Registration approved No litigation declared Residential/Group Housing project

SREEYAN SORIN

By T Sreenivasa Reddy & T Likitha

RG-KA-53714 · RERA PRM/KA/RERA/1250/303/PR/051126/009083 · Last updated on RERA Karnataka portal: 3 Nov 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2029Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 86 documents Report an error

SREEYAN SORIN is a Residential/Group Housing project by T Sreenivasa Reddy & T Likitha in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/051126/009083 on 5 Nov 2026. Possession is promised by 10 Dec 2029.

At a glance

Project

  • NameSREEYAN SORIN
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1250/303/PR/051126/009083
  • ReraGenie IDRG-KA-53714

Builder

  • NameT Sreenivasa Reddy & T Likitha
  • Entity typeOther ( Land Owners )
  • GSTIN29DXMPS6729C2ZU
  • Authorized SignatoryT SREENIVASA REDDY

Key dates

this monthRegisteredNov 2026PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Nov 2026
  • Promised completion10 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A---36036
Block B---36036

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 3 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 3 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
T Sreenivasa Reddy--
T Likitha--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 31.60 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 31.60 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTNS CHAKRAVATHI
EngineerMADAMANCHI SURENDRA NADH
Chartered AccountantBHASKARA REDDY

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed86

As listed on the registration, under the names the promoter filed them with; the newest 80 of 86 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/051126/009083 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Joint Ownership MOUFile: joint ownership mou.pdf3 Nov 2026
Water AffidavitFile: water affidavit.pdf3 Nov 2026
Joint Ownership MOUFile: Joint ownership MOU.pdf31 Oct 2026
Water AffidavitFile: Water affidavit.pdf31 Oct 2026
Water Panchayat NOC LetterFile: Water Panchayat NOC Letter.pdf31 Oct 2026
Project ongoing status ClarificationFile: Cost incurred clarification.pdf31 Oct 2026
Response Letter for the query raisedFile: Response letter.pdf16 Oct 2026
1. Property Sale DeedFile: 1 Property Sale Deed.pdf16 Oct 2026
2. EC from 1-4-2004 to till dateFile: 2 EC from 1-4-2004 to till date.pdf16 Oct 2026
3. FORM B NOTARISED AFFIDAVITFile: 3 FORM B NOTARISED AFFIDAVIT.pdf16 Oct 2026
4. Advocate Search ReportFile: 4 Advocate search report.pdf16 Oct 2026
5. NO LITIGATION AFFIDAVITFile: 5 NO LITIGATION AFFIDAVIT.pdf16 Oct 2026
6. Single plot approvalFile: 6 Single plot approval.pdf16 Oct 2026
7. Single plot approval blueprintFile: 7 Single plot approval blueprint.pdf16 Oct 2026
8. Demarcation of project landFile: 8 Demarcation of Project land.pdf16 Oct 2026
10.Amenities & FacilitiesFile: 10 AMENITIES AND FACILITIES.pdf16 Oct 2026
11.Form -6 Engineer CertificateFile: 11 Form -6 Engineer Certificate.pdf16 Oct 2026
12.Structural Stability CertificateFile: 12 Structural Stability Certificate.pdf16 Oct 2026
13.PROJECT SPECIFICATIONSFile: 13 PROJECT SPECIFICATIONS.pdf16 Oct 2026
14.Section 3(1) Notarized affidavitFile: 14 SECTION 3 (1) AFFIDAVIT.pdf16 Oct 2026
15.WATER NOCFile: 15 WATER NOC.pdf16 Oct 2026
16.Brief project estimation with licenced engineer signatureFile: 16 Brief Estimated Cost of Construction.pdf16 Oct 2026
.Land cost calculation sheet along with guidance certificate.File: 17 LAND COST CALCULATION SHEET & GV.pdf16 Oct 2026
18.Source of waterFile: 18 Source of water.pdf16 Oct 2026
19.SBI 100% ACCFile: 19 SBI 100% ACC.pdf16 Oct 2026
20.SBI 70% ACCFile: 20 SBI 70% ACC.pdf16 Oct 2026
21.SBI 30% ACCFile: 21 SBI 30% ACC.pdf16 Oct 2026
22a.Bank AffidavitFile: 22a BANK AFFIDAVIT.pdf16 Oct 2026
22b.SBI CONFORMATION LETTERFile: 22b SBI CONFORMATION LETTER.pdf16 Oct 2026
23.Form 1File: 23 FORM 1.pdf16 Oct 2026
24.Signed Financials combinedFile: 24 SIGNED FINANCIALS COMBINED.pdf16 Oct 2026
25.Source of FundsFile: 25 SOURCE OF FUNDS.pdf16 Oct 2026
26. Structural Engineer CertificateFile: 26 Certificate Engineer.pdf16 Oct 2026
RTC, survey 128/3-
Mutation, survey 128/3-
Encumbrance Certificate, survey 128/3-
Conversion/Alienation Order, survey 128/3-
Sale/Title/Gift Deed, survey 128/3-
Khatha, survey 128/3-
Registration CertificateFile: UDHYAM CERTIFICATE SORIN.pdf-
GST CertificateFile: sreeyan sorin gst certificate.pdf-
Certificate issued by CA Form 1File: FORM 1.pdf-
Certificate issued by Architect Form 2File: Form 2 Architects Certificate.pdf-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NO LITIGATION AFFIDAVIT.pdf-
Balance Sheet 2024 - 2025File: Computation 2024-25.pdf-
Balance Sheet 2023 - 2024File: Computation 2023-24.pdf-
Balance Sheet 2022 - 2023File: Computation.pdf-
Audited Profit and Loss Statement 2024 - 2025File: Computation 2024-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Computation 2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Computation.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: 2024-25.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: 2023-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: acknowledgement.pdf-
Commencement Certificate and approval order-
APPROVED PLAN-
Approved Drawings-
Project specifications-
Brochure-
Proforma of agreement of sale-
Model Allotment Letter-
No litigation affidavit-
Affidavit cum Declaration-
Affidavit cum Declaration-
No litigation affidavit-
Electricity NOC-
KSPCB NOC-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep SREEYAN SORIN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

Builder: T Sreenivasa Reddy & T Likitha

T Sreenivasa Reddy & T Likitha has 1 registration on RERA Karnataka, including SREEYAN SORIN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if SREEYAN SORIN is delayed beyond 10 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SREEYAN SORIN?

The registered promoter entity is T Sreenivasa Reddy & T Likitha, an other ( land owners ) as per the filing. Its GSTIN 29DXMPS6729C2ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SREEYAN SORIN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SREEYAN SORIN?

The professionals named in the filing: Architect: TNS CHAKRAVATHI; Engineer: MADAMANCHI SURENDRA NADH; Chartered Accountant: BHASKARA REDDY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SREEYAN SORIN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SREEYAN SORIN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SREEYAN SORIN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.