Registration lapsed No litigation declared Plotted project

Chhoriya Township - Shegaon Plotting Phase - 3

By Anmol Kanhaiyalal Chhoriya

RG-MH-02416 · RERA P50000027938 · Last updated on MahaRERA portal: 21 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Buldana registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
52 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

Chhoriya Township - Shegaon Plotting Phase - 3 is a Plotted project by Anmol Kanhaiyalal Chhoriya in Buldana, Maharashtra, registered with MahaRERA as P50000027938 on 21 Jan 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 0 of the 52 units on this registration are recorded sold or booked.

At a glance

Project

  • NameChhoriya Township - Shegaon Plotting Phase - 3
  • TypePlotted
  • Location
    • 18.00 M Wide Road
    • Shegaon
    • Shegaon (M Cl)
    • Buldana
    • 444203
  • Pincode444203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50000027938
  • ReraGenie IDRG-MH-02416

Builder

  • NameAnmol Kanhaiyalal Chhoriya
  • Entity typeIndividual
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredJan 2021PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Jan 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed83 files

Current status

0%0 of 52 units booked
20.0%Work done, per cost certificate

Figures as on 21 Feb 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities16

As on 21 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Ent GateYes0%

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area15,120 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Jun 2025
LandownerVillageDistrict
Ramkrushna Ramlal TarapureShegaon (M Cl)Buldana
Akhtar Khan Akbar KhanShegaon (M Cl)Buldana

Approvals and building plan

Sanctioning authoritySDO Buldhana
Permissible FSI11822.6
Proposed, not sanctioned11,823 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivajinagar , Pune
Estimated costRs 86.01 lakh
Cost incurredRs 17.22 lakh
Work done20.02%
BuildingWingEstimatedIncurred
-NARs 86.01 lakhRs 17.22 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Kunal P Patil
EngineerIMPower Projects - Mr Manish Pande
EngineerAvinash Wadgaonkar
Chartered AccountantAyush S. Kankariya
PartnerRole in project
Anmol Kanhaiyalal Chhoriya-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Shegaon P3 Form 1 Dec 2025.pdf21 Feb 2026
Form 2File: Shegaon P3 Form 2 Dec 2025.pdf21 Feb 2026
Form 3File: Shegaon P3 Form 3 Dec 2025.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Shegaon P3 Sold-Unsold Dec 2025.pdf21 Feb 2026
Form 1File: Shegaon Phase 3 Form 1 Sept 2025.pdf16 Jan 2026
Form 2File: Shegaon Phase 3 Form 2 Sept 2025.pdf16 Jan 2026
Form 3File: Shegaon Phase 3 Form 3 Sept 2025.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Shegaon Ph-3.pdf16 Jan 2026
Form 1File: Shegaon P3 Form 1 June 25.pdf28 Aug 2025
Form 2File: Shegaon P3 Form 2 June 25.pdf28 Aug 2025
Form 3File: Shegaon P3 Form 3 June 25.pdf28 Aug 2025
Disclosure of Sold and Booked InventoryFile: Shegaon Phase 3 Sold & Unsold June 2025.pdf28 Aug 2025
Form 1File: Shegaon P3 Form 1 March 2025.pdf24 Jun 2025
Form 2File: Shegaon P3 Form 2 March 2025.pdf24 Jun 2025
Form 3File: Shegaon P3 Form 3 March 2025.pdf24 Jun 2025
Disclosure of Sold and Booked InventoryFile: Shegaon P3 Sold & Unsold.pdf24 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shegaon Phase 3 Form 1 Dec 2024.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shegaon Phase 3 Form 3 Dec 2024.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shegaon Phase 3 Form 2 Dec 2024.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: F5 CA Shegaon P3 23-24.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Shegaon P3 Sept2024.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Shegaon P3 Sept2024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Shegaon P3 Sept2024.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Shegaon P3 June2024.pdf31 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Shegaon P3 June2024.pdf31 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Shegaon P3 June2024.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Shegaon P3 March24.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Shegaon P3 March24.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Shegaon P3 March24.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Shegaon P3.pdf17 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Shegaon P3 Jan21-March21.pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Shegaon P3 April21-March22.pdf5 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Shegaon P3 April22-March23.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shegaon P3 Dec 2024_compressed.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Shegaov P3 Dec23.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Shegaon P3 Dec23.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Shegaon P3 Sept 2023_compressed.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Shegaon ph3 Sept23.pdf29 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Shegaon ph3 Sept23.pdf29 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Shegaon P3 Dec 2022.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Shegaon P3 june 2023.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Shegaon P3 Dec 2022.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Shegaon P3 June 2023.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Shegaon P3 Dec 2022.pdf15 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Shegaon P3 june 2023.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar shegaon 3.pdf30 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er shegaon phase 3.pdf30 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA shegaon 3_11zon.pdf30 Dec 2022
Disclosure of sold/ booked inventoryFile: Shegaon P3.pdf28 Dec 2022
Disclosure of sold/ booked inventoryFile: Shegaon ph3.pdf27 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA shegaon p3_11zon.pdf24 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar shegaon p3.pdf23 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er shegaon p3.pdf23 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certi chhoriya township Shegaon plotting phase 3.pdf4 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er certi shegaon phase 3.pdf4 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certi chhoriya township, Shegaon plotting phase 3.pdf4 Jul 2022
CERSAI detailsFile: CERSAI SHEGAON PH-3.pdf14 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 JAN 22 SHEGAON PHASE 3.pdf1 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHEGAON PHASE 3.pdf1 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JAN 22 SHEGAON PHASE 3_compressed.pdf1 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEGAON PHASE 3_compressed.pdf25 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CHHORIYA TOWNSHIP SHEGAON PLOTTING PHASE 3.pdf15 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SodaPDF-compressed-FORM 2CHHORIYA TOWNSHIP SHEGAON PLOTTING PHASE3_reduce.pdf15 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shegaone Phase - 3 Architect Certificate Up to - June 21.pdf29 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shegaone Phase - 3 Eng Certificate Up to - June 21.pdf29 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Shegaone Phase - 3 Site Superviser Certificate - June 21 S.pdf29 Sep 2021
Disclosure of sold/ booked inventoryFile: Shegaone Phase - 3 Sold - Unsold Details - June 21.pdf29 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shegaone Phase - 3 CA Certificate Up to - June 21.pdf29 Sep 2021
Declaration in FORM BFile: Shegaon Form B Owner Phase - 2 And 3.pdf13 Jan 2021
Declaration in FORM BFile: Shegaon Form B Updated Date - 31-12-2025.pdf13 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shegaon Phase - 3 CA Certificate.pdf5 Jan 2021
Layout approvalFile: Chhoriya Township - Phase - 3 (4 A Layout).pdf2 Jan 2021
Building plan approval or NA orderFile: NA Order Shegaone Phase - 3 (2).pdf2 Jan 2021
Copy of Layout Approval (in case of layout)File: Chhoriya Township - Phase - 3 (4 A Layout).pdf2 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: NA Order Shegaone Phase - 3 (2).pdf2 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: NA Order Shegaone Phase - 3 (2).pdf2 Jan 2021
Layout approvalFile: Shegaon Phasewise Layout.pdf10 Dec 2020
PAN CardFile: Pan Card.pdf10 Dec 2020
Copy of the legal title reportFile: Search Report Shegaon Phase - 3.pdf10 Dec 2020
Details of encumbrancesFile: Builder Encumburance.pdf10 Dec 2020

