Home / Browse projects / Mumbai Suburban, Maharashtra / SUDHANSHU HEIGHTS
SUDHANSHU HEIGHTS
By SUDHANSHU INFRASTRUCTURES PVT LTD
RG-MH-57024 · RERA P51800019314 · Last updated on MahaRERA portal: 27 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 57 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SUDHANSHU HEIGHTS is a Others project by SUDHANSHU INFRASTRUCTURES PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800019314 on 23 Jan 2019. Possession is promised by 31 Mar 2027. The completion date has moved by 57 months from the original filing. 21 of the 50 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSUDHANSHU HEIGHTS
- TypeOthers
- Location
- DATAR COLONY
- BHANDUP EAST
- Kurla
- Mumbai Suburban
- 400042
- Pincode400042
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800019314
- ReraGenie IDRG-MH-57024
Builder
- NameSUDHANSHU INFRASTRUCTURES PVT LTD
- Entity typeCompany
- CINU45400MH2008PTC177661
- GSTIN27AALCS5135L1ZW
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- Managing DirectorABHAYJEET SAKALNARAYAN DUBEY
- DirectorPINKY ABHAYJEET DUBEY
- Other registrations5 more →
- Completed2 of 6
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jan 2019
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 30 Jun 2022)
- Buildings1 building record
- Documents filed59 files
Current status
Figures as on 27 Jun 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUDHANSHU HEIGHTS CO-OP HSG SOC LTD | NA | 12 | 12 | 43 | 7 | 50 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.
SUDHANSHU HEIGHTS CO-OP HSG SOC LTD: 69% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R P ASUNDARIA |
| Engineer | VINAYAK CHOPDEKAR & ASSOCIATES |
| Chartered Accountant | SURJI CHHEDA |
| Chartered Accountant | Kapure & Kapure |
| Partner | Role in project |
|---|---|
| SUDHANSHU INFRASTRUCTURES PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Covid-19 lockdown there were labour shortages at site. As the project is a small project and because of lockdown restrictions we couldn't allow labour to stay at site and work therefore we have to brings labour from outsite to work at site. And because of such issues at site the labour were not ready to work and due to which contraction delay took place.
Reason as filed by the promoterThe current facts of the case are being explained hereunder. We started construction work in full swing. Quality of the construction is our primary preference and therefore we do not compromise with the quality of construction over speed of the construction. Therefore, as per the given circumstances, the construction work progressed. It may be noted that the construction work of the project is almost complete and internal work. This fact is evident from the Architect Certificate that is Form 1 as on 30/06/2026. The delay was mainly on the account of the delay in completion of the parking tower
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000303199 | MAHESH CHINTAMANI PRADHAN | C.A. TO OWNER SUDHANSHU HEIGHTS CHS. LTD.. | 01/11/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Jan 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Jan 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Jan 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: FORM 3 MARCH-25_compressed.pdf | 27 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold March-25.pdf | 27 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2022.pdf | 9 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2023 Heights.pdf | 9 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2024 heights.pdf | 9 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024 Heights.pdf | 9 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2024 Heights.pdf | 9 Jun 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 24 heights.pdf | 9 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Disolsure of Sold March-22.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of sold March-23.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold March-24.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold June-24.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold Sep-24.pdf | 8 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold Dec-24.pdf | 8 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 MARCH-24 SH.pdf | 15 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 JUNE-24 SH.pdf | 15 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 SEP-24 SH.pdf | 15 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 DEC-24 SH.pdf | 15 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A Sudhanshu Heights March-23.pdf | 5 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Sudhanshu Heights March-24.pdf | 5 Mar 2025 |
| Certificates of CA (Form 3)File: Signed Form 3 - March 22_compressed.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Signed Form 3 - March 23.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Signed Form 3 - March 24_compressed.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Signed Form 3 - June 24.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Signed Form 3 - Sept 24.pdf | 4 Mar 2025 |
| Certificates of CA (Form 3)File: Signed Form 3 - Dec 24_compressed.pdf | 4 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-01 -31032022.pdf | 26 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-01 -31032022.pdf | 26 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: wing C - form 5.pdf | 3 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of interest in real estate.pdf | 27 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 SHUDHANDHU HEIGHT (1).PDF | 27 Feb 2023 |
| Certificates of CA (Form 3)File: form 3 20-21.PDF | 13 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 20-21.pdf | 13 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM -2A 21-22.pdf | 6 Jul 2022 |
| Declaration about Commencement CertificateFile: Format - D.pdf | 5 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Book Inventory.pdf | 5 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Heights - 122021.pdf | 7 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2- Height -122021-compressed.pdf | 7 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-01 -31032020.pdf | 25 Feb 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 -31032020.pdf | 25 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 SH.pdf | 24 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Letter for Form 5.pdf | 21 Feb 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A NEW.pdf | 14 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5.PDF | 6 Feb 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form-2A_compressed (1).pdf | 30 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 arch cft final RERA _2_ 6-11-2019.pdf | 14 Nov 2019 |
| Layout approvalFile: Layout.pdf | 15 Jan 2019 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 15 Jan 2019 |
| Certificates of CA (Form 3)File: Form 3.PDF | 15 Jan 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: IODmerged--compressed.pdf | 12 Jan 2019 |
| Building plan approvalFile: Zero FSI Plan-3-12-18.pdf | 2 Jan 2019 |
| PAN CardFile: Sudhanshu Pan Card.pdf | 2 Jan 2019 |
| Copy of the legal title reportFile: Title Certificate compressed.pdf | 2 Jan 2019 |
| Details of encumbrancesFile: Encumbrance letter.pdf | 2 Jan 2019 |
| Building Plan Approval (IOD)File: Zero FSI Plan-3-12-18.pdf | 2 Jan 2019 |
| Declaration in FORM BFile: affidavit cum Declaration.pdf | 2 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-compressed.pdf | 2 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-compressed.pdf | 2 Jan 2019 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 2 Jan 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ANURAG CHS LTD | PLOT NO 64 DAMALE COLONY DATAR COLONY ROAD OPP MUMBAI BANK KANJUR MARG E MUMBAI 400042 | 31 | Completed | Jul 2017 | Mar 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SUDHANSHU HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHANDUP EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 338 registered projects within 2 km.
Runwal Meadows-Daisy
Evie Real Estate Private Limited
Runwal Commerz - Tower 1
Evie Real Estate Private Limited
Flora
UVK Divine Realty
Runwal Avenue Wing-J
Susneh Infrapark Private Limited
Runwal Avenue Wing K
Susneh Infrapark Private Limited
Runwal Avenue Wing - M
Susneh Infrapark Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SUDHANSHU INFRASTRUCTURES PVT LTD
SUDHANSHU INFRASTRUCTURES PVT LTD has 6 registrations on MahaRERA, including SUDHANSHU IMPERIA and VISHNU BHASKAR CHS LTD. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SUDHANSHU HEIGHTS is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SUDHANSHU HEIGHTS?
The registered promoter entity is SUDHANSHU INFRASTRUCTURES PVT LTD, a company as per the filing. Its CIN U45400MH2008PTC177661 and GSTIN 27AALCS5135L1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SUDHANSHU HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SUDHANSHU HEIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SUDHANSHU HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SUDHANSHU HEIGHTS?
The professionals named in the filing: Architect: R P ASUNDARIA; Engineer: VINAYAK CHOPDEKAR & ASSOCIATES; Chartered Accountant: SURJI CHHEDA; Chartered Accountant: Kapure & Kapure. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUDHANSHU HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback