Home / Browse projects / Pune, Maharashtra / GAGAN NULIFE PHASE 2

Registered No litigation declared Residential / Group Housing project

GAGAN NULIFE PHASE 2

By GAGAN LIFESPACE

RG-MH-12237 · RERA P52100002941 · Last updated on MahaRERA portal: 25 Aug 2026

Source: official MahaRERA filing

Red flags

  • 21 complaints at MahaRERA
  • Completion date moved by 90 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 90 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
29 of 129Units unsoldnot recorded sold or booked
21Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

GAGAN NULIFE PHASE 2 is a Residential / Group Housing project by GAGAN LIFESPACE in Pune, Maharashtra, registered with MahaRERA as P52100002941 on 4 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 90 months from the original filing. 100 of the 129 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 21 complaints are on record with the regulator.

At a glance

Project

  • NameGAGAN NULIFE PHASE 2
  • TypeResidential / Group Housing
  • Location
    • Pune Mumbai old highway
    • Kamshet
    • Kusgaon Kh.
    • Mawal
    • Pune
    • 410405
  • Pincode410405
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100002941
  • ReraGenie IDRG-MH-12237

Builder

  • NameGAGAN LIFESPACE
  • Entity typePartnership
  • PartnerUNNATI LIFESPACE LLP THROUGH ITS AUTHORISED PARTNER NIKUNJ ARUN SANGHVI
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed68 files

Current status

78%100 of 129 units booked
85.5%Work done, per cost certificate

Figures as on 25 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BUILDINGNA14101290129

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

C BUILDING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,999 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority Pune
Permissible FSI6696.91
Proposed, not sanctioned6,697 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEAST STREET CAMP PUNE
Estimated costRs 24.85 cr
Cost incurredRs 21.24 cr
Work done85.45%
BuildingWingEstimatedIncurred
C BUILDINGNARs 21.89 crRs 20.79 cr
-NARs 2.97 crRs 44.49 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS TARWADI
ArchitectSubha Architects
EngineerG A BHILARE CONSULTANTS PVT LTD
EngineerPatil N.S.
Chartered AccountantMilani & Associates
Chartered AccountantSCT & Company
PartnerRole in project
GAGAN LIFESPACE-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001469Dec 2019 → Dec 2020

Reason as filed by the promoterDear Sir, The project Gagan Nulife Phase 2 is registered with RERA Authority under Registration no P52100002941 on 04/10/2017 wherein, the date of completion of Gagan Nulife Phase 2 is declared as 31st December 2019. We have initiated booking in the said project in the month of August 2015 and proposes the customers to book the units in pre-launch offer. At the time of Launch, we got remarkable response from the customers wherein about 73 units were booked out of total 128 units. Looking to amazing response we registered the said project with RERA Authority & declared the date of completion as

EXT52100010371Dec 2019 → Mar 2022

Reason as filed by the promoterThe project is delayed due to Covid Pandemic & lockdown. The project is a senior Citizen project wherein all flats are allotted to only customers who are above 50 years of Age, As phase one is completed wherein around 200 families are residing & to take care of their safety precautions stay of labors on site was not allowed until there vaccinations drive was not carried out. This resulted in delay of construction activity of Phase 2 so now we are applying for extension upto 31/03/2022 with consent letters of Allottees

EA17062621402Dec 2019 → Jun 2027

Reason as filed by the promoterThe project is delayed due to Covid Pandemic & lockdown. The project is a senior Citizen project wherein all flats are allotted to only customers who are above 50 years of Age, As phase one is completed wherein around 200 families are residing & to take care of their safety precautions stay of labors on site was not allowed until there vaccinations drive was not carried out. This resulted in delay of construction activity of Phase 2 so now we are applying for extension upto 30/06/2027 with consent letters of Allottees

