Assetz Canvas & Cove 2.0 - Block B & C
By APG HABITAT PRIVATE LIMITED
RG-KA-23651 · RERA PRM/KA/RERA/1251/310/PR/071223/006454 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Assetz Canvas & Cove 2.0 - Block B & C is a Residential/Group Housing project by APG HABITAT PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/071223/006454 on 7 Dec 2023. Possession is promised by 31 Oct 2028. 369 of the 373 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.
At a glance
Project
- NameAssetz Canvas & Cove 2.0 - Block B & C
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560068
- Pincode560068
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/071223/006454
- ReraGenie IDRG-KA-23651
Builder
- NameAPG HABITAT PRIVATE LIMITED
- Entity typeCompany
- CINU70109KA2016PTC093453
- GSTIN29AAOCA4442R1ZV
- Authorized SignatorySomasundaram Thiruppathi
- CeoAkshay Kishore Dewani
- DirectorsSomasundaram Thiruppathi, Jagannath Laxman Shetty
- Project HeadGurumoorthy N
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on7 Dec 2023
- Promised completion31 Oct 2028
- Revised completionNone
- Buildings2 building records
- Documents filed178 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK -B | - | - | - | 162 | 0 | 162 |
| BLOCK-C | - | - | - | 211 | 0 | 211 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 18 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 97%.
Building: 27% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 97% |
| RCC or MS Framed structure | 90% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 35% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 55% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 60% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 70% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 25% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| N Arun Kumar | - | - |
| Pankaja | - | - |
| B.S.Somashekar | - | - |
| Ramaiah | - | - |
| Pradeep Krishnappa | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 180.47 cr | Rs 88.51 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 19.26 cr | Rs 22.14 cr |
| On-site expenditure-Site Overhead | Rs 13.07 cr | Rs 12.56 cr |
| Approval Cost | Rs 11.45 cr | Rs 5.69 cr |
| On-site expenditure-Consultants Fees | Rs 4.01 cr | Rs 2.35 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kishore Panikkar |
| Engineer | HITEN RAMANLAL MAHIMTURA |
| Chartered Accountant | Y S Shetty & Company |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed178
As listed on the registration, under the names the promoter filed them with; the newest 80 of 178 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/071223/006454 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - canvas & Cove B & C.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Canvas & Cove 2 0 Block B & C.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) - Canvas & Cove B&C.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - canvas & Cove B & C.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Canvas & Cove 2 Block B & C.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) - Canvas & Cove B&C.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - canvas & Cove B & C.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Canvas & Cove B & C.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) - Canvas & Cove B&C.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - canvas & Cove B & C.pdf | 11 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Canvas & Cove B & C.pdf | 11 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6- Engineer Certificate Assetz C & C Block B & C.pdf | 11 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 11 Mar 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 11 Mar 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 11 Mar 2026 |
| Q3 2025-26 Fire and Safety | 11 Mar 2026 |
| Q3 2025-26 Airport Authority of India | 11 Mar 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 11 Mar 2026 |
| Building LicenceFile: Annexure 1 - Building Licence.pdf | 5 Dec 2023 |
| Site Plan, Combined Basement+Ground FloorPlan,Block C - from 1st to 13th Floor PlanFile: Annexure 2 -Site Plan, Combined Basement+Ground FloorPlan,Block C - from 1st to 13th Floor | 5 Dec 2023 |
| Block C -from 14th to Terrace Floor Plan, Block B - 1st to 7th Floor PlanFile: Annexure 3 - Block C -from 14th to Terrace Floor Plan, Block B - 1st to 7th Floor Plan.pdf | 5 Dec 2023 |
| Block B - from 8th to Terrace Floor PlanFile: Annexure 4 - Block B - from 8th to Terrace Floor Plan.pdf | 5 Dec 2023 |
| Sections & ElevationFile: Annexure 5 - Sections & Elevation.pdf | 5 Dec 2023 |
| Bank Statement and ClarificationFile: Annexure 1-Clarification regarding Loan and Bank Statement.pdf | 2 Dec 2023 |
| Area DetailsFile: Annexure 2-Area Details.pdf | 2 Dec 2023 |
| BHK Type Area detailsFile: Annexure 3-BHK Wise Inventory.pdf | 2 Dec 2023 |
| Carpet areaFile: Annexure 4-Carpet Area Calculation.pdf | 2 Dec 2023 |
| FAR SanctionFile: Annexure 5-FAR Sanctioned.pdf | 2 Dec 2023 |
| Built Up areaFile: Annexure 6-Built up Area.pdf | 2 Dec 2023 |
| Hieght of the BuildingFile: Annexure 7-Height of Building.pdf | 2 Dec 2023 |
| Car Parking DetailsFile: Annexure 8-Car Park details.pdf | 2 Dec 2023 |
| Carpet area CalculationFile: Annexure 9-Carpet Area Calculation.pdf | 2 Dec 2023 |
| Sensative Area ClearanceFile: Annexure 10-BEGUR SENSITIVE ZONE CLR.pdf | 2 Dec 2023 |
| SIEAA Noc ClarificationFile: Annexure 12-Clarification regarding SEIAA.pdf | 2 Dec 2023 |
| KSPCB NOC ClarificationFile: Annexure 13-Clarification Regrading KSPCB.pdf | 2 Dec 2023 |
| DP plan OrderFile: Annexure 14-DP order copy.pdf | 2 Dec 2023 |
| Building License CopyFile: Annexure 15-Building Licence Copy.pdf | 2 Dec 2023 |
| Architect CertificateFile: Annexure 16-Architect Certificate.pdf | 2 Dec 2023 |
| Engineer CertificateFile: Annexure 17-Engineer Certificate.pdf | 2 Dec 2023 |
| CA CertificateFile: Annexure 18-CA Certificate.pdf | 2 Dec 2023 |
| Sanction PlanFile: Annexure 19-Sanction Drawings.pdf | 2 Dec 2023 |
| Profit & Loss and Balance Sheet 2019-20File: Annexure 1-BS and P & L 2019-20.pdf | 9 Nov 2023 |
| Profit & Loss and Balance Sheet 2020-21File: Annexure 2-BS and P & L 2020-21.pdf | 9 Nov 2023 |
| Profit & Loss and Balance Sheet 2021--22File: Annexure 3-BS and P & L 2021-22.pdf | 9 Nov 2023 |
| Bank statement 100File: Annexure 4-Bank statement 100.pdf | 9 Nov 2023 |
| Bank statement 70File: Annexure 5-Bank Statement 70.pdf | 9 Nov 2023 |
| Bank statement 30File: Annexure 6-Bank Statement 30.pdf | 9 Nov 2023 |
| Clarification regarding FundsFile: Annexure 8-Clarification regarding Funds.pdf | 9 Nov 2023 |
| the Source of funds to complete the Project.File: Annexure 9-Sources of Funds.pdf | 9 Nov 2023 |
| the chartered accountant certificate in the prescribed format form -01File: Annexure 10-CA Certificate form 1.pdf | 9 Nov 2023 |
| EC for sno 133/1 from 1/2/2018 to till dateFile: Annexure 11-EC Sy no 133-1.pdf | 9 Nov 2023 |
| sno 134 from 25/1/2019 to till dateFile: Annexure 12-EC Sy no 134-1.pdf | 9 Nov 2023 |
| RTC of sno 134/1File: Annexure 13-RTC Sy no 134-1.pdf | 9 Nov 2023 |
| single EC from 1-10-2015 to till date for sno 134/1File: Annexure 14-EC Sy no 134-1.pdf | 9 Nov 2023 |
| RTC of sno 134/1File: Annexure 15-RTC Sy no 134-1.pdf | 9 Nov 2023 |
| single continuous EC for the period 1-4-2007 to till date for sno 134/3 6)File: Annexure 16-EC from 2007 to till date sy no 134-3.pdf | 9 Nov 2023 |
| Non-Litigation AffidavitFile: Annexure 17-Non-Litigation Affidavit.pdf | 9 Nov 2023 |
| Form BFile: Annexure 18-Form B.pdf | 9 Nov 2023 |
| Joint AffidavitFile: Annexure 19-Joint Affidavit.pdf | 9 Nov 2023 |
| Area DetailsFile: Annexure 20-Area Details.pdf | 9 Nov 2023 |
| Clarification regarding carpet areaFile: Annexure 21 -Carpet Area.pdf | 9 Nov 2023 |
| Clarification regarding Built AreaFile: Annexure 22 -Built Area.pdf | 9 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Assetz Canvas & Cove 2.0 - Block B & C on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 27 registered projects within 2 km.
MEMCO SKYLINE - JUTAKU
MEMCO SKYLINE PRIVATE LIMITED
SNN RAJ SERENITY
SNN Builders Private Limited
TVS Emerald Jardin
Emerald Haven Development Limited
CASAGRAND AMOR
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Assetz Mizumi Reserve Tower A1 A2 A4
APG COMMUNITY DEVELOPMENT PRIVATE LIMITED
Assetz Canvas & Cove - Phase 1 Wing A & B
APG HABITAT PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: APG HABITAT PRIVATE LIMITED
APG HABITAT PRIVATE LIMITED has 4 registrations on RERA Karnataka, including Assetz Canvas & Cove 2.0 - Block A and Assetz Canvas & Cove 2.0 - Block B & C. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Assetz Canvas & Cove 2.0 - Block B & C is delayed beyond 31 Oct 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Assetz Canvas & Cove 2.0 - Block B & C?
The registered promoter entity is APG HABITAT PRIVATE LIMITED, a company as per the filing. Its CIN U70109KA2016PTC093453 and GSTIN 29AAOCA4442R1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Assetz Canvas & Cove 2.0 - Block B & C?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Assetz Canvas & Cove 2.0 - Block B & C?
The professionals named in the filing: Architect: Kishore Panikkar; Engineer: HITEN RAMANLAL MAHIMTURA; Chartered Accountant: Y S Shetty & Company. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Assetz Canvas & Cove 2.0 - Block B & C?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback