Home / Browse projects / Pune, Maharashtra / Sunshine Joy Phase 2

Completed No litigation declared Others project

Sunshine Joy Phase 2

By Greenlife Associates

RG-MH-12417 · RERA P52100004441 · Last updated on MahaRERA portal: 31 Mar 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
19 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

Sunshine Joy Phase 2 is a Others project by Greenlife Associates in Pune, Maharashtra, registered with MahaRERA as P52100004441 on 9 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSunshine Joy Phase 2
  • TypeOthers
  • Location
    • Paud Road
    • Pirangut Bazaar
    • Pirangut
    • Mulshi
    • Pune
    • 411042
  • Pincode411042
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100004441
  • ReraGenie IDRG-MH-12417

Builder

  • NameGreenlife Associates
  • Entity typePartnership
  • PartnerAlpesh M Patel

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings2 building records
  • Documents filed30 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A2NA140000
CommercialNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 31 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Commercial82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 31 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SHIVAJI SATU PAWALE AND OTHERSPirangutPune
NAMDEO NIVRUTTI PAWALE AND OTHERSPirangutPune

Approvals and building plan

Permissible FSI14771.4
Proposed, not sanctioned14,414 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManekji wadia bldg ground floor nanik motwani marg fort Mumbai Maharashtra 400001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTeam Work Architects and Planner
EngineerHansal Parikh
PartnerRole in project
Greenlife Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001265Dec 2018 → Dec 2019

Reason as filed by the promoterThe RERA registered phase of the project consists of one residential towers and one G+3 commercial building. 1. We had to stop the work because the sanctioning authority did not process our file for revision of plans for almost entire year. The road adjacent to the project was changed from State Highway to National Highway hence the set back margins from center of the road were increased. The sanctioning authority refused to give approval on plan revisions even though plinth checking was in place. Hence, we had to stop the work for almost 6 months. It took us nearly one year to get our plans r

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Dec 2019

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 revised format full completion Sunshine Joy Resi and Comm phase 2 MahaRERA Greenlif31 Mar 2023
Architect’s Certificate on Completion of Project (Form 4)File: Pirangut Sunshine Joy form 4 Commercial Bldg Part 2.pdf25 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sunshine Joy completion certificate RERA.pdf24 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A2 building Completion Certificate.pdf10 Aug 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sunshine Joy Commercial completion certificate.pdf10 Aug 2019
Status of Formation of Legal EntityFile: Sunshine Joy cooperative society certificate.pdf1 Jan 2019
Certificates of CA (Form 5)File: M V Sunshine Joy Form 5 RERA Sept 2018.pdf30 Sep 2018
Status of Formation of Legal EntityFile: Sunshine Joy Society formation.pdf9 Mar 2018
OtherFile: plinth cheking certificate wing A2.pdf9 Mar 2018
OtherFile: plinth cheking certificate wing c and club house.pdf9 Mar 2018
Proforma of Allotment letterFile: RERA allotment format.pdf13 Feb 2018
Proforma of Allotment letterFile: Sunshine Joy A2 RERA Agg.pdf13 Feb 2018
Proforma of Allotment letterFile: Sunshine Joy C Bldg Commercial RERA Agg 1.pdf13 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LR 2 Form1 Sunshine Joy Feb 2018.pdf7 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sunshine Joy Phase 2 RERA.pdf29 Jul 2017
Certificates of CA (Form 3)File: SUNSHINE JOY Form 3.pdf29 Jul 2017
Building plan approvalFile: Sushine Joy Layout Plan LR.pdf28 Jul 2017
Layout approvalFile: Sushine Joy Layout Plan LR.pdf28 Jul 2017
PAN CardFile: Greenlife Associates Pan card.pdf28 Jul 2017
Copy of the legal title reportFile: Sunhsine Joy Search Report.pdf28 Jul 2017
Details of encumbrancesFile: Sunshine Joy Declaration.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: Sushine Joy Layout Plan LR.pdf28 Jul 2017
Building Plan Approval (IOD)File: Sushine Joy Layout Plan LR.pdf28 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Sunshine Joy Commencement Certificate.pdf28 Jul 2017
Declaration in FORM BFile: Sunshine Joy Form B.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Sunshine Joy Phase 2.pdf28 Jul 2017
Proforma of Allotment letterFile: Sunshine Joy Aggreement Declaration.pdf28 Jul 2017
OtherFile: Sunshine Completion Certificate.pdf28 Jul 2017
OtherFile: Declaration of phases.pdf28 Jul 2017
OtherFile: Form 1 Sunshine Joy Plan.pdf28 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sunshine Joy Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pirangut Bazaar13,700+ in Pune

2 kmSunshine Joy Phase 2Completed 11Lapsed / revoked 10Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: Greenlife Associates

Greenlife Associates has 1 registration on MahaRERA, including Sunshine Joy Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sunshine Joy Phase 2 is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sunshine Joy Phase 2?

The registered promoter entity is Greenlife Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sunshine Joy Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sunshine Joy Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sunshine Joy Phase 2?

The professionals named in the filing: Architect: Team Work Architects and Planner; Engineer: Hansal Parikh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sunshine Joy Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sunshine Joy Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sunshine Joy Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.