SUN SUMIT NAOMI ARK
RG-MH-32716 · RERA P51800080402 · Last updated on MahaRERA portal: 10 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUN SUMIT NAOMI ARK is a Others project by Sun Sumit Venture in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800080402 on 2 Jun 2025. Possession is promised by 31 Oct 2027. 5 of the 20 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSUN SUMIT NAOMI ARK
- TypeOthers
- Location
- Church Road
- Santacruz East
- Kolekalyan
- Andheri
- Mumbai Suburban
- 400098
- Pincode400098
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800080402
- ReraGenie IDRG-MH-32716
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Jun 2025
- Promised completion31 Oct 2027
- Revised completionNone
- Buildings1 building record
- Documents filed61 files
Current status
Figures as on 10 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sun Sumit Naomi Ark | NA | 8 | 8 | 19 | 1 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.
Sun Sumit Naomi Ark: 36% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 10 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership5
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Naomi Miranda | Kolekalyan | Mumbai Suburban |
| Pearl Kloac | Kolekalyan | Mumbai Suburban |
| Netley D'Souza | Kolekalyan | Mumbai Suburban |
| Nelton D'Souza | Kolekalyan | Mumbai Suburban |
| Ninette Patel | Kolekalyan | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sun Sumit Naomi Ark | NA | Rs 7.71 cr | Rs 83.56 lakh |
| - | NA | Rs 1.05 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aashish Solanki |
| Engineer | Clint Dos Santos |
| Chartered Accountant | RS Gokani and Co |
| Chartered Accountant | Mulraj D Gala & Co |
| Partner | Role in project |
|---|---|
| Sun Sumit Venture | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Mar 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2027
Documents filed61
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 10 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 10 Feb 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 10 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 10 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 10 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 10 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 10 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 10 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 10 Feb 2026 |
| Other - FinanceFile: SUN SUMIT NAOMI ARK DECLARATION.pdf | 29 May 2025 |
| Other - FinanceFile: Undertaking for NO separate bank.pdf | 30 Mar 2025 |
| Copy of the legal title reportFile: Title Search report for Maharera Mumbai.pdf | 27 Mar 2025 |
| Declaration about Commencement CertificateFile: CC Disclosure.pdf | 25 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration of Separate Bank account.pdf | 25 Mar 2025 |
| Other - FinanceFile: Undertakaking regarding clarification on No separate RERA account.pdf | 25 Mar 2025 |
| Proforma of Agreement for saleFile: Draft AFS.pdf | 25 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 1 Other - Finance.pdf | 12 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 11 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 11 Mar 2025 |
| Other - TechnicalFile: Undertaking for multiple (2).pdf | 11 Mar 2025 |
| Layout approvalFile: Layout.pdf | 9 Mar 2025 |
| Building plan approvalFile: Amended IOD.pdf | 9 Mar 2025 |
| PAN CardFile: PAN.pdf | 9 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: non_encumbarance_certificate Legal.pdf | 9 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: non_encumbarance_certificate Financial.pdf | 9 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 9 Mar 2025 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 9 Mar 2025 |
| Declaration in FORM BFile: FORM -B.pdf | 9 Mar 2025 |
| Declaration in FORM BFile: FORM B Owner.pdf | 9 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 9 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: NAOMI ARK CC (2).pdf | 9 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended IOD.pdf | 9 Mar 2025 |
| Other - LegalFile: DA part 4 A.pdf | 9 Mar 2025 |
