Home / Browse projects / Mumbai Suburban, Maharashtra / SRI SAVAA
SRI SAVAA
By AVISA NEXTGEN CONSTRUCTION LLP
RG-MH-18304 · RERA P51800077068 · Last updated on MahaRERA portal: 14 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
- Rs 55.00 crore secured on the land, in favour of AU SMALL FINANCE BANK LIMITED
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SRI SAVAA is a Others project by AVISA NEXTGEN CONSTRUCTION LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077068 on 23 Jul 2024. Possession is promised by 31 Dec 2027. The completion date has moved by 12 months from the original filing. 5 of the 41 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSRI SAVAA
- TypeOthers
- Location
- AT JAWAHAR NAGAR
- GOREGAON (WEST)
- Pahadi-Goregaon
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800077068
- ReraGenie IDRG-MH-18304
Builder
- NameAVISA NEXTGEN CONSTRUCTION LLP
- Entity typePartnership
- PartnersANJALI D PANDIT, DHARMESH RAMCHARAN PANDIT, VIDHI DHARMESH PANDIT
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Jul 2024
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2026)
- Buildings1 building record
- Documents filed70 files
Current status
Figures as on 14 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 3 | NA | 13 | 12 | 3 | 38 | 41 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 54%.
BUILDING NO 3: 49% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 54% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 19% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 36% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 9% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 24% |
Progress on shared amenities15
As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 13% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| MRS. ANJALI D PANDIT | Goregaon | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING NO 3 | NA | Rs 39.60 cr | Rs 14.32 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR DESIGN STUDIO |
| Engineer | MR YASHAVANT S PANDIT |
| Engineer | rupesh chowdhary |
| Chartered Accountant | NEHALI & CO |
| Partner | Role in project |
|---|---|
| AVISA NEXTGEN CONSTRUCTION LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe submit this application seeking an extension of the project completion period for our redevelopment project, Sri Savaa. The project details are as follows Existing Approvals 0 FSI 100 No. P-6705/2021/1617 And Other)/P/S Wara/PAHADI GOREGAON-W/337/1/New dated 28 November 2023 Commencement Certificate No P-705/2021/1617 And Other)/P/S Ward/PAHADI GOREGAON-W/CC///New dated 20 March 2024 RERA NO P51800077068 with project completion date 31 December 2026 Project Details: Proposed building: 2 basement Ground 23 upper floors Reasons for Extension, During the pilling work (completed between 03 Apri
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1185/2015 | CITY CIVIL COURT DINDOSHI MUMBAI | NOTICE OF MOTION FOR HEARING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Aug 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 SRI SAVAA JUNE 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: FROM 2 SRI SAVAA JUNE 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: FROM 3 SRI SAVAA JUNE 2026.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: architect.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: architect.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: 2026.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: 2026.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Architect Certificate.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: form 2.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 CA Certificate.pdf | 27 Feb 2026 |
| Layout approvalFile: Approved Amended Drawing highlight.pdf | 21 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1.pdf | 17 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 17 Nov 2025 |
| Withdrawal Update Form 3File: Fsigned Resigned 17-11-2025 CA Certificate-sri savaa sept 25.pdf | 17 Nov 2025 |
| Building plan approvalFile: 6705 Amendletter_signed.pdf | 13 Aug 2025 |
| Building plan approvalFile: 6705 Drawing.pdf | 13 Aug 2025 |
| Commencement certificateFile: 4 FurtherCC_signed.pdf | 13 Aug 2025 |
| Layout approvalFile: Sri Savaa Concession Drawing.pdf | 1 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: signed inventory disclosure format.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sigend Architect RERA Certificate 6705 09-04-2025 (1).pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate-sri savaa Mar 25 (1) SIGNED.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate-sri savaa Mar 25 (1) SIGNED.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: signed SRI SAVAA- FORM 2 - 31 MARCH 2025.pdf | 14 Apr 2025 |
| Layout approvalFile: 6705 Drawing.pdf | 9 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: 6705 Drawing.pdf | 9 Apr 2025 |
| Declaration in FORM BFile: form B 500 notry.pdf | 7 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure (2).pdf | 6 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: inventory discloser signed.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: INVENTORY DISCLOSURE_0001.pdf | 16 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY DISCLOSURE_0001.pdf | 16 Nov 2024 |
| Declaration in FORM BFile: Form B.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 8 Nov 2024 |
| Other - LegalFile: Declaration_merged.pdf | 19 Jul 2024 |
| Other - LegalFile: 2 NOC for redevelopment from JNS.pdf | 25 Jun 2024 |
| Other - LegalFile: 619 to 7 Merg property card.pdf | 25 Jun 2024 |
| Other - LegalFile: 617 pr new.pdf | 25 Jun 2024 |
| Other - LegalFile: 620 to 10 merg Property card.pdf | 25 Jun 2024 |
| Other - LegalFile: 621 to 10 merg property card.pdf | 25 Jun 2024 |
| Other - LegalFile: 622 to 12 merg property card.pdf | 25 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: no encumbrace legal.pdf | 20 Jun 2024 |
| Details of encumbrances concerned to LegalFile: no encumbrace legal.pdf | 20 Jun 2024 |
| Other - LegalFile: declration -1.pdf | 20 Jun 2024 |
| Other - TechnicalFile: plot area declaration.pdf | 23 May 2024 |
| Layout approvalFile: PLANS (4).pdf | 8 May 2024 |
| Building plan approvalFile: 3 IOD_signed (1).pdf | 8 May 2024 |
| PAN CardFile: Avisa Nextgen Construction LLP_PAN Card.pdf | 8 May 2024 |
| Copy of the legal title reportFile: Revised Final Title Certificate QUERY.pdf | 8 May 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE SELF DECLARATION (1) (1).pdf | 8 May 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE SELF DECLARATION (1) (1).pdf | 8 May 2024 |
| Copy of Layout Approval (in case of layout)File: PLANS (4).pdf | 8 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 IOD_signed (1).pdf | 8 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 6 FirstCC_signed.pdf | 8 May 2024 |
| Declaration about Commencement CertificateFile: Declarations.pdf | 8 May 2024 |
| Declaration in FORM BFile: FORM B (12).pdf | 8 May 2024 |
| CERSAI detailsFile: CERSAI DECLARATION (4) (2).pdf | 8 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: f Signed CA Certificate-sri savaa.pdf | 8 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI (15) (1).pdf | 8 May 2024 |
| Proforma of Allotment letterFile: allotment_letter_Shri_SAVA_MARKED_IN_RED_TO_BE_REMOVED_,_MARKED_IN_BLUE_CHANGES_MADE_BY_US | 8 May 2024 |
| Proforma of Agreement for saleFile: sri SAVA agreement for sale SRI SAVA FINAL.pdf | 8 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Rera Bank account letter.pdf | 8 May 2024 |
| Deviation Report with respect to Allotment letterFile: SIGNED deviation report allotment letter_0001.pdf | 8 May 2024 |
| Deviation Report with respect to model copy of AgreementFile: Sign Deviation report_0001.pdf | 8 May 2024 |
| Other - TechnicalFile: SIGNED annexure A_0001.pdf | 8 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SRI SAVAA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GOREGAON (WEST)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 371 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: AVISA NEXTGEN CONSTRUCTION LLP
AVISA NEXTGEN CONSTRUCTION LLP has 1 registration on MahaRERA, including SRI SAVAA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SRI SAVAA is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SRI SAVAA?
The registered promoter entity is AVISA NEXTGEN CONSTRUCTION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SRI SAVAA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SRI SAVAA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SRI SAVAA?
The professionals named in the filing: Architect: AR DESIGN STUDIO; Engineer: MR YASHAVANT S PANDIT; Engineer: rupesh chowdhary; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SRI SAVAA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback