Home / Browse projects / Raigarh, Maharashtra / SUN CITY

Registered No litigation declared Residential / Group Housing project

SUN CITY

By RAJNIR ENTERPRISES PRIVATE LIMITED

RG-MH-55077 · RERA P52000017041 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
37 of 44Construction stages doneacross 4 buildings; furthest along: Basement (if any), 0%
7 of 261Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

SUN CITY is a Residential / Group Housing project by RAJNIR ENTERPRISES PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000017041 on 4 Jul 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 254 of the 261 units on this registration are recorded sold or booked, and 37 of 44 construction stages are filed complete.

At a glance

Project

  • NameSUN CITY
  • TypeResidential / Group Housing
  • Location
    • INTERNAL ROAD
    • NEAR SHELU RAILWAY STATION
    • Damat
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000017041
  • ReraGenie IDRG-MH-55077

Builder

  • NameRAJNIR ENTERPRISES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorSWEETY NIRMAL LODHA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJul 2018First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jul 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings4 building records
  • Documents filed114 files

Current status

97%254 of 261 units booked
106.7%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA43121123
BUILDING NO 2 WING A,B,CNA767427101
BUILDING NO 3 WING A,BNA7684084
BUILDING NO 4 WING A B WINGNA7553053

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

37 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.

BUILDING NO 173%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 2 WING A,B,C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 3 WING A,B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 4 WING A B WING82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingYes75%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
BUILDING NO 2 WING A,B,C11
BUILDING NO 3 WING A,B11
BUILDING NO 4 WING A B WING11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,210 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityRaigad Zilla Parishad
Permissible FSI8485.95
Proposed, not sanctioned8,486 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchYASHODHAN CHS VALLABH BAGH LANE MUMBAI 400 077 MAHARASHTRA INDIA
Estimated costRs 17.97 cr
Cost incurredRs 19.17 cr
Work done106.7%
BuildingWingEstimatedIncurred
BUILDING NO 2 WING A,B,CNARs 7.16 crRs 7.64 cr
BUILDING NO 3 WING A,BNARs 5.47 crRs 5.84 cr
BUILDING NO 4 WING A B WINGNARs 3.36 crRs 3.59 cr
BUILDING NO 1NARs 1.08 crRs 1.15 cr
-NARs 89.84 lakhRs 95.87 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSTRUCTILIS CONSULTANTANTS PVT LTD
EngineerADHARSHILA CONSULTANTS
EngineerSK Consultants & Engineers
Chartered AccountantBHAVESH D JAIN & COMPANY
Chartered AccountantN B Sayed & Associates
PartnerRole in project
RAJNIR ENTERPRISES PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000018800Dec 2023 → Dec 2024

Reason as filed by the promoterREPL/0062/2023-24 Date :09/01/2024 Respected Sir, We highly regret to submit this declaration. we have tried our best to complete our ongoing projects “ SUN CITY “ bearing Maha RERA registration number P52000017041 located at Survey No.73/1, Opp. Village Damat, Near Shelu Railway Station, Taluka Karjat, and Dist. Raigad within the given completion date. We hereby submit that we could not complete the project in the given completion time due to following reasons. 1. Covid had started from March 2020. Due to this there were several problems like non availability of construction material, labour

EXT52000027294Dec 2023 → Dec 2025

Reason as filed by the promoterDate : 09/01/2025 Respected Sir, We highly regret to submit this declaration. we have tried our best to complete our ongoing projects “ SUN CITY “ bearing Maha RERA registration number P52000017041 located at Survey No.73/1, Opp. Village Damat, Near Shelu Railway Station, Taluka Karjat, and Dist. Raigad within the given completion date. We hereby submit that we could not complete the project in the given completion time due to following reasons. 1. Due to non-availability of labours and slow sales the speed of the project got delayed. 2) Out of the 4 Building, Building No. 1, 2 & 3 are 100% co

EA30012619652Dec 2023 → Dec 2026

Reason as filed by the promoterwe apologize for the delay in the completion of the proiect. The project work has been completed, and only the occupancy certificate (oc) is pending. we are taking the necessary steps to obtain the oc at the earliest and complete the remaining formalities. Despite these setbacks, we are working diligently to address these issues.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jun 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 - REPL.pdf21 May 2026
Withdrawal Update Form 2File: form 2 - suncity.pdf21 May 2026
Withdrawal Update Form 3File: FORM 3 - SUNCITY.pdf21 May 2026
Withdrawal Update Form 1File: FORM 1 - REPL.pdf30 Jan 2026
Withdrawal Update Form 1File: FORM 1 - REPL.pdf30 Jan 2026
Withdrawal Update Form 1File: FORM 1 - REPL.pdf30 Jan 2026
Withdrawal Update Form 2File: form 2 - suncity.pdf30 Jan 2026
Withdrawal Update Form 2File: form 2 - suncity.pdf30 Jan 2026
Withdrawal Update Form 2File: form 2 - suncity.pdf30 Jan 2026
Withdrawal Update Form 3File: FORM 3 - SUNCITY.pdf30 Jan 2026
Withdrawal Update Form 3File: FORM 3 - SUNCITY.pdf30 Jan 2026
Withdrawal Update Form 3File: FORM 3 - SUNCITY.pdf30 Jan 2026
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 architects certificate.pdf8 May 2025
Certificates of CA (Form 3)File: FORM 3 ANNEXURE D (1).pdf8 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form - 2 engineers certificate.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: GetUserDocumentFileContent.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A - ENGINEERS CERTIFICATE FOR QUALITY ASSURANCE_page-0001.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: MERGED (1).pdf15 Apr 2025
Other - TechnicalFile: PERT CHART CONSTRUCTION.pdf15 Apr 2025
Declaration in FORM BFile: Notary Affidavit cum Declaration_page-0001.pdf19 Mar 2025
Disclosure of sold/ booked inventoryFile: UNSOLD INVENTORY.pdf19 Mar 2025
Other - TechnicalFile: summary report.pdf19 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - QA - Engineer (SUNCITY).pdf19 Mar 2025
Declaration in FORM BFile: form b (affidavit cum declaration).pdf24 Jan 2025
Certificates of CA (Form 3)File: form 3 (sun city) (1).pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 31ST MARCH.pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf24 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: output (1).pdf15 Jan 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT.pdf15 Jan 2025
Details of encumbrances concerned to FinanceFile: encumbrance letter.pdf8 Jan 2025
Deviation Report with respect to Allotment letterFile: deviation letter (allotement letter).pdf8 Jan 2025
Details of encumbrances concerned to LegalFile: encumbrance letter.pdf8 Jan 2025
Deviation Report with respect to model copy of AgreementFile: deviation report (agreement for sale) (1).pdf8 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate (sun city).pdf17 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate suncity.pdf17 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE.pdf2 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 ENGINEERS CERTIFICATE.pdf2 Feb 2024
Disclosure of sold/ booked inventoryFile: P52000017041_FileName_0.pdf15 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: (karan asrani)disclosure of interest in other real estate organization.pdf15 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate organization (Rajendra).pdf15 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate organization (Sweety lodha).pdf15 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 22 TO 23.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 (SUNCITY).pdf8 Jan 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER FORMAT.pdf8 Jan 2024
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf8 Jan 2024
Proforma of Agreement for saleFile: 2.pdf8 Jan 2024
Proforma of Agreement for saleFile: 3.pdf8 Jan 2024
Proforma of Agreement for saleFile: 4 Proforma of Allotment letter.pdf8 Jan 2024
Proforma of Agreement for saleFile: 5 Proforma of Allotment letter.pdf8 Jan 2024
Proforma of Agreement for saleFile: 6 Proforma of Allotment letter.pdf8 Jan 2024
Proforma of Agreement for saleFile: 7 Proforma of Allotment letter.pdf8 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Details.pdf8 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Encumbrances Concerned to legal.pdf8 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report allotment letter.pdf8 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report agreement for sale (1).pdf8 Jan 2024
Certificates of CA (Form 3)File: CHARTERED ACCOUNT.pdf3 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEERS CERTIFICATE.pdf18 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE.pdf8 Nov 2023
Building plan approvalFile: PLAN COPY.pdf4 Aug 2023
Building Plan Approval (IOD)File: PLAN COPY.pdf4 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT LETTER.pdf22 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Suncity EC 31-03-23.pdf10 May 2023
Declaration about Commencement CertificateFile: C C COPY.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: REPORT STATEMENT OF ACCOUNT PERIOD 2018-2019.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: REPORT STATEMENT OF ACCOUNT PERIOD 2019-2020.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: REPORT STATEMENT OF ACCOUNT PERIOD 2020 - 2021.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: REPORT STATEMENT OF ACCOUNT PERIOD 2021-2022.pdf14 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf11 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf11 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architects certificate.pdf4 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 engineer certificate.pdf4 Mar 2022
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf23 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 (Architects certificate).pdf16 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER CERTIFICATE.pdf16 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Rajnir Enterprises Pvt Ltd (Society Certificate).pdf21 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Architects certificate.pdf15 Feb 2021

How this compares with Raigarh

97%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 36 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUN CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR SHELU RAILWAY STATION5,900+ in Raigarh

2 kmSUN CITYCompleted 29Lapsed / revoked 23Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: RAJNIR ENTERPRISES PRIVATE LIMITED

RAJNIR ENTERPRISES PRIVATE LIMITED has 2 registrations on MahaRERA, including SUNRISE RESIDENCY and SUN CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if SUN CITY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUN CITY?

The registered promoter entity is RAJNIR ENTERPRISES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUN CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUN CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUN CITY?

The professionals named in the filing: Architect: STRUCTILIS CONSULTANTANTS PVT LTD; Engineer: ADHARSHILA CONSULTANTS; Engineer: SK Consultants & Engineers; Chartered Accountant: BHAVESH D JAIN & COMPANY; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUN CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUN CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUN CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.