ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / SUNFLOWER REALINFRA LLP ASTER

Registered Litigation declared Others project

SUNFLOWER REALINFRA LLP ASTER

By SUNFLOWER REALINFRA LLP

RG-MH-33074 · RERA P51800080546 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Podiums (if any), 0%
38 of 50Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

SUNFLOWER REALINFRA LLP ASTER is a Others project by SUNFLOWER REALINFRA LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080546 on 16 Jun 2025. Possession is promised by 31 Dec 2028. 12 of the 50 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSUNFLOWER REALINFRA LLP ASTER
  • TypeOthers
  • Location
    • AT EXISTING 36.6 MT WIDE NEHRU ROAD
    • SANTACRUZ EAST
    • Bandra
    • Andheri
    • Mumbai Suburban
    • 400055
  • Pincode400055
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800080546
  • ReraGenie IDRG-MH-33074

Builder

  • NameSUNFLOWER REALINFRA LLP
  • Entity typePartnership

Key dates

this monthRegisteredJun 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jun 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

24%12 of 50 units booked
22.5%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ASTERNA121105050

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

ASTER: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed81

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots81
Closed/Covered75
Open Space6

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area988 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Sep 2025
LandownerVillageDistrict
RAKESH CHAMPALAL KOTHARIBandraMumbai Suburban
RISHABH RAKESH KOTHARIBandraMumbai Suburban
SHREYANSH RAKESH KOTHARIBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3224.39
Proposed, not sanctioned3,224 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANEK SMRUTI,TPS II,NEHRU ROAD,VILE PARLE - EASTMUMBAIMAHARASHTRA400 057
Estimated costRs 35.00 cr
Cost incurredRs 7.88 cr
Work done22.5%
BuildingWingEstimatedIncurred
ASTERNARs 17.50 crRs 7.88 cr
-NARs 17.50 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRITAM BIDIKAR BIDIKAR
EngineerMr Xavier PM MATHEW POOYAPPALLIL
EngineerMANISH SHAH
Chartered AccountantUDESHI & COMPANY
Chartered AccountantN A SHAH ASSOCIATES LLP
PartnerRole in project
SUNFLOWER REALINFRA LLP-

