Home / Browse projects / Mumbai Suburban, Maharashtra / SUSHANKU AVENUE 36

Registered No litigation declared Residential / Group Housing project

SUSHANKU AVENUE 36

By SUSHANKU REALTY PRIVATE LIMITED

RG-MH-43576 · RERA P51800046272 · Last updated on MahaRERA portal: 25 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 11 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
107 of 277Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 221 documents Report an error

SUSHANKU AVENUE 36 is a Residential / Group Housing project by SUSHANKU REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046272 on 20 Jun 2022. Possession is promised by 30 Nov 2026. The completion date has moved by 11 months from the original filing. 170 of the 277 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSUSHANKU AVENUE 36
  • TypeResidential / Group Housing
  • Location
    • GOREGAON WEST
    • SIDDHARTH NAGAR
    • Andheri
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046272
  • ReraGenie IDRG-MH-43576

Builder

  • NameSUSHANKU REALTY PRIVATE LIMITED
  • Entity typeCompany
  • CINU45100MH2017PTC298826
  • GSTIN27AAACQ4909M1Z3
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsAKSHAT ASHOK GUPTA, ANKUSH ASHOK GUPTA
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2022First promiseDec 2025Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed221 files

Current status

61%170 of 277 units booked
98.6%Work done, per cost certificate

Figures as on 25 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SUSHANKU AVENUE 36NA23222734277

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SUSHANKU AVENUE 36: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed204

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots204
Closed/Covered204

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,487 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Oct 2025

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI12669.55
Proposed, not sanctioned12,670 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16, Gr Flr, Kanakia Zillion LBS, CST Road, Kurla West, Mumbai, Maharashtra 400070
Estimated costRs 131.00 cr
Cost incurredRs 129.15 cr
Work done98.59%
BuildingWingEstimatedIncurred
-NARs 84.70 crRs 87.43 cr
SUSHANKU AVENUE 36NARs 46.30 crRs 41.72 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMITIE DESIGNERS & PLANNERS PVT LTD
EngineerRAVINDRA DESHPANDE
EngineerSHAUKATALI BASHASAHEB TAMBOLI
EngineerManoj Yadav
Chartered AccountantAnil B. Jain & Associates
PartnerRole in project
SUSHANKU REALTY PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26122519028Dec 2025 → Nov 2026

Reason as filed by the promoterThe issuance of OC was under process and pending at the level of the statutory authorities.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed221

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 221 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: DrawingIODApproved_1-1.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_2-2.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_3-3.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_4-4.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_5-5.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_6-6.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_7-7.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_8-8.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_9-9.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_10-10.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_11-11.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_12-12.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_13-13.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_14-14.pdf25 Aug 2026
Building plan approvalFile: DrawingIODApproved_15-end.pdf25 Aug 2026
Withdrawal Update Form 1File: FORM 1 - 31-03-2026.pdf25 Aug 2026
Withdrawal Update Form 1File: FORM 1 - 31-03-2026.pdf25 Aug 2026
Withdrawal Update Form 1File: FORM 1 - 31-03-2026.pdf25 Aug 2026
Withdrawal Update Form 2File: FORM 2 - 31-03-2026.pdf25 Aug 2026
Withdrawal Update Form 2File: FORM 2 - 31-03-2026.pdf25 Aug 2026
Withdrawal Update Form 2File: FORM 2 - 31-03-2026.pdf25 Aug 2026
Withdrawal Update Form 3File: FORM 3 - 31-03-2026.pdf25 Aug 2026
Withdrawal Update Form 3File: FORM 3 - 31-03-2026.pdf25 Aug 2026
Withdrawal Update Form 3File: FORM 3 - 31-03-2026.pdf25 Aug 2026
Form 2A (FY 2023-2024)File: FORM 2A FY-2023-2024.pdf24 Aug 2026
Form 2A (FY 2022-2023)File: FORM 2A FY- 2022-2023.pdf24 Aug 2026
Form 2A (FY 2025-2026)File: FORM 2A FY-2025-2026.pdf24 Aug 2026
Withdrawal Update Form 1File: Form 1 - 31-12-2025.pdf23 Apr 2026
Withdrawal Update Form 2File: Form 2 - 31-12-2025.pdf23 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1 - 31-12-2025.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 - 31-12-2025.pdf22 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf22 Apr 2026
Form 5 (FY 2023-2024)File: FORM 5 - 2023-24.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 - 31-12-2025.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 - 31-12-2025.pdf21 Apr 2026
Withdrawal Update Form 3File: FORM 3 - 31-12-2025.pdf21 Apr 2026
Form 1File: FORM 1 - 30-09-2025.pdf29 Oct 2025
Form 2File: FORM 2 - 30-09-2025.pdf29 Oct 2025
Form 3File: FORM 3 - 30-09-2025.pdf29 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY - 30-09-2025.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A - FY 2024-2025.pdf2 Aug 2025
Form 5 (FY 2022-2023)File: FORM 5 - 2022-23.pdf2 Aug 2025
Form 1File: Architect Certificate.pdf23 Jul 2025
Form 2File: Engineer Certificate.pdf23 Jul 2025
Form 3File: CA Certificate.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf23 Jul 2025
Form 1File: FORM 1 30-09-2022.pdf11 Jul 2025
Form 2File: FORM 2 30-09-2022.pdf11 Jul 2025
Form 3File: FORM 3 30-09-2022.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30-09-2022.pdf11 Jul 2025
Form 1File: FORM 1 31-12-2022.pdf11 Jul 2025
Form 2File: FORM 2 31-12-2022.pdf11 Jul 2025
Form 3File: FORM 3 31-12-2022.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-12-2022.pdf11 Jul 2025
Form 1File: FORM 1 31-03-2023.pdf11 Jul 2025
Form 2File: FORM 2 31-03-2023.pdf11 Jul 2025
Form 3File: FORM 3 31-03-2023.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-03-2023.pdf11 Jul 2025
Form 1File: FORM 1 30-06-2023.pdf11 Jul 2025
Form 2File: FORM 2 30-06-2023.pdf11 Jul 2025
Form 3File: FORM 3 30-06-2023.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30-06-2023.pdf11 Jul 2025
Form 1File: FORM 1 30-09-2023.pdf11 Jul 2025
Form 2File: FORM 2 30-09-2023.pdf11 Jul 2025
Form 3File: FORM 3 30-09-2023.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30-09-2023.pdf11 Jul 2025
Form 1File: FORM 1 31-12-2023.pdf11 Jul 2025
Form 2File: FORM 2 31-12-2023.pdf11 Jul 2025
Form 3File: FORM 3 31-12-2023.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-12-2023.pdf11 Jul 2025
Form 1File: FORM 1 31-03-2024.pdf11 Jul 2025
Form 2File: FORM 2 31-03-2024.pdf11 Jul 2025
Form 3File: FORM 3 31-03-2024.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-03-2024.pdf11 Jul 2025
Form 1File: FORM 1 30-06-2024.pdf11 Jul 2025
Form 2File: FORM 2 30-06-2024.pdf11 Jul 2025
Form 3File: FORM 3 30-06-2024.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30-06-2024.pdf11 Jul 2025

How this compares with Mumbai Suburban

61%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 11 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUSHANKU AVENUE 36 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SIDDHARTH NAGAR6,700+ in Mumbai Suburban

2 kmSUSHANKU AVENUE 36Completed 134Lapsed / revoked 71Other 135Dot size: filed unitsN

Filed coordinates, straight-line distance. 340 registered projects within 2 km.

Builder: SUSHANKU REALTY PRIVATE LIMITED

SUSHANKU REALTY PRIVATE LIMITED has 2 registrations on MahaRERA, including SUSHANKU AVENUE 36 and SUSHANKU AVENUE 37. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SUSHANKU AVENUE 36 is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUSHANKU AVENUE 36?

The registered promoter entity is SUSHANKU REALTY PRIVATE LIMITED, a company as per the filing. Its CIN U45100MH2017PTC298826 and GSTIN 27AAACQ4909M1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUSHANKU AVENUE 36?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUSHANKU AVENUE 36?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUSHANKU AVENUE 36?

The professionals named in the filing: Architect: MITIE DESIGNERS & PLANNERS PVT LTD; Engineer: RAVINDRA DESHPANDE; Engineer: SHAUKATALI BASHASAHEB TAMBOLI; Engineer: Manoj Yadav; Chartered Accountant: Anil B. Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUSHANKU AVENUE 36?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUSHANKU AVENUE 36. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUSHANKU AVENUE 36 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.