Home / Browse projects / Pune, Maharashtra / SRIDHAM
SRIDHAM
RG-MH-92105 · RERA P52100051585 · Last updated on MahaRERA portal: 21 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SRIDHAM is a Residential / Group Housing project by R P PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100051585 on 27 Jun 2023. Possession is promised by 30 Dec 2026. 133 of the 237 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSRIDHAM
- TypeResidential / Group Housing
- Location
- D Y PATIL KNOWLEDGE CITY
- PCMC
- CHARHOLI
- Haveli
- Pune
- 412105
- Pincode412105
- RERA no.P52100051585
- ReraGenie IDRG-MH-92105
Builder
- NameR P PROPERTIES
- Entity typePartnership
- PartnerARVIND JAIN
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jun 2023
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed82 files
Current status
Figures as on 21 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SRIDHAM L BUILDING | NA | 27 | 23 | 237 | 0 | 237 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 95%.
SRIDHAM L BUILDING: 99% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 70% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed137
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SRIDHAM L BUILDING | NA | Rs 35.37 cr | Rs 32.61 cr |
| - | NA | Rs 10.61 cr | Rs 9.55 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAHUL INCOME |
| Architect | RAHUL ARUN NIKAM |
| Engineer | SANJAY KUMAR ASTEKAR |
| Engineer | Vaibhav Bapurao Jadhav |
| Engineer | SHANTANU GANJAVE |
| Chartered Accountant | Amit Satish Shingvi |
| Chartered Accountant | AMITSATISH SHINGVI |
| Chartered Accountant | SAC &Co LLP |
| Chartered Accountant | Shah Khandelwal Jain and Associates |
| Partner | Role in project |
|---|---|
| R P PROPERTIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: QTY ASSURANCE CERT FORM 2A SRIDHAM.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Sridham.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Sridham.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Shridham.pdf | 16 Apr 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERT FORM 1 SRIDHAM 17012026.pdf | 2 Feb 2026 |
| Withdrawal Update Form 2File: Engineers Certificate Sridham (2).pdf | 2 Feb 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 2 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5 upload.pdf | 2 Dec 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 25 Nov 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 25 Nov 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 25 Nov 2025 |
| Form 1File: Form 1.pdf | 16 Oct 2025 |
| Form 2File: Form 2.pdf | 16 Oct 2025 |
| Form 3File: Form 3.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold circular.pdf | 16 Oct 2025 |
| Form 1File: ARCHITECT CERT SRIDHAM L BLDG 30062025.pdf | 16 Oct 2025 |
| Form 2File: ENGINEER CERT SRIDHAM L BLDG 30062025.pdf | 16 Oct 2025 |
| Form 3File: Form 3 upload.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold circular.pdf | 16 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Pride Sridham.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT SRIDHAM L 31032025.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT SRIDHAM L 31032025.pdf | 11 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT SRIDHAM 31032025.pdf | 11 Apr 2025 |
| Layout approvalFile: BOSTON LAYOUT 2025compressed.pdf | 11 Feb 2025 |
| Building plan approvalFile: BOSTONBLD L SECTION ELEVATION MHADA.pdf | 11 Feb 2025 |
| Building plan approvalFile: BOSTONBLD L STILET 1ST FOOR PLAN MHADA.pdf | 11 Feb 2025 |
| Building plan approvalFile: BOSTONBLD L TYP REFUGE FOOR PLAN MHADA.pdf | 11 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: BOSTON LAYOUT 2025compressed.pdf | 11 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD L SECTION ELEVATION MHADA.pdf | 11 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD L STILET 1ST FOOR PLAN MHADA.pdf | 11 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD L TYP REFUGE FOOR PLAN MHADA.pdf | 11 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT SRIDHAM 16012025.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi SRIDHAM.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT SRIDHAM L BLDG 3112024.pdf | 10 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERT SRIDHAM.pdf | 10 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SRIDHAM 31032024.pdf | 17 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT FORM 3 SRIDHAM 15102024.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT SRIDHAM L BLDG 30092024.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT SRIDHAM L BLDG 30092024.pdf | 11 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT SRIDHAM 30092024.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sridham.pdf | 29 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT SRIDHAM L 30062024.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT SRIDHAM L 30062024.pdf | 26 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT SRIDHAM 30062024.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT SRIDHAM L 31032024.pdf | 11 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT SRIDHAM L BLDG 31032024.pdf | 11 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QTY ASSURANCE CERT SRIDHAM 31032024.pdf | 11 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shridham Form 3.pdf | 17 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SRIDHAM L BUILDING.pdf | 16 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHRIDHAM L BLDG ENGINEER CERTIFICATE DEC 2023.pdf | 16 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SRIDHAM.pdf | 16 Jan 2024 |
| Building plan approvalFile: SRIDHAM FLOOR PLAN 1.pdf | 11 Oct 2023 |
| Building plan approvalFile: SRIDHAM FLOOR PLAN 2.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SRIDHAM FLOOR PLAN 1.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SRIDHAM FLOOR PLAN 2.pdf | 11 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED CC.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C ACERT SRIDHAM 07062023.pdf | 7 Jun 2023 |
| Layout approvalFile: SRIDHAM LAYOUT PLAN.pdf | 6 Jun 2023 |
| Building plan approvalFile: SRIDHAM L BUILDING FLOOR PLAN.pdf | 6 Jun 2023 |
| PAN CardFile: R P Properties PAN CARD.pdf | 6 Jun 2023 |
| Copy of the legal title reportFile: FORMAT A SRIDHAM TITLE REPORT.pdf | 6 Jun 2023 |
| Copy of the legal title reportFile: DETAIL TITLE REPORT.pdf | 6 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: SELF DECLARATION SRIDHAM 05062023.pdf | 6 Jun 2023 |
| Details of encumbrances concerned to LegalFile: SELF DECLARATION SRIDHAM 05062023.pdf | 6 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: SRIDHAM LAYOUT PLAN.pdf | 6 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: SRIDHAM L BUILDING FLOOR PLAN.pdf | 6 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: SR NO 122 C C.pdf | 6 Jun 2023 |
| Declaration about Commencement CertificateFile: C C DECLARATION SRIDHAM 05062023.pdf | 6 Jun 2023 |
| Declaration in FORM BFile: FORM B AFFIDAVIT SRIDHAM 05062023.pdf | 6 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate SRIDHAM.pdf | 6 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate SRIDHAM.pdf | 6 Jun 2023 |
| CERSAI detailsFile: CERSAI UNDERTAKING SRIDHAM 05062023.pdf | 6 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A AP JAIN.pdf | 6 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DP JAIN.pdf | 6 Jun 2023 |
| Proforma of Agreement for saleFile: AGREEMENT DRAFT.pdf | 6 Jun 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER DRAFT.pdf | 6 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPARATE BANK ACCOUNT DETAILS.pdf | 6 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SRIDHAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PCMC13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: R P PROPERTIES
R P PROPERTIES has 3 registrations on MahaRERA, including BOSTON A B C and SRIDHAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SRIDHAM is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SRIDHAM?
The registered promoter entity is R P PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SRIDHAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SRIDHAM?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SRIDHAM?
The professionals named in the filing: Architect: RAHUL INCOME; Architect: RAHUL ARUN NIKAM; Engineer: SANJAY KUMAR ASTEKAR; Engineer: Vaibhav Bapurao Jadhav; Engineer: SHANTANU GANJAVE; Chartered Accountant: Amit Satish Shingvi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SRIDHAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback