingEstimatedIncurred
SwamiNARs 4.55 crRs 12.80 lakh
-NARs 23.96 lakhRs 15.97 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAdvaya Consortium
EngineerRushikesh Gopalrao Konde
EngineerS K Consultants & Engineers
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Aditya Anagha Multi State Credit Co-Operative Society Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13082622117May 2026 → Dec 2029

Reason as filed by the promoterThe above-mentioned project was duly registered with the Maharashtra Real Estate Regulatory Authority (MahaRERA). The Promoter has consistently endeavoured to execute and complete the project in accordance with the approved plans, applicable statutory requirements, and regulatory compliances. However, due to an inadvertent clerical error in recording the project completion date, the project completion date was not correctly reflected, which consequently resulted in a delay in initiating and submitting the application for extension of the project registration within the prescribed timeline. The

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2 A.pdf13 Aug 2026
Withdrawal Update Form 1File: Architect Certificate Swami 30-06-26.pdf30 Jul 2026
Withdrawal Update Form 2File: Swami_Form2_Q1_2026-27_30-07-2026_05-46.pdf30 Jul 2026
Withdrawal Update Form 3File: Swami_Form3_Q1_2026-27_28-07-2026_13-14_doc1.pdf30 Jul 2026
Withdrawal Update Form 1File: Architect Cert Swami.pdf30 Jun 2026
Withdrawal Update Form 2File: Form 2 Swami as on 31-03-2026.pdf30 Jun 2026
Withdrawal Update Form 3File: Form 3 Swami as on 31-03-2026.pdf30 Jun 2026
Form 1File: Form 1 Swami as on 31-12-2025.pdf18 May 2026
Form 2File: Form 2 Swami as on 31-12-2025.pdf18 May 2026
Form 3File: Form 3 Swami as on 31-12-2025.pdf18 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Swami as on 31-12-2025.pdf18 May 2026
Form 1File: Form 1 Swami as on 31-03-2026.pdf18 May 2026
Form 2File: Form 2 Swami as on 31-03-2026.pdf18 May 2026
Form 3File: Form 3 Swami as on 31-03-2026.pdf18 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Swami as on 31-03-2026.pdf18 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Swami.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Swami_compressed.pdf3 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Swami.pdf3 Apr 2025
Other - LegalFile: Page 3 Swami.pdf3 Apr 2025
Other - LegalFile: 5 Other - Legal (3).pdf27 Mar 2025
Layout approvalFile: Approved Plan Swami_11zon.pdf26 Mar 2025
Building plan approvalFile: Approved Plan Swami_11zon.pdf26 Mar 2025
Copy of Layout Approval (in case of layout)File: Approved Plan Swami_11zon.pdf26 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development-1-2.pdf26 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Appendix F Swami.pdf26 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Approved Plan Swami_11zon.pdf26 Mar 2025
Declaration about Commencement CertificateFile: Format D- Swami.pdf26 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf26 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (2).pdf26 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf26 Mar 2025
Proforma of Allotment letterFile: AL_SWAMI_ADITYA-ANAGHA MULTI-STATE CREDIT CO-OPERATIVE SOCIETY LIMITED_04032025.pdf7 Mar 2025
Deviation Report with respect to Allotment letterFile: Deviation AL.pdf7 Mar 2025
Deviation Report with respect to model copy of AgreementFile: Deviation AFS.pdf7 Mar 2025
Proforma of Agreement for saleFile: AFS_SWAMI_ADITYA-ANAGHA MULTI-STATE CREDIT CO-OPERATIVE SOCIETY LIMITED_04032025.pdf7 Mar 2025
Declaration in FORM BFile: Form B Swami.pdf4 Mar 2025
Other - FinanceFile: Land Cost Declaration.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Swami.pdf28 Feb 2025
Copy of the legal title reportFile: Final Title Swami.pdf25 Feb 2025
PAN CardFile: Pan Card - Aditya Anagha Multi State Credit Co-op Soc LTD.pdf22 Feb 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf22 Feb 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf22 Feb 2025
Other - LegalFile: Sale Deed Aditya Anagha- Area 325-1-35_11zon.pdf22 Feb 2025
Other - LegalFile: Sale Deed Aditya Anagha- Area 325-36-70_11zon.pdf22 Feb 2025
Other - LegalFile: Sale Deed 300-31-57_11zon.pdf22 Feb 2025
Other - LegalFile: Sale Deed 300-1-30_11zon.pdf22 Feb 2025
CERSAI detailsFile: Cersai Declaration.pdf22 Feb 2025
Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf22 Feb 2025
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf22 Feb 2025
Other - TechnicalFile: Order 50.pdf22 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Secured Unsecured.pdf22 Feb 2025

How this compares with Buldana

0%of this project is bookeddistrict median 0%
10%of Buldana projects moved their completion datethis one moved by 43 months
46%of Buldana registrations have lapsed or been cancelledthis one is on the register

Computed across the 58 Buldana projects on ReraGenie, from their own filings.

Keep Swami on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shegaon58 in Buldana

Builder: Aditya Anagha Multi State Credit Co-Operative Society Limited

Aditya Anagha Multi State Credit Co-Operative Society Limited has 3 registrations on MahaRERA, including A2 Universal and Nimisha - 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Buldana district page.

Frequently asked questions

What are my rights if Swami is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swami?

The registered promoter entity is Aditya Anagha Multi State Credit Co-Operative Society Limited, a society as per the filing. Its GSTIN 27AACAA1469J1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swami?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swami?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swami?

The professionals named in the filing: Architect: Advaya Consortium; Engineer: Rushikesh Gopalrao Konde; Engineer: S K Consultants & Engineers; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swami?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swami. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swami to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.