Red flags

  • Completion date moved by 17 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 17 months from the original
41 of 66Construction stages doneacross 6 buildings; furthest along: Installation of Lifts, 90%
3 of 8Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

STELLAR 8 is a Residential / Group Housing project by Iraah Lifespaces LLP in Pune, Maharashtra, registered with MahaRERA as P52100049733 on 24 Feb 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 17 months from the original filing. 5 of the 8 units on this registration are recorded sold or booked, and 41 of 66 construction stages are filed complete.

At a glance

Project

  • NameSTELLAR 8
  • TypeResidential / Group Housing
  • Location
    • GOLD VALLEY
    • TUNGARLI
    • Lonavala (M Cl)
    • Mawal
    • Pune
    • 410405
  • Pincode410405
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049733
  • ReraGenie IDRG-MH-38949

Builder

  • NameIraah Lifespaces LLP
  • Entity typePartnership
  • PartnerVIKAS SATISH SUTARIA

Key dates

this monthRegisteredFeb 2023First promiseJul 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Jul 2025)
  • Buildings6 building records
  • Documents filed62 files

Current status

62%5 of 8 units booked

Figures as on 26 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-1NA21101
B-2 / B-3NA21202
A-4NA21101
A-5NA21101
A-6NA21101
C-7 / C-8NA21202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 26 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

41 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Installation of Lifts, at 90%.

A-136%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B-2 / B-391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A-490%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
A-589%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
A-663%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C-7 / C-849%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6
BuildingClosed/CoveredTotal
A-111
B-2 / B-311
A-411
A-511
A-611
C-7 / C-811

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,990 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityLonavala Municipal Council
Permissible FSI1496.24
Proposed, not sanctioned1,462 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS V Road Borivali W Mumbai 400092

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectrajesh chouhan
EngineerPrashant Prabhkar Shinde
Chartered AccountantKetan Shah & co
Chartered AccountantArpit Parikh & Co
PartnerRole in project
Iraah Lifespaces LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26062501805Jul 2025 → Dec 2026

Reason as filed by the promoterDue to the financial crisis and also due to severe weather conditions during the monsoon, procurement of materials was delayed which also affected the work force availability on the site and was significantly impacted. Hence the project was delayed from the RERA delivery timeline i.e. 31.07.2025. Now we have received the Part Occupation Certificate for Bungalow no Stellar 8/ 1- B-2, Stellar 8/ 1- B-3, Stellar 8/ 1- A-4 & Stellar 8/ 1- A-5 of the said project as on 12.09.2024 (OC copy uploaded on the site) We request you to kindly consider and allow for the delivery date extension on the RERA w

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 3File: CA 2025.pdf26 Jun 2025
Form 1File: Arch Certificate March 2025.pdf26 Jun 2025
Form 2File: Eng March 2025.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Declaration Sold - Unsold.pdf26 Jun 2025
Form 1File: Arch Certificate December 2024.pdf26 Jun 2025
Form 2File: Eng December 2024.pdf26 Jun 2025
Form 3File: CA December 2024.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Declaration Sold - Unsold.pdf26 Jun 2025
Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (2).pdf26 Jun 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (1).pdf26 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA stellar.pdf17 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) (2).pdf28 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf15 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certiicate.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Q7.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch 311223.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch 310324.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch 300624.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cerificate 300923.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 300923.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 311223.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 310324.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 300624.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng 310324.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Stellar 8 311223.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Stellar 8 311223.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Stellar 8 300923.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng 300624.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 310323.pdf10 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 300623.pdf10 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng 3103 Stellar 8.pdf10 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng 3006 Stellar 8.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 3103 Stellar 8.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA 3006 Stellar 8.pdf10 Oct 2023
Declaration about Commencement CertificateFile: Form D CC.pdf22 Feb 2023
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (4).pdf24 Jan 2023
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (4).pdf24 Jan 2023
Other - TechnicalFile: Form D lonavala.pdf24 Jan 2023
Building plan approvalFile: Sanctioned Plan.pdf10 Jan 2023
Building plan approvalFile: Sanctioned Plan Section.pdf10 Jan 2023
PAN CardFile: Iraah Lifespaces LLP PAN.pdf10 Jan 2023
Copy of the legal title reportFile: Title Report-1.pdf10 Jan 2023
Details of encumbrances concerned to FinanceFile: 1A 1B.pdf10 Jan 2023
Details of encumbrances concerned to LegalFile: 1A 1B.pdf10 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan.pdf10 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan Section.pdf10 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf10 Jan 2023
Declaration in FORM BFile: Form B Affidavit.pdf10 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects certficate.pdf10 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng.pdf10 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf10 Jan 2023
CERSAI detailsFile: CERSAI.pdf10 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf10 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf10 Jan 2023
Proforma of Agreement for saleFile: AFS Sanaya Iraah Lonavala as per rera.pdf10 Jan 2023
Proforma of Allotment letterFile: Draft Allotment Letter.pdf10 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration bank details.pdf10 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation t Allotment.pdf10 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation to AFS.pdf10 Jan 2023

How this compares with Pune

62%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 17 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep STELLAR 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TUNGARLI13,700+ in Pune

2 kmSTELLAR 8Completed 3Lapsed / revoked 4Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Iraah Lifespaces LLP

Iraah Lifespaces LLP has 1 registration on MahaRERA, including STELLAR 8. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if STELLAR 8 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of STELLAR 8?

The registered promoter entity is Iraah Lifespaces LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in STELLAR 8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for STELLAR 8?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at STELLAR 8?

The professionals named in the filing: Architect: rajesh chouhan; Engineer: Prashant Prabhkar Shinde; Chartered Accountant: Ketan Shah & co; Chartered Accountant: Arpit Parikh & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STELLAR 8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STELLAR 8. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STELLAR 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.