SUMERU SHANKARA
By NARENDRA PRATAPRAI KINGRANI
RG-MH-01910 · RERA P50300022134 · Last updated on MahaRERA portal: 6 Mar 2025
Source: official MahaRERA filing
Red flags
- 2 complaints at MahaRERA
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUMERU SHANKARA is a Others project by NARENDRA PRATAPRAI KINGRANI in Amravati, Maharashtra, registered with MahaRERA as P50300022134 on 28 Aug 2019. The registration is recorded completed; possession was promised by 30 Apr 2023. The completion date has moved by 6 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NameSUMERU SHANKARA
- TypeOthers
- Location
- SWAVLAMBI NAGAR
- AMRAVATI
- Amravati (M Corp.)
- 444604
- Pincode444604
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50300022134
- ReraGenie IDRG-MH-01910
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Aug 2019
- Promised completion30 Apr 2023
- Revised completionRevised to 30 Apr 2023 (originally 30 Oct 2022)
- Buildings1 building record
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUMERU SHANKARA | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SUMERU SHANKARA: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| NIRAJ MAHESHKUMAR AGRAWAL | Amravati (M Corp.) | Amravati |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SURENDRA KINGRANI |
| Engineer | NICE CONSTRUCTION ENGINEERS |
| Chartered Accountant | VINOD VISHAL & ASSOCIATES |
| Partner | Role in project |
|---|---|
| NARENDRA PRATAPRAI KINGRANI | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Covid pendemic lockdown there has been delay in construction activity of the project due to which promoter is asking for 6 month extenstion to complete the project
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500077 | PRAVIN VINAYAKRAO KARALE | NARENDRA PRATAPRAI KINGRANI | 08/01/2025 |
| CC12500170 | MUKUND VITTHALRAO PATIL | NARENDRA PRATAPRAI KINGRANI | 18/01/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Aug 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Aug 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Nov 2023
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Doc_3722.pdf | 6 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 13 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate for Sumeru Shankara.pdf | 10 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate for Completion Sumeru Shankara.pdf | 7 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate for Completion Sumeru Shankara.pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY JUNE 22.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEPT 22.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY DEC 22.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY MARCH 23.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY JUNE 23.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEPT 23.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY DEC 23.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY MARCH 24.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY JUNE 24.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEPT 24.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEPT 24.pdf | 20 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT CERTIFICATE FOR COMPLETION SHANKARA.pdf | 20 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT CERTIFICATE FOR COMPLETION SHANKARA.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY JUNE 22.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEPT 22.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY DEC 22.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY MARCH 23.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY JUNE 23.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEPT 23.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY DEC 23.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY MARCH 24.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY JUNE 24.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEPT 24.pdf | 20 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY SEPT 24.pdf | 20 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SHANKARA COMPLETION CERTIFICATE.pdf | 24 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sumeru Shankara DEC.pdf | 1 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sumeru Shankara MARCH.pdf | 1 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 9 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 UPDATED_compressed.pdf | 9 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE 30032023.pdf | 10 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 UT Vishalakshi.pdf | 17 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf | 17 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5.pdf | 17 Dec 2022 |
| Building plan approvalFile: SHANKARA REVISED SANCTION MAP (1).pdf | 3 May 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: SHANKARA REVISED SANCTION MAP (1).pdf | 3 May 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: permit_compressed (1).pdf | 3 May 2022 |
| Declaration about Commencement CertificateFile: DECLARATION FOR COMMENCEMETN CERTIFICATE.pdf | 3 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT WORK COMPLETION 30032022.pdf | 3 May 2022 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY 31032022.pdf | 3 May 2022 |
| OtherFile: Form 3 FY 21-22 (Q1).pdf | 14 Aug 2021 |
| Building plan approvalFile: SANCTION MAP.pdf | 20 Aug 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION MAP.pdf | 20 Aug 2019 |
| Declaration in FORM BFile: FORM B AFFIDAVIT LETTER.pdf | 20 Aug 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CHARTERED ACCOUNTANT CERTIFICATE.pdf | 20 Aug 2019 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 20 Aug 2019 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE FORMAT.pdf | 20 Aug 2019 |
| Layout approvalFile: LAYOUT MAP.pdf | 19 Aug 2019 |
| PAN CardFile: PAN CARD NARENDRA KINGRANI.pdf | 19 Aug 2019 |
| Copy of the legal title reportFile: LEGAL SCRUTINY REPORT.pdf | 19 Aug 2019 |
| Details of encumbrancesFile: NON ENCUMBRANCE CERTIFICATE.pdf | 19 Aug 2019 |
| Copy of Layout Approval (in case of layout)File: LAYOUT MAP.pdf | 19 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: SANCTION LETTER PAGE 1.pdf | 19 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: SANCTION LETTER PAGE 2.pdf | 19 Aug 2019 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SUMERU ASHTA | PREM VIHAR AMRAVATI | 3 | Completed | Feb 2017 | Late, Apr 2017 |
| SUMERU TULSI | SHANKAR NAGAR AMRAVATI | 3 | Completed | Mar 2016 | Late, Aug 2016 |
| SUMERU SHRADDHA | T T NAGAR NEAR SAROJ COLONY AMRAVATI | 6 | Completed | Jun 2015 | Late, Nov 2015 |
| SUMERU RESIDENCY | GODAVARI COLONY OLD BYPASS MIDC ROAD AMRAVATI | 9 | Completed | Mar 2015 | Late, Aug 2015 |
| SUMERU ASHIRWAD | SITARAMBABA COLONY JEWAD AMRAVATI | 6 | Completed | Mar 2015 | Late, Jul 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Amravati
Computed across the 450+ Amravati projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
Keep SUMERU SHANKARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMRAVATI450+ in Amravati
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
VEDAH PHASE 1
TRENDBUILT LIFESPACES LLP
Madhavam Heights
Sky Line Infra Vision
JANNAT COMPLEX
MOHAMMAD AAMIR AHMAD
VIJAY FORTUNE
VIJAY PARANJAPE ESTATE LLP
Dream Imperia
Vilas Ramrao Gawai
SHREE GAJANAN ENCLAVE
AJAY NAMDEORAO DAMBALE
See every Amravati project, with the district possession charts
Builder: NARENDRA PRATAPRAI KINGRANI
NARENDRA PRATAPRAI KINGRANI has 2 registrations on MahaRERA, including SUMERU MANGALAM and SUMERU SHANKARA. Its filings disclose 9 earlier MahaRERA projects: declares 0 of 9 past projects completed on time. Read the full track record. See more projects on the Amravati district page.
Frequently asked questions
What are my rights if SUMERU SHANKARA is delayed beyond 30 Apr 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUMERU SHANKARA?
The registered promoter entity is NARENDRA PRATAPRAI KINGRANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUMERU SHANKARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SUMERU SHANKARA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SUMERU SHANKARA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUMERU SHANKARA?
The professionals named in the filing: Architect: SURENDRA KINGRANI; Engineer: NICE CONSTRUCTION ENGINEERS; Chartered Accountant: VINOD VISHAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUMERU SHANKARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback