STELLA F3

By DMK INFRASTRUCTURE PVT LTD

RG-MH-55195 · RERA P52100054729 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
8 of 11Construction stages donefurthest along: Internal walls, 90%
16 of 45Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

STELLA F3 is a Commercial project by DMK INFRASTRUCTURE PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100054729 on 6 Feb 2024. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 29 of the 45 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSTELLA F3
  • TypeCommercial
  • Location
    • Moshi Alandi Road
    • Dudulgaon
    • Moshi
    • Mulshi
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100054729
  • ReraGenie IDRG-MH-55195

Builder

  • NameDMK INFRASTRUCTURE PVT LTD
  • Entity typeCompany
  • Managing DirectorDINESH MANSUKHLAL KUCHERIA
  • Other registrations6 more →
  • Completed2 of 7

Key dates

this monthRegisteredFeb 2024First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2024
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed74 files

Current status

64%29 of 45 units booked
44.9%Work done, per cost certificate

Figures as on 28 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
STELLA F3NA4404545

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

STELLA F3: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area525 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI1736.48
Proposed, not sanctioned1,736 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 3/4,SECTOR 7, SHOPPING CENTRE, VASHI, NAVI MUMBAI, MAHARASHTRA - 400703
Estimated costRs 6.10 cr
Cost incurredRs 2.73 cr
Work done44.85%
BuildingWingEstimatedIncurred
STELLA F3NARs 5.77 crRs 2.73 cr
-NARs 32.52 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SUNIL NAWALE
EngineerMr. Vishal Ingle
EngineerSWAPNIL BONDAR
Chartered AccountantDAPNS & Co. Chartered Accountants
Chartered AccountantGANDHI KALE
PartnerRole in project
DMK INFRASTRUCTURE PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31032620493Mar 2026 → Mar 2027

Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 31/03/2027 to complete the project

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000340739Pritee Abhishek GaikwadDMK INFRASTRUCTURE PVT LTD07/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate F3.pdf28 May 2026
Withdrawal Update Form 2File: Engineers Certificate F3.pdf28 May 2026
Withdrawal Update Form 3File: CA Certificate F3 (1)_compressed.pdf28 May 2026
Withdrawal Update Form 1File: Architect Certificate D3.pdf12 May 2026
Withdrawal Update Form 1File: Architect Certificate F3.pdf12 May 2026
Withdrawal Update Form 2File: Engineers Certificate F3.pdf12 May 2026
Withdrawal Update Form 2File: Engineers Certificate F3.pdf12 May 2026
Withdrawal Update Form 3File: CA Certificate F3 (1)_compressed.pdf12 May 2026
Withdrawal Update Form 3File: CA Certificate F3 (1)_compressed.pdf12 May 2026
Withdrawal Update Form 1File: F3 Architect certificate.pdf31 Mar 2026
Withdrawal Update Form 2File: F3 Engineer certificate.pdf31 Mar 2026
Withdrawal Update Form 3File: F3 RERA CA certificate.pdf31 Mar 2026
Withdrawal Update Form 1File: F3 Architect certificate.pdf16 Feb 2026
Withdrawal Update Form 2File: F3 Engineer certificate.pdf16 Feb 2026
Withdrawal Update Form 3File: F3 RERA CA certificate.pdf16 Feb 2026
Form 1File: f1.pdf31 Oct 2025
Form 2File: F2.pdf31 Oct 2025
Form 3File: F3.pdf31 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold.pdf31 Oct 2025
Form 1File: F3 Arc certificate June 25.pdf4 Sep 2025
Form 2File: F3 Engg certificate June 25.pdf4 Sep 2025
Form 3File: FORM 3 F3- June 25.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: s un.pdf4 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERITIFICATE F3_compressed.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERITIFICATE F3 (3)_compressed.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERITIFICATE F3_compressed.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F3 Architect certificate Q2-24-25.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 CA Certificate_compressed Q2-24-25.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F3 Engineers Certificate Q2-24-25.pdf29 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F3 Architect Certificate Q1 24-25.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F3 Quality Assurance Certificate 23-24.pdf16 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F3 Engineer's Certificate Q1 24-25.pdf16 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: F3 Quality Assurance Certificate 23-24.pdf16 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 CA Certificate Q1 24-25.pdf16 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F3 Stella Q4 23-24 ARCHITECT CERTIFICATE.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F3 Stella Q4 23-24 ENGINEER'S CERTIFICATE.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: F3 Stella Q4 23-24 CA CERTIFICATE_compressed.pdf12 Jul 2024
Copy of the legal title reportFile: Search Report-1-5_11zon (1).pdf25 Jan 2024
Copy of the legal title reportFile: Search Report-6-10_11zon (1).pdf25 Jan 2024
Copy of the legal title reportFile: Search Report-11-15_11zon (1).pdf25 Jan 2024
Other - LegalFile: 7 12.pdf25 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: F3 - Annexure A.pdf18 Jan 2024
Other - TechnicalFile: Annuxure.pdf18 Jan 2024
Copy of the legal title reportFile: 1 Copy of the legal title report (15).pdf11 Jan 2024
Declaration in FORM BFile: Stella F3 - Form B.pdf11 Jan 2024
CERSAI detailsFile: CERSAI F3.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 25Jan 2023.pdf11 Jan 2024
Proforma of Agreement for saleFile: Agreement to sale Final 25 Jan 2024.pdf11 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report - F3_11zon.pdf11 Jan 2024
Other - LegalFile: Correction Deed.pdf11 Jan 2024
Other - LegalFile: SALES DEED-1-20_3_11zon.pdf11 Jan 2024
Other - LegalFile: SALES DEED-21-41_1_11zon.pdf11 Jan 2024
Other - LegalFile: SALES DEED-42-62_2_11zon.pdf11 Jan 2024
Other - LegalFile: SALES DEED-63-71.pdf11 Jan 2024
Layout approvalFile: F-3 (PLOT AREA DECLARATION).pdf8 Jan 2024
Layout approvalFile: Main Layout_rotated (1).pdf8 Jan 2024
Building plan approvalFile: Building F3 Elevation and Ground abd Mezz Floor plan.pdf8 Jan 2024
Building plan approvalFile: Parking Plan.pdf8 Jan 2024
PAN CardFile: 1 PAN Card (1).pdf8 Jan 2024
Details of encumbrances concerned to FinanceFile: F-3 (ENCUMBRAMECES DECLARATION).pdf8 Jan 2024
Details of encumbrances concerned to LegalFile: F-3 (ENCUMBRAMECES DECLARATION).pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: Main Layout_rotated (1).pdf8 Jan 2024
Copy of Layout Approval (in case of layout)File: F-3 (PLOT AREA DECLARATION).pdf8 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Building F3 Elevation and Ground abd Mezz Floor plan.pdf8 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Parking Plan.pdf8 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Dudulgaon.pdf8 Jan 2024
Declaration about Commencement CertificateFile: F-3 (COMMENCEMENT CERTIFICATE DECLARATION).pdf8 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (2) (1) (1).pdf8 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (1) (1).pdf8 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations.pdf8 Jan 2024
Proforma of Allotment letterFile: F-3 ( MODEL FORM OF ALLOTMENT )_11zon.pdf8 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: F-3 (BANK ACCOUNT DECLARATION) (1).pdf8 Jan 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (2).pdf8 Jan 2024

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep STELLA F3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dudulgaon, Moshi13,700+ in Pune

Builder: DMK INFRASTRUCTURE PVT LTD

DMK INFRASTRUCTURE PVT LTD has 7 registrations on MahaRERA, including STELLA and CROWN C1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if STELLA F3 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of STELLA F3?

The registered promoter entity is DMK INFRASTRUCTURE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in STELLA F3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against STELLA F3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for STELLA F3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at STELLA F3?

The professionals named in the filing: Architect: AR SUNIL NAWALE; Engineer: Mr. Vishal Ingle; Engineer: SWAPNIL BONDAR; Chartered Accountant: DAPNS & Co. Chartered Accountants; Chartered Accountant: GANDHI KALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in STELLA F3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About STELLA F3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save STELLA F3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.