Home / Browse projects / Pune, Maharashtra / SUKRUTI

Completed No litigation declared Residential / Group Housing project

SUKRUTI

By SHREE SIDDHIVINAYAK CONSTRUCTION

RG-MH-22778 · RERA P52100032211 · Last updated on MahaRERA portal: 27 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SUKRUTI is a Residential / Group Housing project by SHREE SIDDHIVINAYAK CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100032211 on 15 Dec 2021. The registration is recorded completed; possession was promised by 31 Mar 2023.

At a glance

Project

  • NameSUKRUTI
  • TypeResidential / Group Housing
  • Location
    • TALEGAON DABHADE
    • Talegaon Dabhade (M Cl)
    • Mawal
    • Pune
    • 410507
  • Pincode410507
  • RERA no.P52100032211
  • ReraGenie IDRG-MH-22778

Builder

  • NameSHREE SIDDHIVINAYAK CONSTRUCTION
  • Entity typePartnership
  • PartnerSARIKA GANESH KAKADE
  • Other registrations6 more →
  • Completed5 of 7
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2021PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Dec 2021
  • Promised completion31 Mar 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA50000
B WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed59

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots59
Open Space59
BuildingOpen SpaceTotal
A WING3131
B WING2828

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,296 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ASHWINI CO-OPERATIVE HOUSING SOCIETY LTDPune (M Corp.)Pune

Approvals and building plan

Permissible FSI2604.58
Proposed, not sanctioned2,605 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHAM SMRUTI DHOTRE CHAMBERS OPP ST DEPO TALEGAON DABHADE PUNE 410507

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHREE DESIGNS ENGINEERS AND PLANNERS
EngineerPRASANNA P VHANSHETTY
Chartered AccountantANITA LAXMAN LIMAYE
PartnerRole in project
SHREE SIDDHIVINAYAK CONSTRUCTION-

Litigation declared1

CaseCourtStatus
120/2020/2020DISTRICT JUDGE PUNERCA ORDER PASSED IN FAVOUR OF PROMOTOR

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Mar 2023

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 SUKRUTI.pdf27 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD BOOKED INVE.pdf14 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SUKRUTI SOCIETY REGISTRATION CERTIFICATE.pdf14 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SUKRUTI 1.pdf8 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1 BLDG A.pdf29 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1 BLDG B.pdf29 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form 2 BLDG A.pdf29 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form 2 BLDG B.pdf29 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A BLDG A.pdf29 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A BLDG B.pdf29 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPANCY CERTIFICATE.pdf29 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE SUKRUTI.pdf24 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SUKRUTI MAR 22 FORM 5.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1 BLDG A.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1 BLDG B.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form 2 BLDG A.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form 2 BLDG B.pdf28 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A BLDG A.pdf28 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A BLDG B.pdf28 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf28 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: A FORM NO 2A.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: B FORM NO 2A.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A A.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A B.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A A.pdf25 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A B.pdf25 Jan 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD BOOKED INVENTERY (WING WISE)-sukrut.pdf25 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICAT 30062022.pdf25 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICAT 30092022.pdf25 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Orsanizations GK.pdf25 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Orsanizations-SK.pdf25 Jan 2023
Proforma of Agreement for saleFile: 7_RERA DRAFT AGREEMENT - SUKRUTI - FINAL.pdf25 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account For real estate project.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1 A.pdf13 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1B.pdf13 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form 2A.pdf13 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form 2B.pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICAT SUKRUTI.pdf13 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A FORM 1.pdf29 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B FORM 1.pdf29 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Form 1.pdf29 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B Arch Form 1.pdf29 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A FORM 2.pdf29 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B FORM 2.pdf29 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Form 2.pdf29 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B Eng Form 2.pdf29 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CRETIFICATE.pdf29 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf29 Aug 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER - SUKRUTI - revised-AFTER CASE RESULTS.pdf23 Jul 2022
Copy of the legal title reportFile: REVISED SEARCH REPORT SUKRUTI.pdf22 Jul 2022
Proforma of Allotment letterFile: Allotment_Letter SUKRUTI.pdf9 Dec 2021
Copy of the legal title reportFile: SEARCH REPORT - SUKRUTI -REVISED WITH 7 12.pdf8 Dec 2021
Details of encumbrancesFile: ENCUMBERANCE LETTER-SUKRUTI- REVISED.pdf8 Dec 2021
Declaration about Commencement CertificateFile: FORM D - SUKRUTI-REVISED.pdf8 Dec 2021
Declaration in FORM BFile: FORM B - SUKRUTI-DEVELOPERS - REVISED.pdf8 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE_SUKRUTI A_WING-REVISED.pdf8 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE_SUKRUTI B_WING-REVISED.pdf8 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_SUKRUTI A_WING-REVISED.pdf8 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_SUKRUTI B_WING-REVISED.pdf8 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report_200225229625_For_Asset_Based_Search_03_12_2021_17_04_58_524.pdf8 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_SUKRUTI REGISTRATION-RECT.pdf8 Dec 2021
Layout approvalFile: 13_LAYOUT_SUKRUTI PROJECT.pdf27 Nov 2021
Building plan approvalFile: 14_A_WING_LAYOUT_SUKRUTI.pdf27 Nov 2021
Building plan approvalFile: 15_B_WING_LAYOUT_SUKRUTI.pdf27 Nov 2021
PAN CardFile: PANCARD FIRM -SHREE SIDDHIVINAYAK CONSTRUCTION.pdf27 Nov 2021
Copy of Layout Approval (in case of layout)File: 13_LAYOUT_SUKRUTI PROJECT.pdf27 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 14_A_WING_LAYOUT_SUKRUTI.pdf27 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: 15_B_WING_LAYOUT_SUKRUTI.pdf27 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: 9_COMMENCEMENT CERTIFICATE - 43 TO 48.pdf27 Nov 2021
Proforma of Allotment letterFile: 7_RERA DRAFT AGREEMENT - SUKRUTI - FINAL.pdf27 Nov 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SUKOOLSHRI SWAMI SAMARTH NAGAR TALEGAON DABHADE 410507144CompletedMay 2018May 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUKRUTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALEGAON DABHADE13,700+ in Pune

Builder: SHREE SIDDHIVINAYAK CONSTRUCTION

SHREE SIDDHIVINAYAK CONSTRUCTION has 7 registrations on MahaRERA, including SUKOOL and LAVISH LEGEND D AND E. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SUKRUTI is delayed beyond 31 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUKRUTI?

The registered promoter entity is SHREE SIDDHIVINAYAK CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUKRUTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUKRUTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUKRUTI?

The professionals named in the filing: Architect: SHREE DESIGNS ENGINEERS AND PLANNERS; Engineer: PRASANNA P VHANSHETTY; Chartered Accountant: ANITA LAXMAN LIMAYE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUKRUTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUKRUTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUKRUTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.