Completed No litigation declared Residential / Group Housing project

Sumit Lata

By Sumit Snehashish Venture

RG-MH-21317 · RERA P51900012481 · Last updated on MahaRERA portal: 8 Dec 2021

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Jan 2021Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 90%
0Complaints at MahaRERAon this registration
Jump to the 28 documents Report an error

Sumit Lata is a Residential / Group Housing project by Sumit Snehashish Venture in 400022, registered with MahaRERA as P51900012481 on 1 Sep 2017. The registration is recorded completed; possession was promised by 30 Jan 2021. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameSumit Lata
  • TypeResidential / Group Housing
  • Location
    • 400022
  • Pincode400022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900012481
  • ReraGenie IDRG-MH-21317

Builder

  • NameSumit Snehashish Venture
  • Entity typeOthers
  • Named personSumit woods Pvt Ltd

Key dates

this monthRegisteredSep 2017First promiseJul 2019Revised toJan 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Sep 2017
  • Promised completion30 Jan 2021
  • Revised completionRevised to 30 Jan 2021 (originally 31 Jul 2019)
  • Buildings2 building records
  • Documents filed28 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sumit Lata PHASE INA200000
Sumit Lata PHASE IINA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.

Sumit Lata PHASE I100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Sumit Lata PHASE II54%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 8 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered41
BuildingClosed/CoveredTotal
Sumit Lata PHASE I3434
Sumit Lata PHASE II77

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area791 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2023.36
Proposed, not sanctioned1,415 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCONWOOD HOUSE GEN AK VAIDYA MARG YASHODHAM MUMBAI

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPN BHOBE & ASSOCIATES
PartnerRole in project
Sumit Snehashish Venture-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900002232Jul 2019 → Jul 2020

Reason as filed by the promoterThe construction of building is completed in all aspects and we have received NOC for OC from Fire Department & are in process of applying for Occupation Certificate. We request you to grant us extension till 30.06.2020 and kindly oblige.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Aug 2020

Documents filed28

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - Sumit Lata CHSL 28102021.pdf8 Dec 2021
Architect’s Certificate on Completion of Project (Form 4)File: SSV Form 4 PDF.PDF19 Aug 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Sumit Lata PDF.pdf18 Aug 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SUMITLATA FORM 2A.PDF4 Mar 2020
Certificates of CA (Form 3)File: FORM 3 RERA CERTIFICATE SUMIT LATA_compressed.pdf25 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArhitectCertificate Sumit Lata phase1.pdf13 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArchitectCertificate Sumit Lata phase2.pdf13 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sumit Lata.pdf13 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate form 2.PDF14 Jun 2019
Certificates of CA (Form 3)File: CA Certificare Form 3 06062019.pdf14 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sumit lata phase 1 arch cert April 2019.pdf22 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sumit lata phase 2 arch cert April 2019.pdf22 Apr 2019
Certificates of CA (Form 5)File: Form 5 Sumit Snehashish venture.PDF15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Sumit Lata CC July2018.pdf31 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: SUMIT LATA CC- Receipt.PDF31 Mar 2018
Building plan approvalFile: scansssssssssssss.pdf28 Jul 2017
Layout approvalFile: scansssssssssssss.pdf28 Jul 2017
Details of encumbrancesFile: Unilateral Mortgage Deed - Sumit Sneashish Venture to HDFCL (12 CR) BOM2-2625-2016.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: scansssssssssssss.pdf28 Jul 2017
Building Plan Approval (IOD)File: scansssssssssssss.pdf28 Jul 2017
Declaration in FORM BFile: Sumit Lata Form B.PDF28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCERT - Lata 2.PDF28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sumit Lata Final Copy.PDF28 Jul 2017
Certificates of CA (Form 3)File: Form 3 Sumit Snehashish Ventures PDF- 919kb (2).pdf28 Jul 2017
Copy of the legal title reportFile: Title Certificate Sumit Snehashish Venture.PDF27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Final SSV Engineers Certificate.PDF27 Jul 2017
Proforma of Allotment letterFile: RERA Allotment letter for uploading.pdf27 Jul 2017
Proforma of Allotment letterFile: RERA Agr Sumit Lata (2).pdf27 Jul 2017

Keep Sumit Lata on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmSumit LataCompleted 21Lapsed / revoked 9Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: Sumit Snehashish Venture

Sumit Snehashish Venture has 1 registration on MahaRERA, including Sumit Lata. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if Sumit Lata is delayed beyond 30 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sumit Lata?

The registered promoter entity is Sumit Snehashish Venture, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sumit Lata?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sumit Lata?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sumit Lata?

The professionals named in the filing: Architect: PN BHOBE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sumit Lata?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sumit Lata. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sumit Lata to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.