ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SUYOG ABHILASHA

Completed No litigation declared Others project

SUYOG ABHILASHA

By SUYOG ADINATH

RG-MH-09981 · RERA P52100012264 · Last updated on MahaRERA portal: 1 Jan 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

SUYOG ABHILASHA is a Others project by SUYOG ADINATH in Pune, Maharashtra, registered with MahaRERA as P52100012264 on 1 Sep 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameSUYOG ABHILASHA
  • TypeOthers
  • Location
    • Jalochi
    • Baramati
    • Pune
    • 413102
  • Pincode413102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012264
  • ReraGenie IDRG-MH-09981

Builder

  • NameSUYOG ADINATH
  • Entity typeOthers
  • Named personsSUYOG CITY DEVELOPERS UNIT-3, ADINATH BUILDING CONSTRUCTION AND DEVELOPERS

Key dates

this monthRegisteredSep 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUYOG ABHILASHANA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jan 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

SUYOG ABHILASHA: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 1 Jan 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes50%

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered10
Open Space15

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,152 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3104.0
Proposed, not sanctioned2,574 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSWARGATE PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectELEMENT FIVE
EngineerPURUSHOTTAM SADASHIV KULKARNI
PartnerRole in project
SUYOG ADINATH-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100006247Dec 2019 → Jun 2021

Reason as filed by the promoterDUE TO COVID 19 BARAMATI MUNICIPAL CORPORATION IS NOT WORKING WITH FULL MAN FORCE BECAUSE OF WHICH WE ARE NOT GETTING OCCUPANCY CERTIFICATE WHICH IS DELAYING OUR PROJECT. WE KINDLY REQUEST YOU TO EXTENED OUR PROJECT FOR 6 MONTHS AND ALSO KINDLY GIVE US EFFECT OF EXTENTION DUE TO COVID-19 TIME LIMIT BY MAHARERA.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 May 2021

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engg Letter to RERA 2019-20_compressed.pdf1 Jan 2022
Disclosure of sold/ booked inventoryFile: Suyog Adinath (AOP) sold flat working 31-12-2021.pdf1 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Abhilasha soceity details.pdf31 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engg Certificate To RERA-compressed.pdf10 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Suyog Abhilasha Completion Certificate.pdf24 May 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Rera Certificate.pdf25 Jul 2020
Certificates of CA (Form 5)File: baramati form 5.pdf27 Apr 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: baramati form 5.pdf27 Apr 2020
Certificates of CA (Form 5)File: SUYOG_ADINATH.PDF30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Mar 2018
Declaration in FORM BFile: Suyog Adinath AOP-affidavit cum declaration-final.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31 07 17 FINAL ENGINEERS CERTIFICATE.pdf31 Jul 2017
Certificates of CA (Form 3)File: ca-suyog adinath-certificate 31 07 17 RERA.pdf31 Jul 2017
Proforma of Allotment letterFile: AGREEMENT AND ALLOTMENT LETTER FINAL.pdf31 Jul 2017
OtherFile: Form-A notes-suyog adinath 31 07 17.pdf31 Jul 2017
Building plan approvalFile: Temp00091 Baramati (1).pdf29 Jul 2017
Building plan approvalFile: Temp00091 Baramati (2).pdf29 Jul 2017
Building plan approvalFile: Temp00091 Baramati (3).pdf29 Jul 2017
Layout approvalFile: Temp00091 Baramati (1).pdf29 Jul 2017
PAN CardFile: pan card of suyog adinath.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate 12 08 16 sakhare adv Baramati.pdf29 Jul 2017
Details of encumbrancesFile: self declartion by promoters-suyog adinath.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Temp00091 Baramati (1).pdf29 Jul 2017
Building Plan Approval (IOD)File: Temp00091 Baramati (1).pdf29 Jul 2017
Building Plan Approval (IOD)File: Temp00091 Baramati (2).pdf29 Jul 2017
Building Plan Approval (IOD)File: Temp00091 Baramati (3).pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Architect Certificate baramati.pdf29 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUYOG ABHILASHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Jalochi13,700+ in Pune

2 kmSUYOG ABHILASHACompleted 7Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: SUYOG ADINATH

SUYOG ADINATH has 1 registration on MahaRERA, including SUYOG ABHILASHA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SUYOG ABHILASHA is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUYOG ABHILASHA?

The registered promoter entity is SUYOG ADINATH, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUYOG ABHILASHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUYOG ABHILASHA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUYOG ABHILASHA?

The professionals named in the filing: Architect: ELEMENT FIVE; Engineer: PURUSHOTTAM SADASHIV KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUYOG ABHILASHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUYOG ABHILASHA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUYOG ABHILASHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.