How this compares with Buldana

0%of this project is bookeddistrict median 0%
10%of Buldana projects moved their completion datethis one has not
46%of Buldana registrations have lapsed or been cancelledthis one is among them

Computed across the 58 Buldana projects on ReraGenie, from their own filings.

Keep Chhoriya Township - Shegaon Plotting Phase - on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shegaon58 in Buldana

Builder: Anmol Kanhaiyalal Chhoriya

Anmol Kanhaiyalal Chhoriya has 3 registrations on MahaRERA, including Chhoriya Township - Shegaon Plotting Phase - 1 and Chhoriya Township - Shegaon Plotting Phase - 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Buldana district page.

Frequently asked questions

What does it mean that Chhoriya Township - Shegaon Plotting Phase - 3 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Chhoriya Township - Shegaon Plotting Phase - 3 is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chhoriya Township - Shegaon Plotting Phase - 3?

The registered promoter entity is Anmol Kanhaiyalal Chhoriya, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chhoriya Township - Shegaon Plotting Phase - 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chhoriya Township - Shegaon Plotting Phase - 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chhoriya Township - Shegaon Plotting Phase - 3?

The professionals named in the filing: Architect: Mr Kunal P Patil; Engineer: IMPower Projects - Mr Manish Pande; Engineer: Avinash Wadgaonkar; Chartered Accountant: Ayush S. Kankariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chhoriya Township - Shegaon Plotting Phase - 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chhoriya Township - Shegaon Plotting Phase - 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chhoriya Township - Shegaon Plotting Phase - to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.