Complaints filed with MahaRERA21

Case no.ComplainantRespondentFiled
CC005000000116899AJIT PRABHAKAR GOKHALEM/S Gagan Lifespace25/04/2022
CC005000000117080Krishna ShahGagan Lifespaces09/05/2022
CC005000000137168Vijay Balwant MahindrakarGagan Lifespace31/05/2022
CC005000000147229Kavita Kirti AsherM/s. Gagan Lifespace13/06/2022
CC005000000147234Kavita Kirti AsherM/s. Gagan Lifespace13/06/2022
CC005000000167356Gautam LohanaGagan Lifespaces18/07/2022
CC005000000167437Anil Mohanrao BelleGagan Lifespaca10/08/2022
CC005000000167438Vijay Sadashiv MahamuniGagan Lifespaca10/08/2022
CC005000000167477Santosh Deoo MedhekarGagan Lifespace26/08/2022
CC005000000177682Hilda Gautam ShahGagan Lifespaca14/10/2022
CC005000000177715Mildred D'souzaGagan Lifespace26/10/2022
CC005000000198063Aparna Madhu FernandesGagan Lifespace10/01/2023
CC005000000198128sunil kumar Bhagwati prasad vermaGagan Lifespace16/01/2023
CC005000000218318Michael Vincent FernandesGagan Lifespace14/02/2023
CC005000000228325Gita Prem SethiGagan Lifespace16/02/2023
CC005000000238508Bhojwani Indira RGagan Lifespace20/03/2023
CC005000000238510Sastry Narsimhadevara Kameswara HUFGagan Lifespace20/03/2023
CC005000000258855Kevin Sudesh Oliveira FernandesM/s Gagan Lifespace31/05/2023
CC005000000258907GAGAN NULIFE 'C' BUILDING RESIDENTS ASSOCIATIONGagan Lifespace24/05/2023
CC005000000269524Smita Arunkumar VoraGagan Lifespace01/10/2023
CC005000000269525Smita Arunkumar VoraGagan Lifespace01/10/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q1.pdf25 Aug 2026
Withdrawal Update Form 1File: Form 1 Q2.pdf25 Aug 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf25 Aug 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf25 Aug 2026
Withdrawal Update Form 1File: Form 1 2026-27 Q1.pdf25 Aug 2026
Withdrawal Update Form 2File: Form 2 Q1.pdf25 Aug 2026
Withdrawal Update Form 2File: Form 2 Q2.pdf25 Aug 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf25 Aug 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf25 Aug 2026
Withdrawal Update Form 2File: Form 2 2026-27 Q1.pdf25 Aug 2026
Withdrawal Update Form 3File: Form 3 F.pdf25 Aug 2026
Withdrawal Update Form 3File: Form 3 F.pdf25 Aug 2026
Withdrawal Update Form 3File: Form 3 F.pdf25 Aug 2026
Withdrawal Update Form 3File: Form 3 F.pdf25 Aug 2026
Withdrawal Update Form 3File: Form 3 Nulife Phase 2.pdf25 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 31-03-26.pdf25 Aug 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf1 Aug 2026
Disclosure of sold/ booked inventoryFile: Gagan Nulife sold unsold data sheet.pdf11 Apr 2025
Declaration in FORM BFile: Form B.pdf17 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf17 Feb 2025
Certificates of CA (Form 3)File: Form 3 Nulife_compressed.pdf17 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf17 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 3 Nulife_compressed.pdf17 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf17 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A Engineers Quality Assurance Certificate.pdf17 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Nulife.pdf17 Feb 2025
Declaration in FORM BFile: Form B Nulife Ph 2.pdf14 Aug 2023
Disclosure of sold/ booked inventoryFile: Nulife Sold Unsold Inventory.pdf2 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Lifespace Undertaking for Form 5.pdf29 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nulife Ph 2 Arch certificate 16012023.pdf30 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nulife Ph 2 Engg certificate 16012023.pdf30 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase 2 RERA LETTER.pdf30 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Nulife Ph 2 Arch certificate 24122021.pdf4 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NULIFE RERA C WING.pdf9 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Gagan Lifespace Annual Report 18-19.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Gagan Lifespace Annual Report_19-20.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Gagan Lifespace Annual Report 20-21.pdf30 Jul 2021
Declaration about Commencement CertificateFile: Declaration About CC Certificate.pdf29 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf29 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold inventory.pdf29 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Nulife Ph 2 Arch certificate 06042021.pdf8 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Nulife Ph 2 Arch certificate 29012021.pdf8 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Nulife Ph 2 Arch certificate 29102020.pdf11 Nov 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Nulife Ph 2 Arch Certificate 19122019.pdf25 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Nulife Phase 2 Arch Certificate 29062019.pdf4 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PH 2 04-05-2019.pdf9 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Nulife Architect Certificate Phase 2 19122018.pdf20 Dec 2018
Form 2AFile: Nulife Quality Assurance certificate Phase 2.PDF20 Dec 2018
Certificates of CA (Form 5)File: Gagan Nulife Phase 2 Form 5.pdf4 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PH 2 03092018.pdf4 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PH 2 09052018.pdf10 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Gagan Nulife Ph 2.pdf19 Feb 2018
Details of encumbrancesFile: Encumbrance Nulife.pdf6 Dec 2017
Building plan approvalFile: C 8TH FLOOR.pdf29 Jul 2017
Layout approvalFile: NuLife Phasing - FINAL.pdf29 Jul 2017
Building plan approvalFile: C 1ST FLOOR.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: NuLife Phasing - FINAL.pdf29 Jul 2017
Building Plan Approval (IOD)File: C 1ST FLOOR.pdf29 Jul 2017
Building Plan Approval (IOD)File: C 8TH FLOOR.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: PMRD Letter 28-07-2017.pdf29 Jul 2017
Declaration in FORM BFile: B- Form Phase II.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer cert ph 2.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE PH 2.pdf29 Jul 2017
Proforma of Allotment letterFile: Final Phase II Gagan Nulife Rera_FP.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE PH 2.pdf28 Jul 2017
PAN CardFile: Gagan Lifespace PAN.pdf27 Jul 2017
Copy of the legal title reportFile: TITLE REPORT.pdf27 Jul 2017
Details of encumbrancesFile: Mortgage Deed Index II.pdf27 Jul 2017

How this compares with Pune

78%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 90 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAGAN NULIFE PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kamshet13,700+ in Pune

2 kmGAGAN NULIFE PHASE 2Completed 3Lapsed / revoked 4Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: GAGAN LIFESPACE

GAGAN LIFESPACE has 5 registrations on MahaRERA, including GAGAN NULIFE PHASE 1 and GAGAN NULIFE PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GAGAN NULIFE PHASE 2 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAGAN NULIFE PHASE 2?

The registered promoter entity is GAGAN LIFESPACE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAGAN NULIFE PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GAGAN NULIFE PHASE 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GAGAN NULIFE PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAGAN NULIFE PHASE 2?

The professionals named in the filing: Architect: VILAS TARWADI; Architect: Subha Architects; Engineer: G A BHILARE CONSULTANTS PVT LTD; Engineer: Patil N.S.; Chartered Accountant: Milani & Associates; Chartered Accountant: SCT & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAGAN NULIFE PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAGAN NULIFE PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAGAN NULIFE PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.