| Other - LegalFile: Authority Letter_Kalina.pdf | 9 Mar 2025 |
| Other - LegalFile: DA part 3C.pdf | 9 Mar 2025 |
| Other - LegalFile: DA part 3B.pdf | 9 Mar 2025 |
| Other - LegalFile: DA part 3A.pdf | 9 Mar 2025 |
| Other - LegalFile: DA part 2B.pdf | 9 Mar 2025 |
| Other - LegalFile: DA part 2A.pdf | 9 Mar 2025 |
| Other - LegalFile: DA Part 2.pdf | 9 Mar 2025 |
| Other - LegalFile: DA Part 1A-.pdf | 9 Mar 2025 |
| Other - LegalFile: DA part 1.pdf | 9 Mar 2025 |
| Other - LegalFile: un Associates with Sun Sumit Venture_Leave and Lisence Agreement final.pdf | 9 Mar 2025 |
| Other - LegalFile: SUPPLEMENTAL JOINT AGREEMENT (1).pdf | 9 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Flat Sold unsold.pdf | 9 Mar 2025 |
| CERSAI detailsFile: Undertaking Cersai.pdf | 9 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: deviation report on Allotment letter.pdf | 9 Mar 2025 |
| Details of encumbrances concerned to LegalFile: non_encumbarance_certificate Financial.pdf | 9 Mar 2025 |
| Details of encumbrances concerned to LegalFile: non_encumbarance_certificate Legal.pdf | 9 Mar 2025 |
| Other - FinanceFile: DISCLOSURE FOR SECUREDUNSECURED FINANCE AVAILED FOR THE PROJECT.pdf | 9 Mar 2025 |
| Other - FinanceFile: No separate bank account undertaking.pdf | 9 Mar 2025 |
| Other - TechnicalFile: PR Card.pdf | 9 Mar 2025 |
| Other - TechnicalFile: Undertaking for Standalone project Copy.pdf | 9 Mar 2025 |
| Other - TechnicalFile: SRO Sun Sumit NAOMI ARK.pdf | 9 Mar 2025 |
| Other - TechnicalFile: NAOMI ARK DP REMARK.pdf | 9 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation report AFS.pdf | 9 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1) Disclosure of Interest in Other Real Estate Organizations Nasar Sir.pdf | 9 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2) Disclosure of Interest in Other Real Estate Organizations Rushi Sir.pdf | 9 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 3) Disclosure of Interest in Other Real Estate Organizations Mitaram Sir.pdf | 9 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4) Disclosure of Interest in Other Real Estate Organizations Bhushan Sir.pdf | 9 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: ACCOUNT CONFIRMATION LETTER_NAOMI ARK.pdf | 9 Mar 2025 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SUN SUMIT NAOMI ARKp51800080402 | 6437/4, 6437/4/1, 6437/4/2, 6437/4/3, 6437/4/4, Church Road, Santacruz East, Kolekalyan, Andheri, Mumbai Suburban, 400098, MAHARASHTRA | - | Ongoing | Oct 2027 | Not due yet |
| Sun Sumit Deepshal | Link Road Borivali West Mumbai 400092 | 29 | Ongoing | Dec 2026 | Dec 2026 |
| Sun Sumit Jeevan Mangal | 510 to 513 TPS III Borivali West Mumbai 400092 | 19 | Ongoing | Jun 2025 | Jun 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 61 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SUN SUMIT NAOMI ARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Santacruz East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 169 registered projects within 2 km.
ALORA
KOLTE-PATIL DEVELOPERS LIMITED
GOLDEN VISTA
BLUE DIAMOND SPACES PRIVATE LIMITED
UNO
Transcon Bellaviu Private Limited
9 BKC
RESHAM SINGH DEVELOPERS LLP
Green Bay
Global Infraprojects SJ LLp
Courtyard
Royal Minerva Realty LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Sun Sumit Venture
SUN SUMIT VENTURE has 4 registrations on MahaRERA, including SUN SUMIT JEEVAN MANGAL and Sun Sumit Deepshal. Its filings disclose 7 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SUN SUMIT NAOMI ARK is delayed beyond 31 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUN SUMIT NAOMI ARK?
The registered promoter entity is Sun Sumit Venture, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUN SUMIT NAOMI ARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SUN SUMIT NAOMI ARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUN SUMIT NAOMI ARK?
The professionals named in the filing: Architect: Aashish Solanki; Engineer: Clint Dos Santos; Chartered Accountant: RS Gokani and Co; Chartered Accountant: Mulraj D Gala & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUN SUMIT NAOMI ARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback