SUVIDHI APARTMENT
RG-MH-99305 · RERA P52100015773 · Last updated on MahaRERA portal: 10 Jan 2025
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUVIDHI APARTMENT is a Residential / Group Housing project by COSMO LIFESCAPES LLP in Pune, Maharashtra, registered with MahaRERA as P52100015773 on 26 Mar 2018. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 18 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameSUVIDHI APARTMENT
- TypeResidential / Group Housing
- Location
- YERWADA
- VIMANNAGAR
- Haveli
- Pune
- 411006
- Pincode411006
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100015773
- ReraGenie IDRG-MH-99305
Builder
- NameCOSMO LIFESCAPES LLP
- Entity typeOthers
- Named personsAMIT CHIMANLAL DHUMAWAT, YATISH CHIMANLAL DHUMAWAT, RAHUL RAJESH MALPANI, RAJESH RAMCHANDRA MALPANI
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 Mar 2018
- Promised completion31 Dec 2023
- Revised completionRevised to 31 Dec 2023 (originally 30 Jun 2022)
- Buildings1 building record
- Documents filed144 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUVIDHI APARTMENT | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SUVIDHI APARTMENT: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 10 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 80% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRAKASH KULKARNI - ANKUR ASSOCIATES |
| Partner | Role in project |
|---|---|
| COSMO LIFESCAPES LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNon availability of material and Labor due to Covid 19 pnademic
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1815/2018/2018 | CIVIL JUDGE SENIOR DIVISION PUNE | SUIT DISMISSED |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000106406 | kUMAR URBAN DEVELOPMENT PVT LTD | Cosmo LifescapesLLP | 06/01/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 May 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 13 Jul 2024
Documents filed144
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf | 10 Jan 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION.pdf | 10 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM4.pdf | 27 Nov 2024 |
| OtherFile: CONSENT BY ALLOTTIES FOR Extentation of Project Completion Request Letter.pdf | 27 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: 1 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for | 8 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cosmo Completion Certificate.pdf | 13 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bank Engineer Certificate 31 3 2024.pdf | 8 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report-1.pdf | 8 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Letter 31 3 24.pdf | 24 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 31 3 24.pdf | 24 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory 31 3 24.pdf | 24 Apr 2024 |
| Certificates of CA (Form 3)File: CA Certificate 31 3 24.pdf | 24 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 31-12-23-1.pdf | 16 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Bank Certificate 31 12 23.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A 31-12-23.pdf | 16 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory 31 12 23.pdf | 16 Jan 2024 |
| Certificates of CA (Form 3)File: C A Certificate 31 12 23.pdf | 16 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Bank Certificate 30923.pdf | 16 Oct 2023 |
| Certificates of CA (Form 3)File: CA Certificate 30092023_compressed.pdf | 12 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 300923.pdf | 7 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Rera Letter 30923.pdf | 7 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory 30923.pdf | 7 Oct 2023 |
| Building plan approvalFile: HPSC1293-compressed.pdf | 11 Aug 2023 |
| Building plan approvalFile: HPSC1294-compressed.pdf | 11 Aug 2023 |
| Building plan approvalFile: HPSC1295-compressed.pdf | 11 Aug 2023 |
| Building Plan Approval (IOD)File: HPSC1293-compressed.pdf | 11 Aug 2023 |
| Building Plan Approval (IOD)File: HPSC1294-compressed.pdf | 11 Aug 2023 |
| Building Plan Approval (IOD)File: HPSC1295-compressed.pdf | 11 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 11 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 UT Pratik Agrawal CA 2022-2023.pdf | 27 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 30-06-2023.pdf | 13 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance 2022-23.pdf | 12 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate 30-06-2023.pdf | 12 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June 2023.pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance 2022-23.pdf | 7 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory 30-06-2023.pdf | 7 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ARCHITECTS CERTIFICATE 31032023.pdf | 17 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form 2 March 2023.pdf | 11 Apr 2023 |
| Certificates of CA (Form 3)File: CA Certificate Form 3 March 2023.pdf | 11 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form 1 31-03-2023.pdf | 8 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold 31-03-2023.pdf | 8 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Assurance 2022-23.pdf | 7 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report Form 5.pdf | 25 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate (3).pdf | 17 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_removed.pdf | 17 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 A.pdf | 17 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf | 17 Jan 2023 |
| Certificates of CA (Form 3)File: CA Certificate (2)_compressed.pdf | 17 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 engineer cert 30-9-22.pdf | 27 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer for quality assurance 30-9-22.pdf | 27 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate (3).pdf | 19 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3 CA Letter for Rera.pdf | 19 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect certificate (2)_compressed.pdf | 8 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineer Certificate for quality assurance.pdf | 8 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List (3).pdf | 8 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 27 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Form 2A.pdf | 27 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Inventry.pdf | 27 Aug 2022 |
| Declaration about Commencement CertificateFile: Commencement Decleration.pdf | 11 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Inventary Letter.pdf | 11 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf | 10 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf | 10 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Letter.pdf | 9 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 2 Engineer.pdf | 9 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A SITE SUPERVISOR.pdf | 9 Jun 2022 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE_compressed.pdf | 9 Jun 2022 |
| Certificates of CA (Form 3)File: CA certificate Dec 21.pdf | 11 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_compressed.pdf | 8 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 8 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 ArchCert.pdf | 7 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate compressed.pdf | 27 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 12 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 12 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3.pdf | 12 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3 March_compressed.pdf | 17 Aug 2021 |
| Certificates of CA (Form 3)File: Form 3 June_compressed.pdf | 17 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf | 17 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect 31 MARCH 21.pdf | 5 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect 30 JUNE 21.pdf | 5 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31 MARCH 21.pdf | 5 Aug 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 144 filed documents as one ZIP, foldered, with a manifest
Keep SUVIDHI APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near YERWADA13,700+ in Pune
Filed coordinates, straight-line distance. 48 registered projects within 2 km.
VAISHNAVI OURANOS
VAISHNAVI & OM CONSTRUCTION
Nandanvan
NG Rathi Construction Private Limited
KALPANA CO OP HSG SOC LTD - PHASE 1
Bramhacorp Limited
UTTAM TOWNSCAPE LIFE HUB A,A1,B
FORTUNE DEVELOPERS AND INFRASTRUCTURES
VRUNDAVAN A WING
NG Rathi Promoters
White House A
CITY ETHERNAL LLP
Builder: COSMO LIFESCAPES LLP
COSMO LIFESCAPES LLP has 1 registration on MahaRERA, including SUVIDHI APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SUVIDHI APARTMENT is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUVIDHI APARTMENT?
The registered promoter entity is COSMO LIFESCAPES LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUVIDHI APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SUVIDHI APARTMENT?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SUVIDHI APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUVIDHI APARTMENT?
The professionals named in the filing: Architect: PRAKASH KULKARNI - ANKUR ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUVIDHI APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback