Registration approved No litigation declared Residential/Group Housing project

SURYA PRIDE

By SURYA BUILDERS

RG-KA-36751 · RERA PRM/KA/RERA/1251/310/PR/071122/005412 · Last updated on RERA Karnataka portal: 4 Nov 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Nov 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 128 documents Report an error

SURYA PRIDE is a Residential/Group Housing project by SURYA BUILDERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/071122/005412 on 7 Nov 2022. Possession is promised by 30 Nov 2024.

At a glance

Project

  • NameSURYA PRIDE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560068
  • Pincode560068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/071122/005412
  • ReraGenie IDRG-KA-36751

Builder

  • NameSURYA BUILDERS
  • Entity typePartnership Firm
  • GSTIN29ACFFS3413G1Z6
  • Authorized SignatoryM THYAGARAJU
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2022PromisedNov 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on7 Nov 2022
  • Promised completion30 Nov 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed128 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SURYA PRIDE---72072

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 4 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 4 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,942 sq m
Named landowners2
LandownerVillageDistrict
Ashok Babu Movva--
Anand Babu Movva--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 24.48 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 19.45 cr-
Payment of taxesRs 2.25 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 1.50 cr-
On-site expenditure-Site OverheadRs 40.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 30.00 lakh-
On-site expenditure-Consultants FeesRs 20.00 lakh-
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 15.00 lakh-
On-site expenditure-Salaries of workersRs 13.33 lakh-
Payment of PremiumsRs 5.00 lakh-
Payment of cessRs 1.50 lakh-
Payment of feesRs 1.50 lakh-
Payment of chargesRs 1.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV SIVAKUMAR
EngineerSrinivas Rao Bolimunta
Chartered AccountantRamesh Babu L

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed128

As listed on the registration, under the names the promoter filed them with; the newest 80 of 128 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/071122/005412 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Chartered accountant certificateFile: Form - 1 C A Certificate.pdf4 Nov 2022
membershipFile: Certificate of Practice.pdf4 Nov 2022
cdpFile: CDP.pdf4 Nov 2022
certificateFile: SIVA KUMAR - BBMP licence Certificate.pdf4 Nov 2022
planFile: BBMP PLAN COPY.pdf4 Nov 2022
relinquishment deedFile: img20221104_13375618.pdf4 Nov 2022
PRM/KA/RERA/1251/310/PR/180526/001826 quarterly updatesFile: Quarterly Update Details - Surya Palace Q2 2018-19.pdf15 Oct 2022
PRM/KA/RERA/1251/310/PR/190330/002511 quarterly updatesFile: Quarterly Update Details - Q2.pdf15 Oct 2022
chartered accountant certificateFile: Form 1 - Chartered Accountant Certificate.pdf15 Oct 2022
certified copy obtained by the concerned Sub-registrar regarding value of the property on the basisFile: Certified copy of Guidence Value.pdf15 Oct 2022
Re - Constitution of partnership deedFile: Re Constitution of Partnership Deed.pdf15 Oct 2022
architect details with Valid COA numberFile: SIVA KUMAR - BBMP Certificate.pdf15 Oct 2022
CDP plan showing the proposed Road widening area has been shown in approved planFile: BBMP PLAN COPY.pdf15 Oct 2022
relinquishment Deed not applicable as road widening shown by plan approved authorities in plan onlyFile: BBMP PLAN COPY.pdf15 Oct 2022
Quarterly updates previous project Surya PalaceFile: Surya Palace - Engineer Certificate.pdf22 Sep 2022
Quarterly updates previous project Surya PalaceFile: Surya Spaces - Engineer Certificate.pdf22 Sep 2022
chartered accountant certificateFile: Form 1 - Chartered Accountant Certificate.pdf22 Sep 2022
Remaining fee 1700 paid receiptFile: RERA ADDL FEE PAID RECEIPT.pdf22 Sep 2022
FAR in the development as per plan copy attachedFile: BBMP PLAN COPY.pdf22 Sep 2022
architect details with Valid COA numberFile: SIVA KUMAR - BBMP Certificate.pdf22 Sep 2022
Single plot layoutFile: Single Plot Layout.pdf22 Sep 2022
Single plot layout OrderFile: Single Plot Layout Order.pdf22 Sep 2022
CDP plan showing the proposed Road widening areaFile: DOCUMENT NA.pdf22 Sep 2022
Relinquishment Deed Of the Road Widening AreaFile: DOCUMENT NA.pdf22 Sep 2022
Commencement CertificateFile: Document CC.pdf22 Sep 2022
section 3(1) notarized affidavitFile: Form 3(1) Affidavit.pdf22 Sep 2022
Audited Balance sheet 2022 with UDINFile: BALANCE SHEET 2022.pdf19 Aug 2022
Audited Profit and Loss Account 2022 with UDINFile: PROFIT AND LOSS ACCOUNT 2022.pdf19 Aug 2022
M R for Both Sy NoFile: M R COPIES FOR BOTH SY NOs.pdf19 Aug 2022
Khata Extract before amalgamation of Anand B MovvaFile: KATHA EXTRACT - ANAND B MOVVA.pdf19 Aug 2022
Khata Extract before amalgamation of Ashok B MovvaFile: KATHA EXTRACT - ASHOK B MOVVA.pdf19 Aug 2022
Khata Extract after amalgamationFile: KHATA EXTRACT AFTER AMALGAMATION.pdf19 Aug 2022
Sale Deed from Nagappa to Anand B Movva 1File: SALE DEED NAGAPPA TO ANAND B MOVVA 1.pdf19 Aug 2022
Sale Deed from Nagappa to Anand B Movva 2File: SALE DEED NAGAPPA TO ANAND B MOVVA 2.pdf19 Aug 2022
Notarized Joint Affidavit cum declaration by Land Owners and DevelopersFile: Joint Affidavit Cum Declaration.pdf19 Aug 2022
EC from 01.04.2004 to 08.02.2010File: EC COPY 01 04 2004 to 08 02 2010.pdf19 Aug 2022
EC from 01.04.2009 to 08.12.2021File: EC COPY 01 04 2009 to 08 12 2021.pdf19 Aug 2022
EC from 01.04.2021 to 10.08.2022File: EC COPY 01 04 2021 TO 10 08 2022.pdf19 Aug 2022
Advocate Search ReportFile: Advocate Search Report.pdf19 Aug 2022
Notarized Non Litigation AffidavitFile: NON - LITIGATION AFFIDAVIT.pdf19 Aug 2022
Single Plot LayoutFile: Single Plot Layout.pdf19 Aug 2022
Single Plot Layout OrderFile: Single Plot Layout Order.pdf19 Aug 2022
Village mapFile: Village Map.pdf19 Aug 2022
KSPCB NOCFile: KSPCB NOC.pdf19 Aug 2022
Brief estimated cost of Construction certified by the EngineerFile: Brief Estimated Cost cost of Construction.pdf19 Aug 2022
BESCOM NOC along with fee paid receiptFile: BESCOM NOC ALONG WITH FEE PAID DETAILS.pdf19 Aug 2022
PROFORMA OF ALLOTMENT LETTERFile: Proforma of Allotment Letter.pdf19 Aug 2022
Notarized affidavit of section 3(1)File: Form 3(1) Affidavit.pdf19 Aug 2022
BWSSB NOC ALONG WITH FEE PAID RECEIPTS COPIESFile: BWSSB - NOC.pdf19 Aug 2022
STP Design Drawing and demarcation site planFile: STP Design Drawing and demarcation site plan.pdf19 Aug 2022
Certificate Structural Safety from Registered EngineerFile: Structural Stability Certificate.pdf19 Aug 2022
Registration CertificateFile: FIRM Registration Certificate.pdf-
Partnership DeedFile: Re Constitution of Partnership Deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 Chartered Accountant Certificate.pdf-
Certificate issued by Architect Form 2File: ARCHITECT'S CERTIFICATE.pdf-
Certificate issued by Engineer Form 3File: ENGINEER'S CERTIFICATE.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Document.pdf-
Certificate from Chartered AccountFile: Form 1 Chartered Accountant Certificate.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet 2022.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet 2021.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet 2020.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit and Loss account 2022.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit and Loss Account 2021.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit and Loss Account 2020.pdf-
Director's Report 2020 - 2021File: Document.pdf-
Director's Report 2019 - 2020File: Document.pdf-
Director's Report 2018 - 2019File: Document.pdf-
Cash Flow Statement 2020 - 2021File: Document.pdf-
Cash Flow Statement 2019 - 2020File: Document.pdf-
Auditor's Report 2020 - 2021File: Document.pdf-
Auditor's Report 2019 - 2020File: Document.pdf-
Auditor's Report 2018 - 2019File: Document.pdf-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SURYA SPACESSY NO.37/4,KHATHAN NO 100/37/4,BEGUR VILLAGE,BEGUR HOBLI , WARD NO -182,, BENGALURU SOUTH, BENGALURU URBANCompleted-No date filed
SURYA PALACEKAMMANAHALLI VILLAGE, BANNERGHATTA ROAD,BEGUR HOBLI, BENGALURU SOUTH, BENGALURU URBANCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SURYA PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSURYA PRIDEOther 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: SURYA BUILDERS

SURYA BUILDERS has 2 registrations on RERA Karnataka, including SURYA PRIDE and SURYA PALACE. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SURYA PRIDE is delayed beyond 30 Nov 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SURYA PRIDE?

The registered promoter entity is SURYA BUILDERS, a partnership firm as per the filing. Its GSTIN 29ACFFS3413G1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SURYA PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SURYA PRIDE?

The professionals named in the filing: Architect: V SIVAKUMAR; Engineer: Srinivas Rao Bolimunta; Chartered Accountant: Ramesh Babu L. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURYA PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURYA PRIDE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURYA PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.