Litigation declared5

CaseCourtStatus
895/2024High Court of Judicature at BombayOngoing
2555/2025High Court of Judicature at BombayOngoing
1411 /2024City Civil Court for Greater Mumbai at DindoshiOngoing
400/2023Court of Small Causes at Mumbai, Bandra branchOngoing
401/2023Court of Small Causes at Mumbai, Bandra branchOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600155Bhakti AchrekarSUNFLOWER REALINFRA LLP23/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jun 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Quality Assurance Certificate_Aster.pdf14 Jul 2026
Withdrawal Update Form 1File: Architect Certificate Aster April 26.pdf5 May 2026
Withdrawal Update Form 2File: Engineer Certificate Aster April 26.pdf5 May 2026
Withdrawal Update Form 3File: CA CERTIFICATE-2.pdf5 May 2026
Withdrawal Update Form 1File: Architectu0027s Certificate SunFlower Realinfra LLP 30092025.pdf9 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf9 Jan 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf9 Jan 2026
Withdrawal Update Form 1File: Architectu0027s Certificate SunFlower Realinfra LLP 30092025.pdf7 Jan 2026
Withdrawal Update Form 2File: 002RERA Engineeru0027s Certificate dt01102025.pdf7 Jan 2026
Withdrawal Update Form 3File: SUNFLOWER CA CERTIFICATE DATED 17102025.pdf7 Jan 2026
Withdrawal Update Form 1File: Architectu0027s Certificate SunFlower Realinfra LLP 30092025.pdf5 Jan 2026
Withdrawal Update Form 2File: 002RERA Engineeru0027s Certificate dt01102025.pdf5 Jan 2026
Withdrawal Update Form 3File: SUNFLOWER CA CERTIFICATE DATED 17102025.pdf5 Jan 2026
Withdrawal Update Form 1File: Architectu0027s Certificate SunFlower Realinfra LLP 30092025.pdf30 Oct 2025
Withdrawal Update Form 2File: 002RERA Engineeru0027s Certificate dt01102025.pdf30 Oct 2025
Withdrawal Update Form 3File: SUNFLOWER CA CERTIFICATE DATED 17102025.pdf30 Oct 2025
Form 1File: Architect Certificate.pdf2 Sep 2025
Form 2File: Engineer's Certificate.pdf2 Sep 2025
Form 3File: CA CERTIFICATE TILL 30 JUNE 2025.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_of_Sold_and_booked_inventory.pdf2 Sep 2025
Other - LegalFile: Declaration about CTS No.pdf11 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other projects of Amal Realtors_MDS NEW.pdf11 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other projects of Amal Constructions_MDS NEW.pdf11 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other projects of Add More_MDS NEW.pdf11 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other projects of Amal Realtors_ADS NEW.pdf11 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other projects of Amal Constructions_ADS NEW.pdf11 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other projects of Add More_ADS NEW.pdf11 Jun 2025
Copy of the legal title reportFile: Title Report Updated 2.pdf10 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE Updated 3_6_25.pdf3 Jun 2025
Declaration about Commencement CertificateFile: Sunflower Form D updated.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: AC.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: AR.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: AM.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: VS.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: SPT.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: RPT.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: PPT.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: PLT.pdf2 Jun 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: AVS.pdf2 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: BANK CERTIFICATE FORMAT B UPDATED.pdf2 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf22 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Sunflower Disclosure for Secured Unsecured finance availed for the project.pdf22 Apr 2025
Layout approvalFile: Sunflower Declaration of Plot Layout.pdf21 Apr 2025
Details of encumbrances concerned to FinanceFile: Sunflower Declaration of No Financial Encumbrances.pdf21 Apr 2025
Details of encumbrances concerned to FinanceFile: Sunflower Declaration No Encumbrances.pdf21 Apr 2025
Copy of Layout Approval (in case of layout)File: Sunflower Declaration of Plot Layout.pdf21 Apr 2025
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf21 Apr 2025
Declaration in FORM BFile: Form B Developers.pdf21 Apr 2025
Other - LegalFile: Sunflower Annexure A.pdf21 Apr 2025
CERSAI detailsFile: Sunflower Self Declaration of No Security Interest on Porject.pdf21 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Sunflower Format A.pdf21 Apr 2025
Deviation Report with respect to Allotment letterFile: Declaration about No Deviation in Allotment Letter.pdf21 Apr 2025
Details of encumbrances concerned to LegalFile: Sunflower Declaration No Encumbrances.pdf21 Apr 2025
Details of encumbrances concerned to LegalFile: Sunflower Declaration of No Financial Encumbrances.pdf21 Apr 2025
Other - FinanceFile: Declaration.pdf21 Apr 2025
Other - TechnicalFile: Declaration.pdf21 Apr 2025
Other - TechnicalFile: Sunflower Annexure A.pdf21 Apr 2025
Deviation Report with respect to model copy of AgreementFile: Declaration about No Deviation in Agreement.pdf21 Apr 2025
Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf21 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Sunflower - Disclosure of Interest in other Real Estate Organisation.pdf21 Apr 2025
Building plan approvalFile: AMENDED IOD DRAWING.pdf17 Apr 2025
PAN CardFile: PAN CARD SUNFLOWER.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Engineer's Certificate.pdf17 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 1ST CC.pdf17 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: AMENDED IOD DRAWING.pdf17 Apr 2025

How this compares with Mumbai Suburban

24%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUNFLOWER REALINFRA LLP ASTER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANTACRUZ EAST6,700+ in Mumbai Suburban

2 kmSUNFLOWER REALINFRA LLP Completed 122Lapsed / revoked 72Other 137Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: SUNFLOWER REALINFRA LLP

SUNFLOWER REALINFRA LLP has 1 registration on MahaRERA, including SUNFLOWER REALINFRA LLP ASTER. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SUNFLOWER REALINFRA LLP ASTER is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUNFLOWER REALINFRA LLP ASTER?

The registered promoter entity is SUNFLOWER REALINFRA LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUNFLOWER REALINFRA LLP ASTER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SUNFLOWER REALINFRA LLP ASTER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SUNFLOWER REALINFRA LLP ASTER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUNFLOWER REALINFRA LLP ASTER?

The professionals named in the filing: Architect: PRITAM BIDIKAR BIDIKAR; Engineer: Mr Xavier PM MATHEW POOYAPPALLIL; Engineer: MANISH SHAH; Chartered Accountant: UDESHI & COMPANY; Chartered Accountant: N A SHAH ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNFLOWER REALINFRA LLP ASTER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNFLOWER REALINFRA LLP ASTER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNFLOWER REALINFRA LLP ASTER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.